Wednesday, May 20, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Telangana | Telangana Sitamma Sagar Srlip Secure Tac Approval

Telangana: Sitamma Sagar, SRLIP secure TAC approval

The integrated project seeks to utilise 67.05 TMC water from Godavari for irrigation, impacting an ayacut of 7,87,000 acres

By Telangana Today
Published Date - 24 April 2025, 11:44 PM
Telangana: Sitamma Sagar, SRLIP secure TAC approval
whatsapp facebook twitter telegram

Hyderabad: The detailed project report (DPR) for the integrated Sitamma Sagar and SRLIP project on Thursday secured clearance of the Technical Advisory Committee (TAC) of the Central Water Commission. The 158th Technical Advisory Committee meeting, chaired by Secretary of the Ministry of Jal Shakti (MoJS) Debashree Mukherjee and CWC chairman Mukesh Kumar Sinha, which had a thorough review of the integrated project, recommended its consideration.

Works on the projects were grounded in 2017 during the BRS regime. The project seeks to utilise 67.05 TMC water from Godavari for irrigation, impacting an ayacut of 7,87,000 acres, and drinking water supply via 11 pump houses with a combined capacity of 757 MW. It will benefit districts such as Bhadradri Kothagudem, Khammam and Mahabubabad. The project will be stabilizing ayacut areas under Nagarjuna Sagar Project Left Canal, the reservoirs of Wyra, Paleru, and other minor irrigation schemes in Krishna basin.


The barrage, measuring 1332.75 metres in length, features 67 radial gates with flood discharge capabilities. With a Full Reservoir Level (FRL) of 63 metres, it will have a storage capacity of 36.57 TMC. The project is set to generate 282.80 MW of hydropower. The total approved cost was put at Rs 19,955 crore as of June 2023. An amount of Rs.927 crore was dedicated to the hydropower component.

The Benefit-Cost (BC) ratio was put at 1.57, and physical progress had reached 57 percent as of January 2025, reflecting an expenditure of Rs 11,320 crore. The project is slated for completion by Rabi 2026. Representatives from Telangana, including Rahul Bojja, Principal Secretary; G Anil Kumar, Engineer-in-Chief (General); Srinivas Reddy, Superintending Engineer, Kothagudem, S Subramayam Prasad, Deputy Director (General Branch) and S Vijaykumar, SE (interstate wing) attended the meeting.

 

  • Follow Us :
  • Tags
  • Detailed Project Report
  • integrated project
  • Sitamma Sagar
  • SRLIP

Related News

  • Harish Rao says Congress is weakening Assembly, demands 15-day session

    Harish Rao says Congress is weakening Assembly, demands 15-day session

  • Revanth Reddy clarifies Salman Khan Ventures project is only expression of interest

    Revanth Reddy clarifies Salman Khan Ventures project is only expression of interest

  • Hyderabad–Chennai high-speed rail project enters crucial phase

    Hyderabad–Chennai high-speed rail project enters crucial phase

  • Uttam urges Centre to expedite nod for pending irrigation projects in Delhi meeting

    Uttam urges Centre to expedite nod for pending irrigation projects in Delhi meeting

Latest News

  • India key partner, Estonia will be ‘very happy’ if PM Modi visits: foreign minister

    3 mins ago
  • Adani Green Energy to develop 2,250 MW pumped storage project in Andhra Pradesh

    13 mins ago
  • Board of Peace will ask UNSC to press Hamas to disarm

    14 mins ago
  • Markets fall in early trade as oil prices rise, global cues weaken amid Iran tensions

    26 mins ago
  • Rupee hits fresh all-time low of 96.90 against US dollar amid strong dollar, oil surge

    49 mins ago
  • Rhea Seehorn joins ‘Running’

    1 hour ago
  • Meta  8,000 employees as it restructures for AI shift

    1 hour ago
  • UP: Woman sets house on fire to frame relatives, dies of burns; husband among 3 arrested

    1 hour ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam