Wednesday, Oct 28, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Business | Adani Energy Solutions Wins Rs 4700 Crore Transmission Project In Maharashtra

Adani Energy Solutions wins Rs 4,700 crore transmission project in Maharashtra

Adani Energy Solutions has won a Rs 4,700 crore transmission project to evacuate 4,500 MW renewable energy from Karnataka to Maharashtra. The 36-month Satara project will add 562 circuit kilometres of lines and 9,000 MVA transformation capacity, supporting pumped storage and grid stability

By IANS
Published Date - 26 August 2026, 10:34 AM
Adani Energy Solutions wins Rs 4,700 crore transmission project in Maharashtra
whatsapp facebook twitter telegram

Ahmedabad: Adani Energy Solutions Ltd (AESL) on Wednesday said it has won a Rs 4,700 crore transmission project for evacuation of 4,500 MW of renewable energy generated in Karnataka to major load centres in Maharashtra.

The project will also support the growing pumped storage ecosystem in the Satara, Pune, and Mumbai Metropolitan Region (MMR). The project was won through the tariff based competitive bidding (TBCB) process, where AESL emerged as the lowest bidder, according to a company statement.


“Pumped storage projects are emerging as a critical enabler of India’s clean energy transition by providing the flexibility and reliability required to integrate large-scale renewable energy into the grid,” said Kandarp Patel, CEO, Adani Energy Solutions Ltd.

The Satara transmission project will create a vital transmission backbone to supports both renewable energy evacuation and energy storage deployment, strengthening power flows between Southern and Western India, he mentioned. Housed under Special Purpose Vehicle (SPV) Satara Power Transmission Ltd, the project will be delivered within 36 months.

It will add 562 circuit kilometres (ckm) of transmission lines and 9,000 MVA of transformation capacity to AESL’s portfolio, taking its cumulative transmission network to 29,739 ckm and 1,43,425 MVA transformation capacity, said India’s largest private transmission and distribution company and part of the globally diversified Adani portfolio.

“AESL remains committed to building future-ready transmission infrastructure that enables renewable energy growth, enhances grid stability and supports India’s long-term decarbonisation goals,” said Patel.

The project includes the establishment of a 765/400 kV substation at Satara, Kolhapur-Satara 765 kV double-circuit transmission line, and augmentation of the Kolhapur pooling station along with associated transmission infrastructure.

As the country advances toward its target of installing 500 GW of non-fossil energy capacity by 2030, AESL continues to lead the sector by building specialised transmission schemes that connect resource-rich green pockets — such as solar, wind, and pumped storage — with major industrial and urban load centres across India.

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • Adani Energy Solutions
  • Karnataka
  • Maharashtra
  • transmission project

Related News

  • Harish Rao accuses Congress of neglecting Kaleshwaram

    Harish Rao accuses Congress of neglecting Kaleshwaram

  • Maharashtra keeps Tummidihatti barrage proposal pending

    Maharashtra keeps Tummidihatti barrage proposal pending

  • Mysuru royal family head expresses disappointment over Dussehra 2026 management

    Mysuru royal family head expresses disappointment over Dussehra 2026 management

  • Adani Group refutes social media claims over alleged tree felling near Bhimashankar Temple

    Adani Group refutes social media claims over alleged tree felling near Bhimashankar Temple

Latest News

  • India beat Tanzania 48-20 to enter Commonwealth Kabaddi Championship semifinals

    2 hours ago
  • Woman throws her twin daughters into Manjeera river before jumping into it in Medak

    2 hours ago
  • Woman and youth found hanging at house in Kothagudem district

    2 hours ago
  • Medak farmer electrocuted at agricultural field in Rangaiapally

    2 hours ago
  • 28-year-old woman preparing for Group exams stabbed in Malakpet

    2 hours ago
  • Kajal Dhochak, Neelam Sirohi reach World Wrestling Championships finals

    3 hours ago
  • CM Chashak 41st Youth National Basketball Championship begins in Pune

    3 hours ago
  • ACB catches Mirchowk inspector, home guard in Rs. 3 lakh bribe case

    3 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App