Wednesday, Nov 18, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Business | Adani Energy Solutions Wins Rs 4700 Crore Transmission Project In Maharashtra

Adani Energy Solutions wins Rs 4,700 crore transmission project in Maharashtra

Adani Energy Solutions has won a Rs 4,700 crore transmission project to evacuate 4,500 MW renewable energy from Karnataka to Maharashtra. The 36-month Satara project will add 562 circuit kilometres of lines and 9,000 MVA transformation capacity, supporting pumped storage and grid stability

By IANS
Published Date - 26 August 2026, 10:34 AM
Adani Energy Solutions wins Rs 4,700 crore transmission project in Maharashtra
whatsapp facebook twitter telegram

Ahmedabad: Adani Energy Solutions Ltd (AESL) on Wednesday said it has won a Rs 4,700 crore transmission project for evacuation of 4,500 MW of renewable energy generated in Karnataka to major load centres in Maharashtra.

The project will also support the growing pumped storage ecosystem in the Satara, Pune, and Mumbai Metropolitan Region (MMR). The project was won through the tariff based competitive bidding (TBCB) process, where AESL emerged as the lowest bidder, according to a company statement.


“Pumped storage projects are emerging as a critical enabler of India’s clean energy transition by providing the flexibility and reliability required to integrate large-scale renewable energy into the grid,” said Kandarp Patel, CEO, Adani Energy Solutions Ltd.

The Satara transmission project will create a vital transmission backbone to supports both renewable energy evacuation and energy storage deployment, strengthening power flows between Southern and Western India, he mentioned. Housed under Special Purpose Vehicle (SPV) Satara Power Transmission Ltd, the project will be delivered within 36 months.

It will add 562 circuit kilometres (ckm) of transmission lines and 9,000 MVA of transformation capacity to AESL’s portfolio, taking its cumulative transmission network to 29,739 ckm and 1,43,425 MVA transformation capacity, said India’s largest private transmission and distribution company and part of the globally diversified Adani portfolio.

“AESL remains committed to building future-ready transmission infrastructure that enables renewable energy growth, enhances grid stability and supports India’s long-term decarbonisation goals,” said Patel.

The project includes the establishment of a 765/400 kV substation at Satara, Kolhapur-Satara 765 kV double-circuit transmission line, and augmentation of the Kolhapur pooling station along with associated transmission infrastructure.

As the country advances toward its target of installing 500 GW of non-fossil energy capacity by 2030, AESL continues to lead the sector by building specialised transmission schemes that connect resource-rich green pockets — such as solar, wind, and pumped storage — with major industrial and urban load centres across India.

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • Adani Energy Solutions
  • Karnataka
  • Maharashtra
  • transmission project

Related News

  • Farmers in Karnataka protest, seek water for chilli crops

    Farmers in Karnataka protest, seek water for chilli crops

  • Karnataka targets global leadership in AI and deep tech

    Karnataka targets global leadership in AI and deep tech

  • Maharashtra: PM Modi inaugurates projects worth Rs 3,000 crore in Gadchiroli

    Maharashtra: PM Modi inaugurates projects worth Rs 3,000 crore in Gadchiroli

  • Nanded raid: Beauty cream found with mercury levels 48,453 times permissible limit

    Nanded raid: Beauty cream found with mercury levels 48,453 times permissible limit

Latest News

  • Groundwater depletion raises summer water concerns in Medchal district

    5 hours ago
  • Palli Prince, M. Ramcharan score double centuries in HCA Under-19 league

    5 hours ago
  • TG- RERA imposes penalties on builders and developers for different violations

    6 hours ago
  • Cheyutha pension programme witnesses clashes across Telangana

    6 hours ago
  • Sourav Ganguly backs Rishabh Pant’s return to Delhi Capitals

    6 hours ago
  • Mahabubabad MP Balram Naik’s controversial remarks draws criticism on social media

    6 hours ago
  • Hyderabad’s SFR Snehit wins men’s singles title at National Ranking Table Tennis Championships

    7 hours ago
  • Editorial: Countering China’s dominance

    7 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App