Friday, Jun 19, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Hyderabad | Hyderabad Roads Witness Vast Change In 7 Years

Hyderabad roads witness vast change in 7 years

With at least a dozen flyovers in different parts of the city, link roads, restored main roads, scores of lung spaces and rejuvenated monuments, the city has been buzzing with nonstop activity

By Telangana Today
Updated On - 2 June 2021, 12:44 AM
Hyderabad roads witness vast change in 7 years
whatsapp facebook twitter telegram

Hyderabad: They say it is the journey that matters and not the destination. And if that is the case, the roads too matter. In Hyderabad, for the last seven years, the journeys have been an entirely different experience.

True, there have been a few bumps here and there, but on the whole, the city’s roads have undergone a vast change, with the Greater Hyderabad Municipal Corporation (GHMC) helming the transformational journey. With at least a dozen flyovers in different parts of the city, link roads, restored main roads, scores of lung spaces and rejuvenated monuments, the city has been buzzing with nonstop activity.


Among the many initiatives that transformed Hyderabad, the Strategic Road Development Plan (SRDP) can be considered a prominent one. A series of flyovers, underpasses, Rail over Bridges (ROBs), Rail under Bridges (RUBs) were built under the programme. Even as infrastructure was being developed to decongest the city, main roads were restored simultaneously under the Comprehensive Road Maintenance Programme (CRMP). To further reduce traffic density on main roads, new link roads were developed.

And last year, with an eye on tackling the emerging threat of urban flooding, an exclusive wing to resolve the inundation of low-lying areas and the waterlogging on roads was set up by Municipal Administration and Urban Development Minister KT Rama Rao.

On the other hand, while the city was undergoing a major infrastructural metamorphosis, GHMC records reveal that Hyderabad did not turn into a concrete jungle. Dozens of theme parks including a one-of-its-kind dog park was developed, while many open lands that were once dumping grounds were converted into lung spaces. Retaining biodiversity was always on the priority list as the city progressed. As part of the exercise, an assets protection cell too was set up to save water bodies and lung spaces.

Flyover works on fast track

With vehicular movement on the city roads reduced due to the lockdown imposed to contain the second wave of Covid-19 pandemic, Greater Hyderabad Municipal Corporation (GHMC) paced up Strategic Road Development Plan (SRDP) works.

On Monday, MAUD Principal Secretary Arvind Kumar inspected three flyovers and a railway over bridge (RoB) in the IT corridor being constructed under SRDP. In a tweet, he mentioned that MAUD Minister KT Rama Rao wanted the works to be paced up during the lockdown period.

“Inspected#SRDP flyover works to sort out inter-deptl issues & speed up esp during lockdown as per Min @KTRTRS observations at -7 tombs junction-filmnagar-Whisper valley -Shilpa layout – botanical garden-Kothaguda-Kondapur – ROB Khaitalapur Will take up in full swing,” tweeted Arvind Kumar.

Infrastructure development

SRDP

A whopping Rs 1,010.77 crore has already been spent to build flyovers and underpasses under the SRDP. The works include nine flyovers, four underpasses, three Road over Bridges/Road Under Bridges and the cable-stayed bridge across Durgam Cheruvu. As of date, 20 infrastructure projects are progressing at a cost of Rs 4,741.97 crore and officials of line departments are preparing a detailed project report for 12 works, the cost of which add up to Rs 12,044 crore.

Road restoration

Under the Comprehensive Road Maintenance Programme (CRMP), 341-km of main road stretches were recarpeted till date. Around Rs 400 crore was spent on CRMP works till date.

Urban flooding

The Strategic Nala Development Plan (SNDP) wing prepared detailed proposals worth Rs 858 crore to develop, strengthen and maintain the stormwater drain network in the city. Works have already commenced in parts of the city and will be executed in a phased manner.

Link Roads

A total of 137 link roads are being developed covering a total distance of 126.2 km. Works on about 44.7 km with an estimated cost of Rs 313.65


Now you can get handpicked stories from Telangana Today on Telegram everyday. Click the link to subscribe.

Click to follow Telangana Today Facebook page and Twitter .


  • Follow Us :
  • Tags
  • Comprehensive Road Maintenance Programme
  • CRMP
  • fast track
  • GHMC

Related News

  • Hyderabad schools told to make student safety top priority

    Hyderabad schools told to make student safety top priority

  • Special Intensive Revision set to redraw Hyderabad’s political map

    Special Intensive Revision set to redraw Hyderabad’s political map

  • GHMC launches 12-day monsoon sanitation drive across Hyderabad

    GHMC launches 12-day monsoon sanitation drive across Hyderabad

  • BRS objects to proposed Secunderabad Cantonment merger with Malkajgiri Municipal Corporation

    BRS objects to proposed Secunderabad Cantonment merger with Malkajgiri Municipal Corporation

Latest News

  • Raghav Juyal’s first look as Vikram Maalik unveiled from The Paradise

    15 mins ago
  • Women’s T20 WC: Batting the strong pursuit of Indian team, power-play bowling not a strength, says Mithali

    19 mins ago
  • ICC Chairman Jay Shah meets Sri Lankan President Dissanayake to discuss grassroots cricket and board autonomy

    28 mins ago
  • Mumbai Dreamers beat Delhi Redz to go top of Rugby Premier League

    28 mins ago
  • Telangana Junior Basketball League launched in Hyderabad

    34 mins ago
  • Valluvarnagar enter Bolarum Challenge Cup football final

    38 mins ago
  • Pawan Kalyan lays foundation stone for Common Facility Centre for forest research, conservation

    41 mins ago
  • Hyderabad Traffic Police to conduct one-way traffic trial around KBR Park

    41 mins ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam