Thursday, May 7, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Indias First Underwater Metro Tunnel In Kolkata To Be Made Functional By 2023

India’s first underwater metro tunnel in Kolkata to be made functional by 2023 

Kolkata: The construction of India’s first underwater tunnel in Kolkata under the Hooghly river for establishing metro connectivity between Howrah and Kolkata is underway and will be made fully functional by 2023. Of the 16.6-km-long east-west stretch, 520 metres will be under the river bed. The tunnel corridor is built 33 meters below the riverbed […]

By ANI
Published Date - 7 April 2022, 10:00 AM
India’s first underwater metro tunnel in Kolkata to be made functional by 2023 
whatsapp facebook twitter telegram

Kolkata: The construction of India’s first underwater tunnel in Kolkata under the Hooghly river for establishing metro connectivity between Howrah and Kolkata is underway and will be made fully functional by 2023.

Of the 16.6-km-long east-west stretch, 520 metres will be under the river bed. The tunnel corridor is built 33 meters below the riverbed and will connect Kolkata to Howrah.


The Kolkata East-West Metro line is being constructed by Kolkata Metro Rail Corporation (KMRCL) and is the underwater tunnel that will go beneath the Hooghly river.

Speaking on the facilities and safety measures being provided in the project, Mithun Ghosh, the Site Supervisor while speaking to ANI said that there will be walkways in the tunnels for evacuation of passengers in case of emergency.

“Important Passage work has also been done keeping in mind that if a technical problem arises inside the water tunnel area, passengers can be taken out through the special passage,” said Mithun.

He further said that almost 80 per cent of the work of the East-west Howrah Metro station is completed and expected that the full-fledged service may start from 2023.

“The station is being built under the Hooghly river at a depth of 33 meters. 80 per cent of work has been completed while 20 per cent is yet to be finished. It will start functioning by 2023,” Ghosh added.

  • Follow Us :
  • Tags
  • Kolkata

Related News

  • Delhi tops metro cities in murders linked to love affairs: NCRB

    Delhi tops metro cities in murders linked to love affairs: NCRB

  • Feel that turnout may go up to 90 pc today: Mithun Chakraborty

    Feel that turnout may go up to 90 pc today: Mithun Chakraborty

  • Hyderabad police bust tea adulteration racket, 10 held

    Hyderabad police bust tea adulteration racket, 10 held

  • Elephant in ‘queue’ outside Bengal’s Jhargram voting booth causes brief alarm

    Elephant in ‘queue’ outside Bengal’s Jhargram voting booth causes brief alarm

Latest News

  • To Lam calls for India-Vietnam co-creation in global supply chains

    2 mins ago
  • Telangana Headmasters support merger of TGBIE and School Education department

    4 mins ago
  • GHMC installs compost pits at Indira park in Hyderabad

    13 mins ago
  • Modi congratulates new Bihar ministers after Cabinet expansion

    15 mins ago
  • Telangana PCB announces State Best Environmental Performance Awards

    15 mins ago
  • Dasoju Sravan alleges corruption in Telangana education sector

    20 mins ago
  • Mild tension over plaque dispute during Saroornagar Community Hall inauguration

    21 mins ago
  • WhatsApp launches Business AI feature in India

    26 mins ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam