Friday, Nov 20, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Indian Army Sets Up Solar Power Plant In North Sikkim Border Village

Indian Army sets up solar power plant in North Sikkim border village

The Indian Army’s Trishakti Corps installed a 10-KW solar power plant in Muguthang village, North Sikkim, providing year-round electricity to 32 residents. The project under the Vibrant Villages Programme enhances safety, connectivity, and prevents seasonal migration

By PTI
Published Date - 5 January 2026, 01:29 PM
Indian Army sets up solar power plant in North Sikkim border village
whatsapp facebook twitter telegram

Gangtok: Indian Army’s Trishakti Corps has installed a 10-KW solar power plant at Muguthang village, located at an altitude of around 15,000 feet near the India-China border in North Sikkim, an official statement said on Monday.

The initiative aligns with the Centre’s Vibrant Villages Programme and aims to improve the quality of life in remote border areas by ensuring a reliable and sustainable power supply, it said.


According to the press release, the plant has provided electricity to all households in the village, enabling year-round habitation, improving night-time safety, enhancing connectivity and eliminating the need for seasonal migration during the harsh winter months.

Muguthang is a sparsely populated border village with 32 residents from 10 families.

Earlier, due to the absence of a dependable power supply, villagers relied on small personal solar panels and were compelled to migrate for nearly five to six months each year, leaving behind homes and livestock.

Recognising this hardship, Trishakti Corps of the Indian Army engaged closely with the local community and implemented a sustainable energy solution to ensure basic electrification. The project has significantly improved living conditions and overall community well-being, the statement added.

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags

Related News

Latest News

  • Telangana SSC public exams likely to begin on March 17 or 18

    2 minutes ago
  • Hyderabad: Ranigunj underpass renovation to trigger traffic congestion for months

    28 minutes ago
  • BRS stages protest against proposed diversion of Koilsagar water to Kodangal

    47 minutes ago
  • Farmers’ families await insurance cover after Rythu Bheema expires

    57 minutes ago
  • HYPEX-2026 showcases rare Nizam-era coins and global currencies

    1 hour ago
  • Women farmers may lose out under new Indiramma insurance scheme

    2 hours ago
  • Punjab-origin man Garry Rehal, girlfriend shot dead in targeted attack in Canada’s Surrey

    2 hours ago
  • MRI or ultrasound: Which is greener and easier on the pocket?

    2 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App