Saturday, Mar 25, 2023
English News
  • Hyderabad
  • Telangana
  • Andhra Pradesh
  • India
  • World
  • Entertainment
  • Science and Tech
  • Sport
  • Business
  • ...
    • NRI
    • View Point
    • cartoon
    • Columns
    • Reviews
    • Education Today
    • Property
    • Videos
    • Lifestyle
    • Rewind
E-Paper
  • NRI
  • View Point
  • cartoon
  • Columns
  • Reviews
  • Education Today
  • Property
  • Videos
  • Lifestyle
  • Rewind
Home | India | Kumbh Mela Centralised Control Room Set Up At Haridwar Railway Station

Kumbh Mela: Centralised control room set up at Haridwar railway station

The preparations are underway for Kumbh Mela 2021 to be held from 1st to 30th April in Haridwar.

By ANI
Published Date - 04:13 PM, Sat - 27 February 21
Kumbh Mela: Centralised control room set up at Haridwar railway station
Representational Image.

Haridwar: A centralised control room has been set up at Haridwar railway station ahead of Kumbh Mela 2021, informed Kumbh Mela Administration on Saturday.

“A centralised control room set up at Haridwar railway station ahead of Kumbh Mela 2021. All the nearby railway stations have been connected through CCTV, with their feed being streamed at this control room. A telephone line has also been set up at the centre,” it said.

The preparations are underway for Kumbh Mela 2021 to be held from 1st to 30th April in Haridwar.

The Uttarakhand government has decided to limit the Kumbh this year to 30 days due to pandemic.

Officers in charge of the Kumbh Mela said that those who attend the religious congregation should do prior registration at a portal and should have a COVID-19 negative report.

Kumbh Mela is not only a religious pilgrimage, but one of the largest mass gatherings at one place. It is celebrated four times over a course of 12 years and spans four locations namely Prayagraj, Haridwar, Ujjain and Nashik. The Maha Kumbh is celebrated in a cycle of 12 years at four river-bank pilgrimage sites across India.

  • Follow Us :
  • Tags
  • Centralised control room
  • Haridwar railway station
  • Kumbh Mela 2021

Related News

  • Kumbh Mela to be held for 28 days starting from April 1 amid Covid-19

    Kumbh Mela to be held for 28 days starting from April 1 amid Covid-19

Latest News

  • Telangana Congress condemns Rahul Gandhi’s disqualification

    7 mins ago
  • Andhra Pradesh: YSRC rebel MLA joins TDP

    22 mins ago
  • Hyderabad-based firm comes up with cost-effective STPs

    37 mins ago
  • Russian strikes in Ukraine kill 10 civilians, wound 20 more

    52 mins ago
  • ChatGPT has the power to change healthcare: Report

    1 hour ago
  • Infiltration bid foiled in Jammu and Kashmir, one terrorist killed

    1 hour ago
  • Google searches for ‘The Elephant Whisperers’ skyrocketed 8,164 percent after Oscar win

    2 hours ago
  • Opinion: Little changed for Iraq

    7 hours ago

company

  • Home
  • About Us
  • Contact Us

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

© Copyrights 2022 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam