Monday, May 11, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Hyderabad | Hyderabads Orr To Kondapur Shilpa Layout Phase 2 Flyover To Open Soon

Hyderabad’s ORR to Kondapur (Shilpa Layout Phase 2) flyover to open soon

It will be available with six lanes - 1.2 km long and 24 meters wide – and is a third-level structure built on two existing flyovers

By Telangana Today
Published Date - 27 May 2025, 08:07 PM
Hyderabad’s ORR to Kondapur (Shilpa Layout Phase 2) flyover to open soon
whatsapp facebook twitter telegram

Hyderabad: The state-of-the-art Outer Ring Road to Kondapur flyover – Shilpa Layout Phase 2 – promising to ease the traffic woes of commuters in the IT Corridor is getting ready and is planned to be inaugurated in the first week of June.

This flyover has been constructed under the Strategic Road Development Programme (SRDP) at a cost of Rs. 178 crore. It will be available with six lanes – 1.2 km long and 24 meters wide – and is a third-level structure built on two existing flyovers. Below is the Gachibowli Junction flyover, above which is the Shilpa Layout Phase 1 flyover, and now the Phase 2 Flyover is built above it.


This flyover when operational will reduce the severe traffic problem at Gachibowli Junction to a large extent and will be very convenient for vehicles going from ORR to Kondapur and Hafizpet routes. It will provide better connectivity to Hitec City and Financial District. Apart from saving travel time, commuter can reach their destinations faster without getting stuck in traffic.

GHMC officials said the work of the flyover is in the final stage and arrangements were being made to complete the work by the end of this month. Out of the total 42 works undertaken through SRDP, 37 works have been completed with this flyover.

  • Follow Us :
  • Tags
  • Hyderabad’s IT corridor
  • ORR (outer ring road)
  • SRDP Shilpa Layout Phase II flyover
  • Strategic Road Development Programme (SRDP).

Related News

  • Century-old Bowenpally Post Office to be razed for elevated corridor in Secunderabad Cantonment

    Century-old Bowenpally Post Office to be razed for elevated corridor in Secunderabad Cantonment

  • Hyderabad: Govt relaxes norms, allows more green autos to ply inside ORR

    Hyderabad: Govt relaxes norms, allows more green autos to ply inside ORR

  • Finding PGs, hostels in and around Hyderabad’s IT corridor proves daunting

    Finding PGs, hostels in and around Hyderabad’s IT corridor proves daunting

  • Greece-inspired luxury, Bridge Epsilon Villas arrives at Hyderabad’s Tukkuguda

    Greece-inspired luxury, Bridge Epsilon Villas arrives at Hyderabad’s Tukkuguda

Latest News

  • Future of youth auctioned: Rahul Gandhi’s sharp attack on Modi govt over NEET

    2 hours ago
  • TCA appeal to HCA top official seeking restraint

    3 hours ago
  • Term Insurance vs Whole Life Insurance: Which One Should You Pick

    3 hours ago
  • ZKTOR Signals India’s Bid to Shape South Asia’s Next Digital Order

    3 hours ago
  • GHMC reports 1.27 lakh online self-enumeration entries

    3 hours ago
  • West Bengal CEO Manoj Agarwal named Chief Secretary under BJP rule

    3 hours ago
  • Q1 fuel losses may wipe out entire FY earnings of State oil firms

    3 hours ago
  • Sanshray Kumar emerges champion

    3 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam