Friday, May 29, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Isros Eos 09 Launch Fails Due To 3rd Stage Anomaly

ISRO’s EOS-09 launch fails due to 3rd-stage anomaly

The malfunction led to the mission failure, and the satellite could not be successfully deployed.

By IANS
Published Date - 18 May 2025, 09:12 AM
ISRO’s EOS-09 launch fails due to 3rd-stage anomaly
whatsapp facebook twitter telegram

Andhra Pradesh: The Indian Space Research Organisation (ISRO) on Sunday suffered a setback as its 101st mission, PSLV-C61 carrying the EOS-09 satellite, faced a technical malfunction in the launch vehicle.

The malfunction led to the mission failure, and the satellite could not be successfully deployed.


The indigenous PSLV, or Polar Satellite Launch Vehicle — PSLV-C61 — lifted off from the Satish Dhawan Space Centre in Sriharikota with the aim of placing EOS-09 into a Sun Synchronous Polar Orbit (SSPO).

While the first and second stages of the launch vehicle performed normally, ISRO Chairman Dr V. Narayanan said that an unexpected issue arose during the third stage, preventing the successful deployment of the satellite.

The ISRO Chief said, “Today, we attempted the 101st launch from Sriharikota, the PSLV-C61 carrying the EOS-09 mission. The PSLV is a four-stage launch vehicle, and its performance was normal up to the second stage. The third stage motor ignited perfectly; however, during its operation, an anomaly was observed, and the mission could not be completed successfully…”

“We will come back after analysis,” he further said.

ISRO also posted an update on X, stating: “Today 101st launch was attempted, PSLV-C61 performance was normal till 2nd stage. Due to an observation in 3rd stage, the mission could not be accomplished.”

The third stage of the PSLV is a solid rocket motor designed to provide high thrust during the upper atmosphere phase of the flight, delivering a maximum thrust of 240 kilonewtons. It plays a crucial role in placing the satellite into its intended orbit.

The EOS-09 was designed to provide continuous and reliable remote sensing data for operational applications across various sectors, ranging from border surveillance and national security to agriculture, forestry, flood monitoring, and disaster management. For the mission, PSLV carried a 1,710 kg satellite into a sun-synchronous orbit to ensure consistent lighting for Earth observation.

The mission was also meant to promote sustainability and carry out responsible space operations. EOS-09 was a repeat satellite similar to EOS-04, launched in 2022, that was designed with the mission objective to ensure remote sensing data for the user community engaged in operational applications and to improve the frequency of observation.

  • Follow Us :
  • Tags
  • Andhra Pradesh
  • AP
  • EOS-09 satellite
  • India

Related News

  • WEF delegation meets Naidu, discusses C4IR roadmap

    WEF delegation meets Naidu, discusses C4IR roadmap

  • Naidu pushes population management policy amid falling fertility rates in AP

    Naidu pushes population management policy amid falling fertility rates in AP

  • Pawan Kalyan orders strict action as Godavari river pollution reaches alarming levels

    Pawan Kalyan orders strict action as Godavari river pollution reaches alarming levels

  • Netanyahu calls India a ‘huge power’, praises ‘crazy love’ for Israel

    Netanyahu calls India a ‘huge power’, praises ‘crazy love’ for Israel

Latest News

  • Attack on ED officials serious offence, says Satheesan

    23 seconds ago
  • Hydraa hires transgenders to protect lakes, parks and government land

    3 mins ago
  • Cyberabad Police plans tech-driven student mobility system for schools

    7 mins ago
  • SC extends deadline for in-service teachers to clear TET till 2028

    10 mins ago
  • HMWSSB prepares emergency pumping at Singur to meet Hyderabad water demand

    11 mins ago
  • Telangana releases Rs 2,000 crore towards pending employee dues

    11 mins ago
  • Telangana Farmers’ Commission chief sparks row over power remarks

    16 mins ago
  • Telangana likely to procure 75 LMT paddy this Yasangi: Uttam

    18 mins ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam