Saturday, Jun 20, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Telangana | Singur Hydro Power Project Generates 14 41mu This Year

Singur hydro power project generates 14.41MU this year

Most of the power was generated during September and October

By Telangana Today
Published Date - 18 October 2024, 05:14 PM
Singur hydro power project generates 14.41MU this year
whatsapp facebook twitter telegram

Sangareddy: The Singur Hydroelectric project has generated 14.41 million units of power this year (2024-2025) beginning on April 1. Most of the power was generated during September and October.

While the TG Genco generated 7.27 MU in September, it generated 5.7 MU until October 17. The project had two 7.5 MW capacity hydropower units which were installed after the project was constructed across River Manjeera at Singur village in Pulkal mandal in 1998.


Since the hydropower units were commissioned, Genco has generated more power only four times than what it managed this year. Two years ago, Genco generated a record-breaking 30 MU in 2022-23.

Before that, the 25.68 MU generation in 2010-11 was the highest ever. The Genco could generate more than 20 MU only three times in the 26 years of the project’s history.

Since Singur was receiving constant inflows from upstream, the hydroelectric project is still operational. Officials were expecting power generation to cross 20 MU by March 30, 2025.

The power generated here is connected to 132 KV substations located at Sadasivapet and Jogipet towns. The Singur multipurpose project was receiving 3,225 cusecs of water from upstream on Friday while Genco was releasing 2,725 cusecs of water downstream river course operating both units.

Chief Engineer V Ramesh Babu said this was among the most fruitful years for Genco since the project was commissioned.

  • Follow Us :
  • Tags
  • Chief Engineer V Ramesh Babu
  • hydroelectric projects
  • hydropower units
  • power generation

Related News

  • Woman, two teenage girls drown in River Manjeera in Kamareddy district

    Woman, two teenage girls drown in River Manjeera in Kamareddy district

  • BRS backs striking power staff, accuses Congress govt of intimidation

    BRS backs striking power staff, accuses Congress govt of intimidation

  • TG GENCO warns artisans: Resume work within 24 hours or face termination

    TG GENCO warns artisans: Resume work within 24 hours or face termination

  • Watch: River Manjeera overflows at Yellapur bridge, traffic blocked

    Watch: River Manjeera overflows at Yellapur bridge, traffic blocked

Latest News

  • Dozens feared injured in London-bound train crash

    10 mins ago
  • Hyderabad police announce diversions ahead of Elephant Trial Walk procession on June 20

    45 mins ago
  • Telangana CID arrests Worldline VP in Falcon fraud case

    50 mins ago
  • Congress govt eyes revenue growth through tourism, sand exports

    1 hour ago
  • Editorial: The high cost of Bihar’s dry law

    1 hour ago
  • Jilted lover held for knife attack on woman’s family in Raidurgam

    1 hour ago
  • Raidurg land auction case: Telangana govt weighs future dealings with SBI

    1 hour ago
  • Opinion: Modern Pompeii — questions only

    1 hour ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam