Tuesday, Nov 10, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Hyderabad | Redevelopment Of Malakpet Railway Station Gains Pace To Be Completed By 2025

Redevelopment of Malakpet railway station gains pace, to be completed by 2025

The Malakpet railway station redevelopment project, part of the Amrit Bharat Station Scheme, has reached 70% progress. With modern facilities, metro integration, and eco-friendly design, the Rs 36.44 crore project is set to be completed by 2025, benefiting Old City passengers.

By C. Romeo
Updated On - 16 August 2025, 04:31 PM
Redevelopment of Malakpet railway station gains pace, to be completed by 2025
whatsapp facebook twitter telegram

Hyderabad: The redevelopment works on the Malakpet railway station have picked pace with the railway authorities planning to make it ready and usable by the end of 2025.

The works are being taken up at an estimated cost of Rs.36.44 crore as a part of the ‘Naya Bharat Naya Station’ initiative of Amrit Bharat Station Scheme (ABSS) of Railway Ministry.


Until now, about 70 per cent of the development work has been completed. The facilities for train travellers planned at the redeveloped Malakpet railway station include removing unwanted structures, improved lighting, better-circulating area, upgraded parking space, Divyangjan-friendly infrastructure, environment-friendly building using green energy, etc.

The railway station is being developed with modern architecture and world-class facilities and will serve as the city centre with a focus on long-term planning.

Malakpet Railway Station

The station, which is strategically located in the old city, falls on the Kacheguda–Falaknuma suburban route and serves passengers in and around Malakpet, Dilsukhnagar, Vanasthalipuram.

This station also has stoppages for important express trains such as the Kacheguda–Kurnool Tungabhadra Express and the Kacheguda-Guntur Express. And once the development is completed, more trains are expected to halt here, benefiting people who can board trains from this station.

South Central Railway (SCR) authorities said the redevelopment includes a new façade, development of the station building at the second entry, circulating area development, a 12-metre foot-over-bridge (FOB) for future use, a roof plaza, integration with Metro connectivity, passenger lifts and escalators, improvements to platform surfaces, interior renovations of the concourse, waiting halls and VIP lounge, provision of toilets for Divyangjan, new signage, and new furniture, among others.

Work being carried out at Malakpet railway station

• Improvement of station building façade

• Provision of entrance portico

• Construction of FoB, lifts and escalators

• VIP Waiting Hall

Metro connectivity

• Roof Plaza.

• Provision of passenger friendly signages, train indication boards.

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • Amrit Bharat Station Scheme
  • Hyderabad
  • Malakpet railway station
  • Naya Bharat Naya Station

Related News

  • Winter chill sets in as crisp mornings grip Hyderabad and Telangana

    Winter chill sets in as crisp mornings grip Hyderabad and Telangana

  • Hyderabad: Woman killed as auto rams into parked lorry in Hayathnagar

    Hyderabad: Woman killed as auto rams into parked lorry in Hayathnagar

  • Traffic curbs announced for Sadar Utsav Mela in Hyderabad

    Traffic curbs announced for Sadar Utsav Mela in Hyderabad

  • Hydraa receives 36 complaints over illegal borewells

    Hydraa receives 36 complaints over illegal borewells

Latest News

  • Anthropic unveils two new Claude 5.2 models for advanced coding, cybersecurity

    3 minutes ago
  • Trump says FBI looking into Nvidia CEO Jensen Huang’s affair with ‘Chinese agent’

    20 minutes ago
  • Girl students allege harassment by sanitary worker at Nidamanoor Gurukulam

    20 minutes ago
  • Charlapalli-Tiruchanur Express becomes superfast

    29 minutes ago
  •  Trump after meeting Qatar PM says he believes war with Iran is ‘effectively over’

    45 minutes ago
  • TGCSB books man for uploading child sexual abuse material online

    1 hour ago
  • NCW receives 1.5 lakh complaints annually, domestic violence tops list: Vijaya Rahatkar

    1 hour ago
  • Russia’s top independent newspaper closes its office after three decades, citing official pressure

    1 hour ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App