Sunday, Jun 21, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Chandrayaan 3 Payloads On Sleep Mode Next Awakening On Sept 22 Isro

Chandrayaan-3 payloads on sleep mode; next awakening on Sept 22: ISRO 

The space agency said Vikram Lander has been set into sleep mode around 8 am Monday. Payloads have been switched off while lander receivers are kept on

By PTI
Published Date - 4 September 2023, 06:47 PM
Chandrayaan-3 payloads on sleep mode; next awakening on Sept 22: ISRO 
whatsapp facebook twitter telegram

Bengaluru: After a successful hop test where the Vikram lander was elevated and soft landed again on the Moon, ISRO on Monday said it has exceeded its objectives and now its payloads have been switched off.

The hop test will help scientists in future Moon missions where samples could be brought back to Earth and more importantly help the human missions being planned, ISRO added.

Also Read

  • Chandrayaan 3, Aditya L1 to be launched in July

The space agency said Vikram Lander has been set into sleep mode around 8 am Monday. Payloads have been switched off while lander receivers are kept on.

Before going into sleep mode, in-situ experiments by ChaSTE, RAMBHA-LP and ILSA payloads on lander were performed at the new location. The data collected was received at the Earth.

ISRO sources said that the payloads and ramp of the lander were folded back before performing the hop test.

Further, it was elevated by firing its engines and making it hop once on the lunar surface.

“On command it (Vikram lander) fired the engines, elevated itself by about 40 cm as expected and landed safely at a distance of 30 to 40 cm away,” ISRO said in an update on ‘X’.

“Vikram soft-landed on the moon, again! Vikram Lander exceeded its mission objectives,” ISRO added.

After the successful hop test, Vikram and Pragyan payloads are now in a power-off mode until the south pole of the lunar surface is back in the range of the Sun again.

ISRO said that Vikram will fall asleep next to Pragyan once the solar power is depleted and the battery is drained. The space agency said it was “hoping for their (Vikram and Pragyan’s) awakening, around September 22, 2023.” Scientists at ISRO said that after the Chandrayaan 3 mission landed on the lunar surface on August 23, Vikram and Pragyan performed all their planned experiments within one lunar day or approximately 14 earth days and finally after a hop test, have been put on sleep mode.

The temperatures could go up to -200 degree Celsius on the lunar surface soon. The payloads may not be able to withstand extreme temperatures while they are still powered on.

Therefore, the payloads have been switched off and will be powered on only after conditions are conducive for them to work again, an ISRO source said.

Elaborating on the experiment, ISRO’s update said the importance of the experiment is to help in future missions where samples from the Moon’s surface can be brought back to earth for further analysis.

The hop test can also help in the human missions as it confirmed ISRO’s ability to ‘kick-start’ the lander once again days after touching down on the lunar surface.

ISRO scientists said that after the Vikram lander carrying the Pragyan rover landed on the Moon, various experiments were conducted and the hop test was the latest.

It was not announced earlier but it is one of the tests that helped the Chandrayaan mission exceed its objectives, ISRO said.

The agency also released images of the lunar surface taken before and after the hop test.

When the payloads are switched on after 18 days, ISRO will be undertaking the same experiments it had conducted in the past few days on the lunar surface. This cycle will be repeated every 10 to 14 days until the pay loads are able to function on the Moon, an ISRO source added.

According to a senior ISRO scientist, the hop test showed that even after 14 days, its engines can be fired again.

  • Follow Us :
  • Tags
  • Chandrayaan-3
  • ISRO

Related News

  • Beyond Chandrayaan-3: ISRO developing long-life moon landers

    Beyond Chandrayaan-3: ISRO developing long-life moon landers

  • Raring to return to space: Astronaut Shubhanshu Shukla prepares for Gaganyaan mission

    Raring to return to space: Astronaut Shubhanshu Shukla prepares for Gaganyaan mission

  • ICEYE to set up first satellite manufacturing plant in India

    ICEYE to set up first satellite manufacturing plant in India

  • G20 satellite expected to be launched in 2027: ISRO chief Narayanan

    G20 satellite expected to be launched in 2027: ISRO chief Narayanan

Latest News

  • Former Minister rejects BRS link to SBI challenging in Raidurg land auction

    19 mins ago
  • Rakul Preet Singh on the growing influence of Yoga: It helps us reconnect with ourselves

    25 mins ago
  • Sooryavanshi’s 94 powers India A to 377/9 in tri-series final against Sri Lanka A

    32 mins ago
  • 2026 FIFA WC: Van Dijk hails Netherlands’ response after 5-1 win over Sweden

    30 mins ago
  • Kohli named in India ODI squad for England tour, subject to fitness clearance

    18 mins ago
  • 2026 FIFA WC: Germany 2-1 Cote d’Ivoire, Undav’s late brace sends Germans into knockouts

    1 hour ago
  • KTR felicitates Telangana JEE topper Vivan Maheshwari

    1 hour ago
  • RBI likely to hold repo rate at 5.25 pc as geopolitical risks ease: Report

    1 hour ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam