Monday, Apr 20, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Telangana | Energy Secretary Asks Power Utilities To Gear Up For Summer Power Demand

Energy Secretary asks power utilities to gear up for summer power demand in Telangana

Sultania directed the Chairman and Managing director of TGGENCO, TRANSCO , SPDCL and NPDCL to take measures to ensure that there was no shortage of power during the ensuing summer.

By Telangana Today
Updated On - 23 November 2024, 08:43 PM
Energy Secretary asks power utilities to gear up for summer power demand in Telangana
whatsapp facebook twitter telegram

Hyderabad: With the State power demand expected to increase considerably during the upcoming summer, Energy Secretary Sandeep Kumar Sultania directed top officials of State run power utilities to take strong measures to ensure that there was no disruption in the power during the summer season.

Sultania, who held a review meeting on Saturday, directed the Chairman and Managing director of TGGENCO, TRANSCO , SPDCL and NPDCL to take measures to ensure that there was no shortage of power during the ensuing summer. The officials were directed to complete the work undertaken as part of the summer action plan by January 31 at any costs.


There was an increase of power demand by 15 percent during the summer this year and it was expected to increase during the ensuing summer, hence, there was a need to take steps to increase the capacity of transformers in Extra High Tension (EHT) and 33/11 kV substations by summer and to install new transformers in the required areas, he said.

The CMDs said the capacity of TRANSCO EHT substations was being increased in RC Puram and Bowrampet areas and that steps had been taken to make the Jadcharla and Narayanpur 132 kV circuits, which were under construction, available soon. They stated that the repair work undertaken as part of the Summer Action Plan under SPDCL and NPDCL was being carried out at a fast pace.

  • Follow Us :
  • Tags
  • Hyderabad
  • Jadcharla
  • NPDCL
  • Sandeep Kumar Sultania

Related News

  • SCB move to collect property tax directly triggers confusion

    SCB move to collect property tax directly triggers confusion

  • Power outages disrupt Manjeera water supply in Hyderabad

    Power outages disrupt Manjeera water supply in Hyderabad

  • TGCHE seeks police probe into impersonation fraud calls

    TGCHE seeks police probe into impersonation fraud calls

  • Telangana: RTC unions firm on strike, public transport system may see major disruption

    Telangana: RTC unions firm on strike, public transport system may see major disruption

Latest News

  • Jeevan Reddy named BRS general secretary; KCR calls him key pillar

    42 mins ago
  • Opinion: India’s Budget still undervalues orange economy

    1 hour ago
  • BRS will return to power with clear majority, declares KCR; vows revival of Telangana

    1 hour ago
  • Editorial: Much ado about India’s GDP rankings

    1 hour ago
  • Joining BRS is a turning point in my career, says Jeevan Reddy

    31 mins ago
  • JEE-Main: 26 candidates achieve 100 NTA score; AP and Telangana lead

    2 hours ago
  • Revanth Reddy says Medigadda inspection pre-planned, slams BRS

    2 hours ago
  • BRS flexis, banners flood Jagtial as Praja Ashirvada Sabha draws huge crowd

    2 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

.