AIMIM President Asaduddin Owaisi inspecting ongoing Nala widening works at Dabeerpura Under Yakutpura Assembly Constituency on Monday.
Hyderabad: Hyderabad MP Asaduddin Owaisi inspected the ongoing nala widening works at Dabeerpura under Yakutputa Assembly Constituency here on Monday.
GHMC is taking up the nala widening works in two Phases with an estimated cost of Rs 3.93 crore. In the first phase, the works at Dabeerpura Darwaza are being taken up with an estimated cost 1.98 crore and in the second phase, works from Puranai Haveli to Ganga Nagar nala are planned with a cost of 1.95 crore, which includes nala extension, desilting, construction of retaining wall and CC slab.
Owaisi requested the municipal corporation officials to expedite the nala works and complete them at the earliest. He was accompanied by Yakutpura MLA Syed Ahmed Pasha Quadri, MLC Mirza Riyaz Ul Hasan Effandi, AIMIM Party Corporators, said a press release.
Now you can get handpicked stories from Telangana Today onTelegrameveryday. Click the link to subscribe.