Saturday, Jul 11, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Completely Unacceptable Parliamentary Panel Flags Poor Quality Of Roads Built Under Pmgsy

Completely unacceptable: Parliamentary panel flags ‘poor quality’ of roads built under PMGSY

The parliamentary panel in its report also said the compromise in the quality of construction of roads was completely unacceptable and should be considered a punishable act

By PTI
Published Date - 27 July 2023, 07:50 PM
Completely unacceptable: Parliamentary panel flags ‘poor quality’ of roads built under PMGSY
Representational Image
whatsapp facebook twitter telegram

New Delhi: Flagging “poor quality” of many roads built under the Pradhan Mantri Gram Sadak Yojana, a parliamentary panel has said that such compromise was “completely unacceptable” and suggested that the thickness of roads under the scheme be increased from existing 20 mm to 30 mm.

In its report tabled in Lok Sabha on Thursday, the Department Related Standing Committee on Rural Development and Panchayati Raj also stressed on the need for better centre-state cooperation to properly implement the scheme.


The panel, which is headed by DMK MP Kanimozhi, stated that it is “constrained to note that the quality of road construction under PMGSY (Pradhan Mantri Gram Sadak Yojana) is an important issue affecting the entire country”.

“This glaring issue which casts aspersions on the marquee scheme of the central government has wider ramification on the hopes of rural populace of the country,” the committee said.

It also said the compromise in the quality of construction of roads was completely unacceptable and should be considered a punishable act.

“Instances are galore wherein the attention of the committee has been drawn towards the poor road materials used in the construction of roads at many places which are not able to sustain the rigours of weather and traffic volume even for one season and are washed away with the onset of monsoon,” it stated.

“The members of the committee having ground reality experience of their constituencies have time and again raised the nagging issue of poor quality of roads at many locations,” the panel said.

It urged the Department of Rural Development to entail stronger measures to ensure that the quality of roads constructed under PMGSY do not get compromised on account of utilisation of poor raw materials or other associated reasons.

The panel also pointed out that PMGSY roads are built under such guidelines which do not take into account plying of heavy tonnage vehicles which nowadays cause immense damage to rural roads.

“Heavy vehicles cause irreversible damage to the rural roads under PMGSY which are of the mandated thickness of 20 mm.” The panel members suggested that the thickness of roads under PMGSY should be increased from existing 20 mm to 30 mm.

Referring to the process of maintainance of the roads after construction, the committee said the usual design life of such roads is 10 years and as per the programme guidelines, onus of the maintenance of roads within defect liability period (initial five years) falls on the contractor, while post-DLP (next five years) is the responsibility of the state government concerned.

However, the report stated, contractors often do not pay heed to the enabling provisions and there are abundant instances, wherein non-adherence to the maintenance provision has resulted in shabby and damaged condition of PMGSY roads.

Stating that the situation demands an “iron-fisted approach”, the committee said the Department of Rural Development should ensure that the provisions of standard bidding documents on post-construction maintenance of roads are complied with in “letter and spirit” and erring contractors should be short-listed and strict action should be taken to black-list them.

On the implementation of the scheme in the Left Wing Extremism-affected areas being slow, the panel said it is concerned to note that only about 55.61 per cent of the work had been completed in these areas by the end of January this year.

They also noted with concern the non-presence of earthen or soil flanks on either side of PMGSY roads at many locations which cause major inconvenience to pedestrians and bicycle or two-wheeler riders.

The panel also said centre-state coordination acts as the fulcrum for the performance of this scheme and also expressed concern over an unspent balance of Rs 2,269.631 crore under the scheme as on January 20, 2023.

The committee recommended the department to increase the tempo of its ongoing efforts to ensure that the amounts under the head “unspent balances” get wiped out at a faster rate and projects are completed in a time-bound manner.

PMGSY was launched on December 25, 2000 with an aim of providing rural connectivity to unconnected habitations of 500-plus population in plain areas and 250-plus population in northeastern and Himalayan states.

Over time, the scheme evolved and introduced new verticals such as PMGSY-II, Road Connectivity Project of Left Wing Extremism affected Areas (RCPLWEA) and PMGSY-III to further bolster the road network through construction and upgradation of roads.

A total of Rs 2,94,088 crore has been spent on all the components of PMGSY by the end of January this year.

  • Follow Us :
  • Tags
  • India
  • Lok Sabha
  • parliamentary panel
  • Pradhan Mantri Gram Sadak Yojana

Related News

  • Shreyas Iyer’s unbeaten 80 lifts India to 158/7 against England in fourth T20I

    Shreyas Iyer’s unbeaten 80 lifts India to 158/7 against England in fourth T20I

  • Victoria university cleared to open Gurugram campus in India

    Victoria university cleared to open Gurugram campus in India

  • Strait of Hormuz tensions unlikely to hit India’s crude supplies immediately

    Strait of Hormuz tensions unlikely to hit India’s crude supplies immediately

  • Sitharaman welcomes AustralianSuper’s AU dollar 500 million investment in NIIF

    Sitharaman welcomes AustralianSuper’s AU dollar 500 million investment in NIIF

Latest News

  • Trump says US-Iran ceasefire over, talks to continue

    3 hours ago
  • Andhra Cabinet clears special NIA court in Visakhapatnam

    3 hours ago
  • India’s forex reserves jump $7.26 bn on gold, FCNR-B inflows

    3 hours ago
  • Lord’s Test: Smriti’s 83, Harmanpreet’s 58 help India reach 285 against England on Day 1

    3 hours ago
  • Jannik Sinner and Alexander Zverev set up Wimbledon final showdown

    3 hours ago
  • Opinion: Encounter killings — when state shoots first, and courts arrive later

    3 hours ago
  • Ram Mandir donation row: Maha Dy CM Shinde counters Sena with Siddhivinayak ‘loot’ charge

    4 hours ago
  • TT Impact: HMWSSB serves memos to 11 managers for resolving complaints without field visits

    4 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam