Wednesday, Jul 22, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | News | Centre Okays First Large Scale Solar Power Project On Defence Land In Up

Centre okays first large-scale solar power project on defence land in UP

Defence Minister Rajnath Singh has approved a 250 MW solar power project with battery energy storage on 850 acres of defence land in Sitapur, Uttar Pradesh. Implemented by NTPC, the project aims to boost clean energy, enhance energy security and reduce power costs

By PTI
Published Date - 9 June 2026, 02:49 PM
Centre okays first large-scale solar power project on defence land in UP
whatsapp facebook twitter telegram

New Delhi: Defence Minister Rajnath Singh has approved the establishment of a 250 MW solar power project with battery energy storage system (BESS) on approximately 850 acres of vacant defence land at Uttar Pradesh’s Sitapur, in a major step towards promoting renewable energy in the country, according to a Defence Ministry statement on Tuesday.

This is the first-of-its-kind project undertaken by the Ministry of Defence (MoD), involving the development of a large-scale solar power generation facility with integrated BESS support on defence land, the statement said.


NTPC Limited is implementing the project through a competitive bid process to realise the most optimal energy pricing and savings for defence establishments.

The project, to be implemented in close coordination with the Integrated HQ of MoD (Army) (IHQ) and the Directorate General Defence Estates (DGDE), represents a convergence of national security, energy security, technological innovation and environmental sustainability, highlighting the commitment of the Ministry of Defence to leverage its assets in support of national development goals while safeguarding strategic interests, as per the statement.

The ministry, NTPC, the IHQ, and DGDE will work in close coordination to ensure the timely implementation of the project. Upon completion, the Sitapur Solar Power Project is expected to emerge as one of the country’s most significant renewable energy projects established on defence land and a benchmark for future solar-plus-storage projects in the defence sector, the statement said.

The initiative reflects the government’s commitment towards clean energy, sustainability and the reduction of dependence on conventional energy sources. Besides strengthening long-term energy security for the defence forces, the project is expected to substantially reduce expenditure incurred on procurement of conventional grid power for defence establishments, resulting in significant savings to the government exchequer over the life cycle of the project, the statement added.

 

  • Follow Us :
  • Tags
  • Battery Energy Storage System
  • BESS
  • Defence Ministry
  • Rajnath Singh

Related News

  • Mehbooba urges people to save Jauhar University from demolition

    Mehbooba urges people to save Jauhar University from demolition

  • Mayawati seeks Parliament debate on Ayodhya temple row, public issues

    Mayawati seeks Parliament debate on Ayodhya temple row, public issues

  • Man arrested in UP’s Kanpur with 171 protected Indian Roofed Turtles

    Man arrested in UP’s Kanpur with 171 protected Indian Roofed Turtles

  • SC issues notice to Ram Temple Trust, seeks SIT status report on donation probe

    SC issues notice to Ram Temple Trust, seeks SIT status report on donation probe

Latest News

  • US to impose steep tariffs on generic medicine imports from Aug 2028

    6 mins ago
  • SC declines urgent listing of plea against police action during CJP protest

    13 mins ago
  • CJP protesters continue sit-in at Jantar Mantar; more supporters gather overnight

    17 mins ago
  • Two Karnataka youth rescued from Chinese-operated scam compound in Myanmar

    18 mins ago
  • Bhojshala row: SC to hear Muslim side’s plea over alternate namaz site, seeks response of MP

    28 mins ago
  • EAM Jaishankar holds talks with Chinese FM Wang Yi in Manila, says ties gradually normalising

    34 mins ago
  • 4.2 magnitude earthquake hits western Nepal

    42 mins ago
  • Visakhapatnam emerges as India’s fastest-growing non-metro hiring hub

    8 mins ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam