Monday, Sep 28, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Flashfloods Block Doda Kishtwar Highway Bury Vehicles At Under Construction Kwar Power Project

Flashfloods block Doda-Kishtwar highway, bury vehicles at under-construction Kwar power project

Flash floods and landslides triggered by heavy overnight rain damaged the Doda-Kishtwar highway and disrupted traffic in Jammu and Kashmir. Several vehicles were buried near the Kwar Hydroelectric Power Project, while authorities launched restoration work and issued safety advisories

By PTI
Published Date - 6 July 2026, 11:59 AM
Flashfloods block Doda-Kishtwar highway, bury vehicles at under-construction Kwar power project
whatsapp facebook twitter telegram

Jammu: Flash floods triggered by incessant overnight rainfall damaged the Doda-Kishtwar highway on Monday, disrupted vehicular traffic and buried several vehicles near the under-construction 540 MW Kwar Hydroelectric Power Project in the hilly districts of Doda and Kishtwar.

Huge quantities of mud, boulders and debris was deposited on the highway following the flash floods.


Officials said that a portion of the highway was damaged, forcing the suspension of traffic. Several vehicles parked along the roadside at Prem Nagar were trapped in the flood debris. However, no loss of life or injuries were reported, they said.

Road clearance and restoration work has been launched by authorities, while commuters have been advised to avoid the highway and follow official traffic advisories until the route is reopened.

In neighbouring Kishtwar district, heavy rainfall also triggered a major landslide and mudslide near the tunnel area of the under-construction 540 MW Kwar hydroelectric power project.

Officials said flash floods carried large volumes of mud and boulders into the project area, burying several vehicles, including trucks, dozers and other construction equipment, besides damaging construction material.

Multiple vehicles sustained extensive damage and remain trapped under the debris, they said, adding clearance operations are underway to retrieve the stranded vehicles and restore the affected site.

Minor flash flood incidents were also reported from high-altitude areas of Reasi district, officials said.

The administration had earlier issued a weather advisory warning of heavy rainfall, thunderstorms, flash floods and landslides in vulnerable areas of Jammu and Kashmir, urging people, particularly those living near riverbanks and nallahs, to remain alert and avoid unsafe locations.

According to the Meteorological department, Samba recorded the highest rainfall in Jammu region during the previous 24 hours ending at 8.30 am on Monday with 90 mm, followed by Kathua (66.2 mm), Katra (44.4 mm), Doda (42 mm), Jammu (41.8 mm), Udhampur (40.6 mm), Bhaderwah (33.6 mm), Kishtwar (24 mm), Reasi (10.5 mm), Batote (4.7 mm), Ramban (4.5 mm) and Banihal (0.4 mm).

  • Follow Us :
  • Tags
  • Doda
  • Flash Floods
  • Jammu and Kashmir
  • Kishtwar

Related News

  • Relentless rainfall triggers floods, landslides across Nepal

    Relentless rainfall triggers floods, landslides across Nepal

  • Nepal flood toll reaches 1,453, thousands still missing

    Nepal flood toll reaches 1,453, thousands still missing

  • J-K CM Omar Abdullah moves statehood resolution amid BJP ruckus in assembly

    J-K CM Omar Abdullah moves statehood resolution amid BJP ruckus in assembly

  • Three rusted mines found in J&K’s Poonch, safely destroyed

    Three rusted mines found in J&K’s Poonch, safely destroyed

Latest News

  • Iran captures US REMUS 600 submarine in Strait of Hormuz

    34 minutes ago
  • Telangana to fast-track pending Urban Land Ceiling applications

    47 minutes ago
  • Opinion: Five-day banking: Reform or disruption?

    48 minutes ago
  • Election Commission row: Kishan Reddy slams Congress over EVM allegations

    1 hour ago
  • Village, ward secretariat staff scuffle with police during Chalo Vijayawada protest

    1 hour ago
  • Editorial: Shrinking rural jobs a bitter reality

    2 hours ago
  • Bank unions defer nationwide strike after IBA assurance; banks to open Monday

    2 hours ago
  • Gujarat police files FIR over alleged Rs 1,143 crore political donation racket

    2 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App