Friday, Nov 27, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Hyderabad | Four Lane Steel Rob Near Lingampally Station To Connect Gulmohar Junction With Bhel

Four-lane steel RoB near Lingampally station to connect Gulmohar Junction with BHEL

A four-lane steel road-over-bridge near Lingampally railway station is set to be built at a cost of Rs 308 crore. The project will connect Gulmohar Junction with BHEL, ease traffic congestion and benefit commuters in Tellapur and surrounding areas.

By Sunil Mungara
Updated On - 6 November 2026, 08:20 PM
Four-lane steel RoB near Lingampally station to connect Gulmohar Junction with BHEL
whatsapp facebook twitter telegram

Hyderabad: Construction of a four-lane steel road-over-bridge near Lingampally railway station is set to begin soon, offering relief to thousands of commuters in Hyderabad’s IT corridor and western suburbs.

Railway authorities dropped the proposed Bowstring structure for crossing the railway span and opted for a steel RoB after a joint inspection with Cyberabad Municipal Corporation officials. The earlier design had considered the proposed doubling or tripling of tracks at the station, a senior CMC engineering official said.


CMC chose a steel superstructure instead of conventional concrete to accelerate construction and minimise disruption to train services and local traffic. The proposed 2km RoB, from Gulmohar Junction to BHEL Junction, will include a two-lane up-ramp from Gulmohar Junction.

Following a meeting with Hyderabad Unified Metropolitan Transport Authority, CMC revised the blueprint to extend the Gachibowli-BHEL arm of Serilingampally RoB beyond Gulmohar Park junction. The extension is intended to take Gachibowli-to-BHEL traffic directly and reduce crowding on the existing Nallagandla RoB.

Cyberabad Traffic officials also identified a bottleneck near Taranagar on the road from Serilingampally RoB to BHEL. The stretch requires widening from the existing 60/80 feet to 100 feet under the approved Road Development Plan. The estimate was consequently modified by extending the two-lane Gachibowli-side up-ramp towards BHEL beyond Gulmohar Junction.

The project, including junction improvements, will cost Rs 308 crore and is aimed to be completed in two years, a CMC official said.

Tellapur RWA expects easier commuting

The RoB is expected to benefit residents and IT professionals in rapidly expanding Tellapur, who face delays at Lingampally railway station and the flood-prone underpass. During monsoon downpours, the underpass floods, halting traffic and stranding commuters. Reaching Gachibowli, Hi Tech City or the Financial District can take an additional 15 to 20 minutes merely to cross the railway track.

Benefits of the steel RoB Project:

The RoB provides relief to commuters from inundation of the existing RUB during rains and traffic congestion due to insufficient width and height of the existing RUB.

Traffic relief on Nallagandla ROB.

No. of piers: 41

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • BHEL junction
  • Cyberabad Municipal Corporation
  • Gulmohar Junction
  • Hyderabad IT Corridor traffic

Related News

  • Cyberabad firms pledge to cut employee commute vehicles by 10 pc by 2027

    Cyberabad firms pledge to cut employee commute vehicles by 10 pc by 2027

  • Minimum temps to drop by 2-4 degrees in Telangana as dry spell returns: IMD Hyderabad

    Minimum temps to drop by 2-4 degrees in Telangana as dry spell returns: IMD Hyderabad

  • Telangana needs stronger public transport as 74 pc rely on two-wheelers: Cyberabad CP

    Telangana needs stronger public transport as 74 pc rely on two-wheelers: Cyberabad CP

  • CMC sets November 30 deadline for trade licence renewal

    CMC sets November 30 deadline for trade licence renewal

Latest News

  • Delhi AQI improves after overnight spike, haze persists

    5 minutes ago
  • 2nd Test: India fight back with three wickets as New Zealand reach 131/4 at tea

    20 minutes ago
  • Hyderabad rains end month-long dry spell, bring down temperatures

    22 minutes ago
  • Rashmika Mandanna gives a glimpse of ‘what you’ll find her doing at home after work’

    45 minutes ago
  • Trump tells US troops ‘victory at hand’ over Iran

    1 hour ago
  • World Chess Championship: Gukesh plays rare variation in Berlin Defence as Game 3 ends in a hard-fought draw

    1 hour ago
  • Saudi airstrikes in Yemen reportedly kill four, including child; refinery attack kills worker

    9 hours ago
  • Opinion: The true measure of GST

    9 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App