Sunday, Apr 26, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Pm Modi To Launch Works On Rs 6300 Cr Goregaon Mulund Link Road

PM Modi to launch works on Rs 6,300 crore Goregaon Mulund Link Road

It will slash the peak hour commute from the current 85-90 minutes to barely 20-25 minutes

By IANS
Updated On - 13 July 2024, 11:07 AM
PM Modi to launch works on Rs 6,300 crore Goregaon Mulund Link Road
Comprising a twin-tunnel passing under the Sanjay Gandhi National Park, the GMLR would provide a fourth critical link between the north-eastern and north-western suburbs of Mumbai
whatsapp facebook twitter telegram

Mumbai: Exactly a year after it was announced in July 2023, Prime Minister Narendra Modi will launch work on the Brihanmumbai Municipal Corporation (BMC)’s planned partly-underground Rs 6,300 crore Goregaon Mulund Link Road (GMLR), here on Saturday evening.

The GMLR will directly link the Western Express Highway at Goregaon with the Eastern Express Highway at Goregaon and slash the peak hour commute from the current 85-90 minutes to barely 20-25 minutes, officials said.


Comprising a twin-tunnel passing under the Sanjay Gandhi National Park, the GMLR would provide a fourth critical link between the north-eastern and north-western suburbs of Mumbai, giving another major infrastructure project to the city. Incidentally, this will be the second tunnel coming inside the SGNP, – the other being the proposed twin-tube tunnel for the Borivali-Thane link road – which will also be shown the green signal by the Prime Minister on Saturday.

As far as the current status of the GMLR link is concerned, stretches of roads of varying width are presently operational on both sides — from the Eastern Express Highway to the Khindipada Junction and from the Western Express Highway to the Film City. However, the stretch between Film City and Khindipada Junction was identified as the “missing link” which the BMC will now connect through the twin-tunnel running under the SGNP hills at depths of 25-160 metres.

The total length of the six-lane GMLR shall be around 13.25 km, and it will be 45.7 metres wide, with the 4.70 km-long twin-tunnel portion to be dug through TBMs. This will be done to avoid disturbing the eco-sensitive region, where the Tulsi and Vihar lakes supplying drinking water to the city are located, besides being home to the rich wildlife inside SGNP, including leopards.

An important feature will be two water mainlines of 1,800-mm diameter in each tunnel to carry drinking water from the Bhandup Complex to the western suburbs, plus mechanical ventilation, advanced fire-fighting and fire-resistance systems, CCTV, two control rooms on each side and special green corridors for safe passage of wild animals near the Film City area.

  • Follow Us :
  • Tags
  • BMC
  • Express Highway
  • GMLR
  • missing link

Related News

  • Entire Union cabinet, 19 CMs won’t help BJP win Bengal polls: Mamata

    Entire Union cabinet, 19 CMs won’t help BJP win Bengal polls: Mamata

  • Mamata helping rich, not poor in Bengal, Modi doing same across country: Rahul

    Mamata helping rich, not poor in Bengal, Modi doing same across country: Rahul

  • NITI Aayog emerges as vital pillar in India’s policy-making architecture: PM Modi

    NITI Aayog emerges as vital pillar in India’s policy-making architecture: PM Modi

  • Hyderabad Runners Society honoured for top participation at Mumbai Marathon

    Hyderabad Runners Society honoured for top participation at Mumbai Marathon

Latest News

  • White House event shooting scare sees Donald Trump escorted off stage

    27 mins ago
  • Gunshots at White House Correspondents’ Dinner trigger panic, Trump evacuated

    42 mins ago
  • BWF to roll out 3×15 scoring format from January 2027

    8 hours ago
  • Pakistan’s Karachi reports first Congo virus death of 2026

    8 hours ago
  • Kudankulam nuclear plant’s unit 3 enters reactor spillage phase

    9 hours ago
  • Pakistan launches EO-3 satellite, boosting remote sensing capabilities

    9 hours ago
  • Mamata says BJP’s use of Union cabinet, 19 CMs won’t tilt Bengal polls

    9 hours ago
  • BJP’s Bahraich MLA Anupama Jaiswal sustains minor burns while igniting effigy during protest

    9 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

.