Monday, Oct 12, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Hyderabad | Hyderabad Nampally Railway Station Modernisation Picks Pace Reaches 20 Per Cent Completion

Hyderabad: Nampally Railway Station modernisation picks pace, reaches 20 per cent completion

Modernisation of Hyderabad Deccan (Nampally) Railway Station under the Amrit Bharat Station Scheme has reached nearly 20 per cent completion. Work on parking facilities, substations, residential quarters, air concourse foundations and a metro-connected skywalk is progressing.

By C. Romeo
Published Date - 19 September 2026, 02:57 PM
Hyderabad: Nampally Railway Station modernisation picks pace, reaches 20 per cent completion
Hyderabad: Nampally Railway Station modernisation picks pace, reaches 20 per cent completion
whatsapp facebook twitter telegram

Hyderabad: The modernisation of Hyderabad Deccan (Nampally) Railway Station, being undertaken under the Amrit Bharat Station Scheme, is going on at a brisk pace, with work on various facets of the station picking up pace.

According to Railway officials, the works are progressing as per the planned schedule and have reached nearly 20 per cent completion.

The project, being taken up at an estimated cost of Rs 327.27 crore, aims to transform the busy station into a world-class facility equipped to meet future passenger requirements. Nampally station handles an average of 50 trains and around 25,000 passengers every day. The redevelopment is targeted for completion by December 2027.

The B1 and B2 basement parking facilities on the northern side, the AC Coach Maintenance Office building and demolition of old quarters have been completed.

On the southern side, work on the basement parking foundation, 11 kV and 33 kV substations, and Type-2 residential quarters is progressing rapidly.

Of the 54 foundations planned for the air concourse, 14 have been completed. Construction of pillars for the metro-connected skywalk is also underway, while the removal of the old building on the eastern side is in progress.

Modernisation of Nampally Railway Station:

Major facilities proposed:

  • A new G2 main station building on the eastern side and modernisation of the western-side entrance
  • A massive 72 × 90-metre air concourse spanning the tracks and platforms
  • A 9-metre-wide skywalk/FOB with travellators providing direct connectivity to Nampally Metro Station
  • Underground basement parking for 145 cars, including EV charging facilities
  • 875 kWp solar panels and green-building certification

Facilities:

  • 16 lifts
  • 8 escalators
  • 2 travellators
  • Food courts
  • Shopping areas
  • Wi-Fi availability
  • Advanced CCTV-based security systems

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • Amrit Bharat Station Scheme
  • Hyderabad
  • Hyderabad Deccan
  • Hyderabad Railway Station

Related News

  • Hyderabad police arrest former guard in Kowkoor girl kidnapping and murder case

    Hyderabad police arrest former guard in Kowkoor girl kidnapping and murder case

  • GHMC hosts Japanese delegation as Hyderabad–Miyoshi partnership turns 20

    GHMC hosts Japanese delegation as Hyderabad–Miyoshi partnership turns 20

  • Hyderabad: Car hits road divider, catches fire; No one injured

    Hyderabad: Car hits road divider, catches fire; No one injured

  • Hyderabad: Techie allegedly ends life in Kondapur by inhaling helium gas

    Hyderabad: Techie allegedly ends life in Kondapur by inhaling helium gas

Latest News

  • Hockey Nationals: Bihar edge Andhra Pradesh 4-3 in thrilling Division C clash

    4 minutes ago
  • BRS makes massive arrangements for Singareni Karmika Garjana meeting on October 14

    10 minutes ago
  • India banks on Sindhu and Satwik-Chirag at Denmark Open 2026

    15 minutes ago
  • Niranjan Reddy slams Congress for postponing Cabinet meeting on El Nino

    25 minutes ago
  • No change in Hindi release plans for Rajinikanth’s ‘Jailer 2’, makers clarify

    42 minutes ago
  • Bathukamma celebrations draw huge crowds in Dubai as KCR slogans echo

    44 minutes ago
  • BRS cadres told to speed up voter registration for Graduates’ MLC election

    51 minutes ago
  • Osmania Hospital faces disruption as medical students and residents strike

    58 minutes ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App