Friday, Jun 19, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Isro Achieves Breakthrough In Semicryogenic Engine Development For Lvm3

ISRO achieves breakthrough in Semicryogenic engine development for LVM3

The first major breakthrough in the semicryogenic engine development programme was achieved on March 28, when the first successful hot test of Engine Power Head Test Article (PHTA), was carried out at ISRO Propulsion Complex, Mahendragiri

By PTI
Published Date - 29 March 2025, 10:34 AM
ISRO achieves breakthrough in Semicryogenic engine development for LVM3
whatsapp facebook twitter telegram

Bengaluru: ISRO has announced significant progress in the design and development of a Semicryogenic engine or Liquid Oxygen/Kerosene engine with a high thrust of 2,000 kN (kilonewton) that will power the Semicryogenic booster stage of the Launch Vehicle Mark-3 (LVM3).

The first major breakthrough in the semicryogenic engine development programme was achieved on March 28, when the first successful hot test of Engine Power Head Test Article (PHTA), was carried out at ISRO Propulsion Complex, Mahendragiri, Tamil Nadu, it said.


Highlighting that the Friday’s test demonstrated the smooth ignition and boost strap mode operation of the engine for a test duration of 2.5 seconds, the space agency said the objective of the test was to validate the integrated performance of the critical subsystems such as the pre-burner, turbo pumps, start system and control components by carrying out a hot-firing for a short-duration of 2.5 seconds.

“The test proceeded as predicted and all the engine parameters were as expected. With this breakthrough, ISRO is further planning a series of tests on the PHTA to further validate and finetune the performance before the realization of the fully integrated engine,” it said.

Noting that the Liquid Propulsion Systems Centre (LPSC) of ISRO is developing the Semi cryogenic propulsion Engine and Stage, ISRO said the stage (SC120) powered by the 2,000kN semi-cryogenic engine (SE2000) will replace the present core liquid stage (L110) of LVM3 for payload enhancement and power the booster stages of future launch vehicles.

Non toxic and non hazardous propellants (Liquid Oxygen and Kerosene) are employed in Semi cryogenic propulsion and this will deliver higher performance compared to existing L110 stage.

Induction of the Semi cryogenic propulsion system along with an uprated cryogenic stage in the LVM3 vehicle enhances its payload capability from 4 tonne to 5 tonne in Geosynchronous Transfer Orbit (GTO), it added.

According to ISRO, major subsystems of the SE-2000 engine include thrust chamber, pre-burner, turbo pump system, control components and start up system.

“…the complex engine hardware uses special materials to withstand the high temperature and oxidiser rich combustion. The hardware along with the space grade kerosene are realised in partnership with Indian industry. The development of this engine in these high thrust levels is highly challenging and this technology is available with only very few nations.” The realization of a test facility to qualify the engine and stage is equally complex and challenging, ISRO said.

The complex Semicryogenic Integrated Engine Test facility (SIET) was established at its Propulsion Research Complex (IPRC), Mahendragiri for testing the engine and stage and was dedicated to the nation by Prime Minister Narendra Modi on February 27 last year.

Prior to the conduct of integrated engine level hot tests, it is planned to carry out performance evaluation tests of the intermediate configuration, designated as Power Head Test Article (PHTA), which comprises all the engine systems except the thrust chamber, it said.

  • Follow Us :
  • Tags
  • ISRO
  • Launch Vehicle Mark
  • Power Head Test Article

Related News

  • Beyond Chandrayaan-3: ISRO developing long-life moon landers

    Beyond Chandrayaan-3: ISRO developing long-life moon landers

  • Raring to return to space: Astronaut Shubhanshu Shukla prepares for Gaganyaan mission

    Raring to return to space: Astronaut Shubhanshu Shukla prepares for Gaganyaan mission

  • ICEYE to set up first satellite manufacturing plant in India

    ICEYE to set up first satellite manufacturing plant in India

  • G20 satellite expected to be launched in 2027: ISRO chief Narayanan

    G20 satellite expected to be launched in 2027: ISRO chief Narayanan

Latest News

  • RBI compounds FEMA violations of Sai Rayalaseema Paper Mills

    5 hours ago
  • YSRCP chief Jagan seeks CBI inquiry into Vijayawada custodial death

    5 hours ago
  • Verdict on Telegram app suspension plea set for June 19

    6 hours ago
  • India, France to launch TRISHNA satellite for global food security

    6 hours ago
  • Bank of Baroda offers up to 6.25% interest to NRIs under new FCNR(B) scheme

    6 hours ago
  • Daily wager found dead in Siddipet lake after fishing trip

    6 hours ago
  • BSH unveils premium four-door side-by-side refrigerators in Hyderabad

    6 hours ago
  • Bisleri workers seek Labour Minister Vivek’s intervention over job dismissals in Sangareddy

    6 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam