Friday, Aug 21, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Business | Ntpc Adds 660 Mw Unit 2 Of Tanda Power Project To Its Installed Capacity

NTPC adds 660 MW Unit-2 of Tanda power project to its installed capacity

In October 2019, Unit 1 of 660 MW of stage-II of Tanda Super Thermal Power Station (2x660 MW) was added to the company's installed capacity.

By PTI
Published Date - 5 April 2021, 03:31 PM
NTPC adds 660 MW Unit-2 of Tanda power project to its installed capacity
whatsapp facebook twitter telegram

New Delhi: State-owned power giant NTPC Ltd on Monday said it has added 660 MW Unit-2 of Tanda Super Thermal Power Station in Uttar Pradesh to its installed capacity.

“Unit-2 of 660 MW capacity of Tanda Super Thermal Power Station, Stage-II (2 x 660 MW) has successfully completed the trial operation and consequently included in the installed capacity of NTPC Group from March 31, 2021,” a BSE filing said.


With this, the total installed capacity of NTPC and NTPC group has become 52,385 MW and 65,810 MW, respectively, it added.

In October 2019, Unit 1 of 660 MW of stage-II of Tanda Super Thermal Power Station (2×660 MW) was added to the company’s installed capacity.

The present installed capacity of NTPC Group is 65,810 MW (including 11,755 MW through JVs/subsidiaries) comprising 46 NTPC stations (23 coal-based stations, 7 gas-based stations, 1 hydro station, 1 small hydro, 13 solar PV, and 1 wind-based station) and 25 joint venture stations (9 coal-based, 4 gas-based, 8 hydro, 1 small hydro, 2 wind and 1 solar PV).


Now you can get handpicked stories from Telangana Today on Telegram everyday. Click the link to subscribe.

Click to follow Telangana Today Facebook page and Twitter .

  • Follow Us :
  • Tags
  • 660 MW Unit-2
  • installed capacity
  • National Thermal Power Corporation (NTPC)
  • Tanda Super Thermal Power Station

Related News

  • 6-year-old boy killed by leopard in UP

    6-year-old boy killed by leopard in UP

  • ‘Vindictive politics’: SP hits out at BJP over ED raids on Azam Khan-linked locations

    ‘Vindictive politics’: SP hits out at BJP over ED raids on Azam Khan-linked locations

  • Eight UP labourers killed, 32 injured as pickup collides with dumper in MP

    Eight UP labourers killed, 32 injured as pickup collides with dumper in MP

  • Nitin Nabin appoints BJP in-charges for poll-bound UP, Punjab, Gujarat

    Nitin Nabin appoints BJP in-charges for poll-bound UP, Punjab, Gujarat

Latest News

  • NTA defends Rs 200 answer key challenge fee, says it benefits all candidates

    6 hours ago
  • Magnitude 6.7 earthquake strikes southern Peru; no damage reported

    6 hours ago
  • Iran accuses US of ‘economic war’ as Trump threatens tougher sanctions

    6 hours ago
  • Opinion: Section 22-A and Right to Property

    7 hours ago
  • Houthis claim drone attacks on Saudi airport, Aramco facility

    7 hours ago
  • Editorial: Trump’s tariff tantrums fail to dent India’s exports

    8 hours ago
  • India U-20 held to 0-0 draw by Yemen in friendly

    8 hours ago
  • East Bengal women smash 12-0 record win in AFC Women’s Champions League

    8 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam