Sunday, May 10, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Hyderabad | Hyderabad Metro Expansion Congress Govt Tweaks Brs Proposed Paradise Medchal Jbs Shamirpet Corridors

Hyderabad Metro Expansion: Congress govt tweaks BRS-proposed Paradise-Medchal, JBS-Shamirpet corridors

The two proposals were approved in the BRS Cabinet meeting held on July 31, 2023, to be taken up as part of the Phase-3'C' expansion, as the Defence Ministry did not issue required clearance for the corridors to pass through the Secunderabad Cantonment.

By Telangana Today
Published Date - 1 January 2025, 07:58 PM
Hyderabad Metro Expansion: Congress govt tweaks BRS-proposed Paradise-Medchal, JBS-Shamirpet corridors
Representational Image
whatsapp facebook twitter telegram

Hyderabad: The State government on Wednesday gave its nod for preparation of the detailed project reports (DPR) for extension of the Hyderabad Metro Rail from Paradise to Medchal and Jubilee Bus Station (JBS) to Shamirpet. The proposals are to be sent to the union government within three months for approval as part of Phase-2 ‘B’ expansion of the Metro services.

Chief Minister A Revanth Reddy took the decision after discussing the preparation of DPR for these two corridors with Municipal Administration Principal Secretary Dana Kishore and Hyderabad Airport Metro Limited (HAML), Managing Director, NVS Reddy on Wednesday.

Also Read

  • New Year’s gift to Hyderabad: Chief Minister decides to extend Metro Rail to Medchal and Shamirpet

These two corridors were initially proposed by the previous BRS government from Paradise to Kandlakoya (18.5 km) and JBS to Thumkunta (18.5 km) as two levels or a double-decker flyover where one of the levels would be exclusively for the Metro Rail. They were approved in the BRS Cabinet meeting held on July 31, 2023, to be taken up as part of the Phase-3’C’ expansion, as the Defence Ministry did not issue required clearance for the corridors to pass through the Secunderabad Cantonment.

The Congress government tweaked these plans slightly and is now proposing for extension up to Medchal and Shamirpet. The first corridor will be approximately 23 km from Paradise Metro Station to Medchal via Tad Bund, Bowenpally, Suchitra Circle, Kompally, Gundlapochampally, Kandlakoya and ORR Exit. The second corridor from JBS Metro Station to Shamirpet will be via Vikrampuri, Karkhana, Trimulgherry, Lothkunta, Alwal, Bolaram, Hakimpet, Thumkunta and ORR Exit.

In November this year, the Congress government had altered the Hyderabad Metro Rail expansion plans approved by the previous BRS Cabinet and submitted DPRs to the union government for five new corridors under Phase-2 expansion, with a length of 76.4 km and 54 stations. However, the Paradise-Medchal and JBS/Shamirpet corridors were not included due to the union government’s condition of availability of 90 per cent Right of Way.

NVS Reddy said the Chief Minister had instructed him to complete the preparation of the DPR within three months and seek the approval of the State government for submission to the Centre. Revanth Reddy has also asked for the ‘B’ part of Metro Phase-2, like the ‘A’ part, to be made a joint venture project of the Central and State governments.

  • Follow Us :
  • Tags
  • Hyderabad
  • Hyderabad Metro Rail
  • Metro Rail
  • NVS Reddy

Related News

  • Deeply honoured to welcome PM at our residence: Chandrababu Naidu

    Deeply honoured to welcome PM at our residence: Chandrababu Naidu

  • BRSV lays siege to DGP Office demanding arrest of Bandi Sanjay’s son

    BRSV lays siege to DGP Office demanding arrest of Bandi Sanjay’s son

  • India achieves major hypersonic missile technology breakthrough

    India achieves major hypersonic missile technology breakthrough

  • Trimulgherry football ground enclosed with high-rise wall amid corridor works

    Trimulgherry football ground enclosed with high-rise wall amid corridor works

Latest News

  • Vijay’s ‘Jana Nayagan’ likely to release within two weeks

    3 mins ago
  • ‘We will do our best to put a smile on fans ‘faces,’ says Karthik ahead of MI clash

    9 mins ago
  • Vice Admiral Sanjay Vatsayan appointed Western Naval Command chief

    17 mins ago
  • Telangana: Mancherial to host district-level badminton selection trials on May 23 and 24

    20 mins ago
  • Telangana student bags first rank in APCET in mining category

    30 mins ago
  • TVK MLA MV Karuppaiah sworn in as TN pro-tem Speaker

    38 mins ago
  • Six Sikh couples marry free of cost at Samuhik Vivah in Hyderabad

    40 mins ago
  • Petbasheerabad police to record victim’s statement in POCSO case against Bandi Sanjay’s son

    45 mins ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam