Thursday, Oct 22, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Hyderabad | Get Ready To Zoom On Balanagar Flyover Soon

Get ready to zoom on Balanagar flyover soon

The Hyderabad Metropolitan Development Authority (HMDA) project will ease traffic from the Kukatpally Y Junction towards the Medchal Highway and the Rajiv Rahadari.

By Telangana Today
Updated On - 8 June 2021, 12:36 AM
Get ready to zoom on Balanagar flyover soon
Photo: Surya Sridhar
whatsapp facebook twitter telegram

Hyderabad: This could be one flyover, along which you can literally fly over the traffic below. The city’s first flyover that has been designed for a commuting speed of 60 kmph will be inaugurated in Balanagar this month. As of now, the maximum speed limit on all other city flyovers is 40 kmph. The 1.13 km six-lane two-way flyover is being built under the Strategic Road Development Plan (SRDP) at a cost of Rs 387 crore.

The Hyderabad Metropolitan Development Authority (HMDA) project will ease traffic from the Kukatpally Y Junction towards the Medchal Highway and the Rajiv Rahadari. Traffic will also be decongested at the busy Balanagar Junction.


Another feature that makes the Balanagar flyover different from most other flyovers is a 6mm thick Asphaltic sheet spread between the bitumen layer and slab of the flyover. Similar sheets were laid for the Attapur flyover and after it yielded good results, it was replicated for the Balanagar flyover as well. The sheet absorbs water and protects the concrete and steel of the flyover.

According to HMDA officials, several hurdles were cleared by the Municipal Administration & Urban Development (MAUD) Department while the project was underway. “The works have been taken up as per the directions of MAUD Minister KT Rama Rao, who took personal interest and made sure there were no hurdles pertaining to land acquisition and utility shifting. MAUD principal secretary Arvind Kumar also inspected the site several times to make sure the flyover is completed at the earliest,” said AM Yousuf Hussain, superintendent engineer, HMDA.

The flyover has central medians too and greenery will be developed by the Telangana Forest Department. The flyover will also be illuminated on either side and officials are planning to develop a rain garden under the flyover. Amid rains, the water will drain into the garden through the outlets built at the corners of the flyover.

 

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • Asphaltic sheet
  • Attapur flyover
  • Balanagar
  • Balanagar Flyover

Related News

  • Yadadri’s fifth unit marks milestone in Telangana’s power security

    Yadadri’s fifth unit marks milestone in Telangana’s power security

  • Youth dies after being hit by lorry during highway fight

    Youth dies after being hit by lorry during highway fight

  • Andhra Pradesh: Gold, foreign currency worth Rs 5.84 cr seized, five held

    Andhra Pradesh: Gold, foreign currency worth Rs 5.84 cr seized, five held

  • TAUK celebrates Chenetha Bathukamma in London

    TAUK celebrates Chenetha Bathukamma in London

Latest News

  • Jodhpur-Hyderabad train halted for 2 hrs in Maharashtra over youth ‘assault’; RPF denies charge

    3 minutes ago
  • PM Modi, Polish PM Donald Tusk hold talks at Hyderabad House

    25 minutes ago
  • Sonia Gandhi makes Instagram debut, shares first look of her memoir ‘Belonging’

    31 minutes ago
  • Sheetal-Toman win India’s first archery gold at Asian Para Games; Swati scripts history with W1 medal

    43 minutes ago
  • Karan Johar opens up about his love life, reveals whether marriage is on the cards

    52 minutes ago
  • One killed, over 100 injured in Devaragattu Dussehra stick fight in Kurnool

    55 minutes ago
  • Economists maintain back-to-back repo rate hike stance

    60 minutes ago
  • Jio Platforms IPO retail quota fully subscribed within hours on Day 2

    1 hour ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App