Sunday, Aug 30, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Rescue Teams Intensify Efforts To Reach 537 Workers Missing In Nepal Floods

Rescue teams intensify efforts to reach 537 workers missing in Nepal floods

At least 537 workers remain unaccounted for at nine hydropower projects in Nepal's flood-hit Rasuwa and Nuwakot districts. Rescue operations are being intensified, with India, China and other countries deploying specialised teams to help reach workers believed trapped inside tunnels

By PTI
Updated On - 30 August 2026, 04:18 PM
Rescue teams intensify efforts to reach 537 workers missing in Nepal floods
whatsapp facebook twitter telegram

Kathmandu: As many as 537 workers and employees remained unaccounted for at nine hydropower projects in Nepal’s flood-hit Rasuwa and Nuwakot districts, with rescue teams intensifying efforts to reach people believed trapped inside tunnels blocked by mud and debris.

Rescue operations have been hampered by mud and debris blocking tunnel entrances, damaged infrastructure, difficult terrain and adverse weather, prompting Nepal to seek specialised assistance from India, China and other countries.


According to the Independent Power Producers’ Association in Nepal (IPPAN), 898 workers and employees at nine hydropower projects in the two districts were initially reported out of contact following the August 26 floods.

Of them, 361 have been rescued, leaving 537 still unaccounted for, according to local media reports that cited IPPAN.

The most serious situation is at the 216 MW Upper Trishuli-1 Hydropower Project in Rasuwa, with 300 people still believed to be trapped inside the project’s tunnel, the media reports said.

At the 60 MW Upper Trishuli-3A Hydropower Project in Nuwakot, rescue efforts have made some progress after the tunnel entrance was buried by mud and debris.

The Nepali Army dismantled excavators and bulldozers and airlifted them by helicopter to Battar, Nuwakot, to facilitate access to the flood-hit project site, the Nepal News web portal reported.

Army officials said joint rescue teams were working around the clock and that operations were nearing a critical breakthrough at the tunnel entry point.

A separate report said rescuers had identified the crown, or upper section, of the buried tunnel and begun sending a camera and oxygen through a drilled opening to assess conditions inside.

At the 22 MW Chilime Hydropower Project, IPPAN said eight people remained out of contact, while project officials said six employees were believed to be trapped inside a tunnel.

Project CEO Baburaja Maharjan told OnlineKhabar news portal that a mountaineering rescue team flown to the site by Simrik Air on Saturday entered the tunnel but could proceed only about 100 metres before finding it completely blocked by mud.

The team said a specialised operation with appropriate equipment would be required to clear the blockage and reach those trapped, Maharjan told the news portal.

International assistance has meanwhile been deployed to support Nepal’s tunnel rescue efforts.

An 11-member Indian technical team comprising doctors, paramedics and tunnel engineers carried out on-site reconnaissance of hydropower tunnels in the flood-affected area on Saturday, the Indian Embassy in Kathmandu said.

The team had arrived in Kathmandu on Friday and reached Trishuli in Nuwakot district on Saturday.

It also conducted an aerial survey of the Chilime and Langtang areas before assessing the sites for rescue operations, according to Nepalese authorities and the Indian Embassy.

The Kathmandu Post reported that the Indian team was flown to Chilime and Langtang in coordination with the Nepali Army and Armed Police Force.

It said Nepal had also allowed Chinese and South Korean teams to assist with specialised rescue efforts.

A six-member Chinese tunnel expert team has also arrived in Nepal to assist in rescue efforts, he said.

China Railway is undertaking civil construction work at the project and the experts arrived in coordination with the company.

The Chinese team, however, has separately been deployed to assist with rescue efforts at the Upper Trishuli-3B Hydropower Project.

The Himalayan Times reported that the Chinese experts arrived in the Trishuli area by helicopter and were coordinating with a Nepali Army technical team to assess the tunnel and determine the feasibility of rescue operations.

  • Follow Us :
  • Tags
  • hydropower projects
  • Nepal
  • Nepal floods
  • Nuwakot

Related News

  • Nepal floods: 219 Tamil Nadu residents rescued, search on for 100 others

    Nepal floods: 219 Tamil Nadu residents rescued, search on for 100 others

  • More Keralites stranded in Nepal floods begin journey back to India

    More Keralites stranded in Nepal floods begin journey back to India

  • India provides 68.5 tonnes of relief, Bailey bridge, tunnel expertise to flood-hit Nepal

    India provides 68.5 tonnes of relief, Bailey bridge, tunnel expertise to flood-hit Nepal

  • Tibet flash floods: 49 Indians among 261 ‘unaccounted’ foreign nationals

    Tibet flash floods: 49 Indians among 261 ‘unaccounted’ foreign nationals

Latest News

  • Tottenham agree Iliman Ndiaye deal as Richarlison heads back to Everton

    7 seconds ago
  • AIMIM names Bahadurpura MLA Mohammed Mubeen as Rajendranagar in-charge

    3 minutes ago
  • India exports nearly 1 million barrels of petrol to Russia amid refinery crisis

    5 minutes ago
  • India rebalances US and China ties amid trade and investment shifts

    12 minutes ago
  • Rescue teams intensify efforts to reach 537 workers missing in Nepal floods

    13 minutes ago
  • PM Modi receives ceremonial welcome in Uzbekistan, holds talks with Mirziyoyev

    16 minutes ago
  • Parliamentary panel recommends dedicated insolvency benches in NCLT for faster case disposal

    16 minutes ago
  • Rajiv Rahadhari turns accident-prone as 504 killed in one year

    22 minutes ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App