Sunday, Aug 2, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Centre Halts Sharavathy Hydro Project Over Threat To Western Ghats Biodiversity

Centre halts Sharavathy hydro project over threat to Western Ghats biodiversity

The Centre has deferred forest clearance for Karnataka’s 2,000-MW Sharavathy Pumped Storage Project, citing potential “enormous damage” to biodiversity in the Western Ghats, including threats to Lion-Tailed Macaques and endemic flora in the Sharavathy Valley Sanctuary

By PTI
Published Date - 9 November 2025, 05:26 PM
Centre halts Sharavathy hydro project over threat to Western Ghats biodiversity
whatsapp facebook twitter telegram

New Delhi: The Centre has deferred a proposal to divert around 54 hectares of forest land in the ecologically sensitive Western Ghats for the 2,000-megawatt Sharavathy Pumped Storage Hydroelectric Project in Karnataka after members flagged serious ecological concerns and violations of forest laws.

According to the minutes of the 11th meeting of the Environment Ministry’s Forest Advisory Committee held on October 27, the proposed project area lies within the Sharavathy Valley Lion-Tailed Macaque Sanctuary, which is located in the central regions of the Western Ghats.


The committee said the project involves the felling of more than 15,000 trees, many of which are endemic to the Western Ghats, one of the 34 global biodiversity hotspots. It said the forest tracts fall under “eco-class 1 and eco-class 3” with canopy densities of 0.5 and 0.2.

The area has “climax forests of tropical wet evergreen, semi-evergreen and shola grasslands”, which are “highly vulnerable and complex ecosystems”, which, “if destroyed, cannot be restored to their original State”.

The minutes said the project site supports Lion-Tailed Macaque, Tiger, Leopard, Sloth Bear, Wild Dogs, King Cobra, Malabar Giant Squirrel, and other rare and endemic species. It referred to a wildlife census that recorded 730 Lion-Tailed Macaques in the Sharavathy Valley Sanctuary and warned that “loss of canopy and habitat would intensify this fragmentation, posing a serious risk to the survival of LTMs”.

The panel recorded that the compensatory afforestation site offered by the project proponent will not be able to compensate for the loss of habitat of the Lion-Tailed Macaque and that “wet evergreen forests are complex ecosystems and are quite difficult to replicate”.

The committee examined the engineering design and said the project involves two reservoirs, tunnels up to 3.2 km long, excavation to depths of up to 500 metres, and drilling and blasting for underground works.

It said the area falls in Seismic Zone 3 and that the combination of slope cutting, blasting, and heavy monsoon rainfall could aggravate landslide and erosion risks. It warned that such work can be disastrous not only to the ecology of the area but also to human habitations.

The minutes said the Deputy Inspector General of Forests (Central), Regional Office Bengaluru, “has not recommended the proposal” because of its location inside the Sharavathy Valley Sanctuary and the ecological sensitivity of the central Western Ghats.

The Chief Wildlife Warden of Karnataka also raised objections, warning that implementation of the project can cause “enormous damage” to the flora and fauna of the landscape. The FAC cited his observation that the ecological fallout far outweighs the economic benefits that may be accrued by commissioning this project.

The committee further said that transmission line routes proposed for the evacuation of power prima facie appear to violate the Forest (Conservation) Act, 1980, and that forest clearance for those lines is not clear.

According to the minutes, the committee expressed concern over the proposed compensatory afforestation areas, saying that “the CA sites proposed are ecologically different from the wet evergreen forests being lost.” It said the project proponent must prepare a scientifically designed wildlife mitigation plan and conduct a detailed hydrological study before the proposal can be considered.

The FAC directed that tree felling be avoided or reduced to the bare minimum and that the layout of the project shall be finalised in consultation with the Chief Wildlife Warden and as per the approved wildlife management plan.

After detailed deliberations, the committee decided to defer the proposal and sought additional information and clarifications from the State government and the user agency.

  • Follow Us :
  • Tags
  • biodiversity
  • ecology
  • Environment Ministry
  • forest conservation

Related News

  • Karnataka CM urges withdrawal of bandh call over Cauvery row

    Karnataka CM urges withdrawal of bandh call over Cauvery row

  • TN to receive Kabini water by Monday as K’taka releases 12,000 cusecs

    TN to receive Kabini water by Monday as K’taka releases 12,000 cusecs

  • No ban on religious attire in police recruitment exam: Priyank Kharge

    No ban on religious attire in police recruitment exam: Priyank Kharge

  • Stalin seeks all-party meet over Cauvery, slams Vijay

    Stalin seeks all-party meet over Cauvery, slams Vijay

Latest News

  • India U20 squad announced for two preparatory matches against Singapore

    11 mins ago
  • KTR turns Revanth’s criminal waste barb on Rahul, demands apology

    18 mins ago
  • Five killed, 41 missing after ferry catches fire off Indonesia’s East Java coast

    22 mins ago
  • From Glasgow to Amdavad: India begins countdown to the 2030 Commonwealth Games

    24 mins ago
  • Wakf Board files complaint over alleged land encroachment near Hyderabad airport

    24 mins ago
  • Residents demand JBS-Medchal Metro corridor under Phase II

    31 mins ago
  • Pursue goals with committment, discipline: JNTUH Registrar Prof Jayalakshmi

    35 mins ago
  • Commonwealth Games: India’s cycling campaign ends after Ronaldo Singh finishes 20th

    38 mins ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam