Tuesday, Jul 7, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Andhra Pradesh | Andhra Pradesh Acmes 400 Mw Solar Project Sees Rapid Progress

Andhra Pradesh: ACME’s 400 MW solar project sees rapid progress

ACME Group’s 400 MW solar power project with battery storage in Anantapur has moved from approvals to construction in four months. The Rs 3,000-crore project, backed by the Andhra Pradesh government, is scheduled for commissioning by 2026.

By PTI
Published Date - 14 January 2026, 04:00 PM
Andhra Pradesh: ACME’s 400 MW solar project sees rapid progress
whatsapp facebook twitter telegram

Amaravati: ACME Group’s 400 MW solar power project with integrated battery energy storage in Andhra Pradesh has made rapid on-ground progress, moving from State-level approvals to construction within four months, the State government said.

The Rs 3,000-crore project, located in Anantapur district and developed under the Firm and Dispatchable Renewable Energy (FDRE) framework, combines large-scale solar generation with battery storage to deliver round-the-clock renewable power.


The project is scheduled for commissioning by 2026. Education, IT and Electronics Minister Nara Lokesh welcomed the pace of execution, saying swift movement from approvals to implementation reflected Andhra Pradesh’s focus on speed, certainty and effective investment facilitation.

Once commissioned, the project is expected to enhance grid stability and support India’s clean energy transition. The State government reiterated its commitment to fast-tracking renewable energy, storage and green manufacturing projects through proactive support, ready land banks and a responsive single-desk clearance system.

“Speed matters. Happy to see progress from State Govt approval to ground action in 4 months at ACME’s 400 MW solar + battery storage project in Anantapur. This Rs 3,000 crore project will be commissioned by 2026. Andhra Pradesh is proud to be a partner in boosting grid reliability and accelerating India’s clean energy journey,” Lokesh said.

The ACME FDRE project aligns with Andhra Pradesh’s broader strategy to emerge as a national hub for renewable energy and advanced power solutions, leveraging ready land banks, robust transmission infrastructure, and a responsive single-desk clearance system.

  • Follow Us :
  • Tags
  • Andhra Pradesh News
  • Firm and Dispatchable Renewable Energy (FDRE)
  • Nara Lokesh
  • solar project

Related News

  • Lokesh seeks MEA intervention for Telugu family stuck in Hong Kong

    Lokesh seeks MEA intervention for Telugu family stuck in Hong Kong

  • Nara Lokesh seeks Jaishankar’s help for Telugu family stranded at Hong Kong airport after losing passports

    Nara Lokesh seeks Jaishankar’s help for Telugu family stranded at Hong Kong airport after losing passports

  • Andhra Premier League T20 final: Bhimavaram Bulls crush Simhadri Vizag Lions by 10 wickets to lift title

    Andhra Premier League T20 final: Bhimavaram Bulls crush Simhadri Vizag Lions by 10 wickets to lift title

  • President Droupadi Murmu flags youth power as vital catalyst for Viksit Bharat at Central University of Andhra Pradesh convocation

    President Droupadi Murmu flags youth power as vital catalyst for Viksit Bharat at Central University of Andhra Pradesh convocation

Latest News

  • Microsoft cuts 4,800 jobs globally, including 1,600 in Xbox

    3 hours ago
  • Shri Ram Janmabhoomi Trust accepts Champat Rai’s resignation, appoints acting General Secretary

    3 hours ago
  • NIA charges LeT chief Hafiz Saeed in Pahalgam attack

    3 hours ago
  • Wimbledon 2026: Flavio Cobolli advances to quarterfinals after beating de Minaur

    3 hours ago
  • Editorial: Eleven years on, Digital Mission still faces challenges

    3 hours ago
  • SLBC tunnel to be completed by June 2028, says Uttam Kumar Reddy

    3 hours ago
  • Assam Rifles convoy ambushed, two personnel killed

    3 hours ago
  • Opinion: China’s waiting game on Line of Actual Control

    3 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam