Friday, May 1, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Mumbais First Underground Metro Corridor From Bkc To Aarey Opens

Mumbai’s first underground Metro corridor from BKC to Aarey opens

A large number of people came to experience the ride on the first day of the BKC to Aarey stretch of Mumbai Metro Line 3

By PTI
Published Date - 7 October 2024, 12:33 PM
Mumbai’s first underground Metro corridor from BKC to Aarey opens
The minimum fare for a ride on the Metro line is Rs 10 and maximum Rs 50, as per the Mumbai Metro Rail Corporation
whatsapp facebook twitter telegram

Mumbai: Mumbai’s first underground Metro corridor, the aqua line’s phase-1, stretching from Bandra-Kurla Complex (BKC) to Aarey became operational for the public on Monday morning.

A large number of people came to experience the ride on the first day of the BKC to Aarey stretch of Mumbai Metro Line 3. The Metro operation on the stretch commenced for the public at 11 am, amid cheers from passengers.


Prime Minister Narendra Modi on Saturday inaugurated the 12.69 km long phase-1 of the BKC to Aarey stretch of Mumbai Metro Line 3.

He travelled from BKC to Santacruz and back during which he interacted with students, beneficiaries of the Maharashtra government’s Ladki Bahin scheme and labourers involved in constructing the underground line.

The Mumbai Metro Rail Corporation (MMRC), which is executing the 33.5-km-long Colaba-SEEPZ-Aarey JVLR project, has already notified that the regular operation of the Metro on the aqua line will commence from Tuesday.

As per the notification, services will be operated from 6.30 am to 10.30 pm between Monday and Saturday, and from 8.30 am to 10.30 pm on Sundays.

The minimum fare for a ride on the Metro line is Rs 10 and maximum Rs 50, as per the MMRC. Passengers can book tickets using the NCMC (National Common Mobility Card), Mumbai Metro 3 mobile app, and ticket vending machines, among other means.

The corridor between BKC and Aarey road has 10 Metro stations – BKC, Bandra Colony, Santacruz metro, Chhatrapati Shivaji Maharaj International Airport (CSMIA) T1, Sahar Road, CSMIA T 2, Marol Naka, Andheri, SEEPZ, Aarey Colony JVLR. Of these, only Aarey JVLR station is at a grade while all others are underground.

The aqua line is the fourth Metro corridor of Mumbai. The Ghatkopar-Andheri-Versova Metro Line-1, Andheri West-Dahisar Line-2A and Andheri East-Dahisar Line-7 are already operational in the city.

  • Follow Us :
  • Tags
  • aqua line's phase-1
  • Bandra Kurla Complex
  • BKC to Aarey
  • BKC to Aarey stretch

Related News

  • BRS demands rollback of LPG price hike, slams Centre

    BRS demands rollback of LPG price hike, slams Centre

  • Gujarat shows pro-incumbency amid anti-incumbency trend: Modi writes to CM Patel

    Gujarat shows pro-incumbency amid anti-incumbency trend: Modi writes to CM Patel

  • ACP-rank officer arrested by Mumbai Police for ‘molesting’ minor

    ACP-rank officer arrested by Mumbai Police for ‘molesting’ minor

  • Paneer or substitute? Maharashtra govt makes disclosure mandatory for restaurants, eateries

    Paneer or substitute? Maharashtra govt makes disclosure mandatory for restaurants, eateries

Latest News

  • Symposium Hyderabad discusses future of sports ecosystem in India

    2 mins ago
  • Ian Bishop praises Vaibhav Suryavanshi’s fearless batting approach

    12 mins ago
  • Australia retain top spot in ICC Test and Women’s ODI rankings

    17 mins ago
  • Five-time champions face off against each other

    17 mins ago
  • SkyKings FC crush Bolarum Sporting FC 9-1 in TFA C-Division league

    25 mins ago
  • Stalin demands immediate rollback of LPG price hike

    26 mins ago
  • Suvendu accuses Mamata of ‘dramabazi’ at counting centre, says move will not change verdict

    30 mins ago
  • 2762 students to appear for NEET-UG exam in Khammam

    31 mins ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

.