Saturday, Nov 28, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Telangana | Telangana Sitamma Sagar Srlip Secure Tac Approval

Telangana: Sitamma Sagar, SRLIP secure TAC approval

The integrated project seeks to utilise 67.05 TMC water from Godavari for irrigation, impacting an ayacut of 7,87,000 acres

By Telangana Today
Published Date - 24 April 2025, 11:44 PM
Telangana: Sitamma Sagar, SRLIP secure TAC approval
whatsapp facebook twitter telegram

Hyderabad: The detailed project report (DPR) for the integrated Sitamma Sagar and SRLIP project on Thursday secured clearance of the Technical Advisory Committee (TAC) of the Central Water Commission. The 158th Technical Advisory Committee meeting, chaired by Secretary of the Ministry of Jal Shakti (MoJS) Debashree Mukherjee and CWC chairman Mukesh Kumar Sinha, which had a thorough review of the integrated project, recommended its consideration.

Works on the projects were grounded in 2017 during the BRS regime. The project seeks to utilise 67.05 TMC water from Godavari for irrigation, impacting an ayacut of 7,87,000 acres, and drinking water supply via 11 pump houses with a combined capacity of 757 MW. It will benefit districts such as Bhadradri Kothagudem, Khammam and Mahabubabad. The project will be stabilizing ayacut areas under Nagarjuna Sagar Project Left Canal, the reservoirs of Wyra, Paleru, and other minor irrigation schemes in Krishna basin.


The barrage, measuring 1332.75 metres in length, features 67 radial gates with flood discharge capabilities. With a Full Reservoir Level (FRL) of 63 metres, it will have a storage capacity of 36.57 TMC. The project is set to generate 282.80 MW of hydropower. The total approved cost was put at Rs 19,955 crore as of June 2023. An amount of Rs.927 crore was dedicated to the hydropower component.

The Benefit-Cost (BC) ratio was put at 1.57, and physical progress had reached 57 percent as of January 2025, reflecting an expenditure of Rs 11,320 crore. The project is slated for completion by Rabi 2026. Representatives from Telangana, including Rahul Bojja, Principal Secretary; G Anil Kumar, Engineer-in-Chief (General); Srinivas Reddy, Superintending Engineer, Kothagudem, S Subramayam Prasad, Deputy Director (General Branch) and S Vijaykumar, SE (interstate wing) attended the meeting.

 

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • Detailed Project Report
  • integrated project
  • Sitamma Sagar
  • SRLIP

Related News

  • Balka Suman accuses Congress of diverting focus from agrarian crisis

    Balka Suman accuses Congress of diverting focus from agrarian crisis

  • BRS flags PM Ekta Mall tender irregularities; Govt seeks detailed report

    BRS flags PM Ekta Mall tender irregularities; Govt seeks detailed report

  • Revanth Reddy presses Centre to expedite SBI CAPS appointment for Hyderabad Metro takeover

    Revanth Reddy presses Centre to expedite SBI CAPS appointment for Hyderabad Metro takeover

  • Dharmapuri land losers allege forced acquisition, seek fair compensation

    Dharmapuri land losers allege forced acquisition, seek fair compensation

Latest News

  • Virat Karrna’s next film with Kanishka Gandham titled ‘Rustum’

    4 hours ago
  • Telangana announces Rs 10,000 crore El Nino, drought mitigation programme

    4 hours ago
  • Centre brings fresh Bill to raise Lok Sabha, Assembly seats by 50%

    4 hours ago
  • Naidu urges parties to back Delimitation Bill and women’s reservation

    4 hours ago
  • Residents oppose proposed parkland auction at Lotus Pond, tension prevails

    4 hours ago
  • Editorial: Hasina’s homecoming, a political gambit

    5 hours ago
  • Telangana govt sanctions Rs 18.76 lakh for Minister Komatireddy’s medical treatment

    5 hours ago
  • Minakshi Hooda, Jyoti Gulia to lead India’s 17-member squad at World Boxing Cup Finals

    5 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App