Thursday, Oct 1, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Hyderabad | Malkajgiri Railway Station Redevelopment Underway Set For Completion In Six Months

Malkajgiri railway station redevelopment underway, set for completion in six months

As many as 1,275 stations have been shortlisted across India for renovation and redevelopment by the Indian Railway. Among them, Malkajgiri railway station was selected and a budget of Rs 27 crore was allocated for developing work.

By C. Romeo
Published Date - 13 October 2024, 11:22 PM
Malkajgiri railway station redevelopment underway, set for completion in six months
An artist impression of the proposed Malkajgiri Railway Station.
whatsapp facebook twitter telegram

Hyderabad: The redevelopment of Malkajgiri railway station which was taken up as part of the Amrit Bharat Station Scheme (ABSS) is going on at a brisk pace and is expected to be completed in next six months. As many as 1,275 stations have been shortlisted across India for renovation and redevelopment by the Indian Railway. Among them, Malkajgiri railway station was selected and a budget of Rs 27 crore was allocated for developing work.

According to the South Central Railway (SCR) authorities, the works were under process, including the foundation of a 12-metre wide Foot over Bridge, lifts and centering works on the ground floor for the AC waiting hall and RPF office. The construction of a highlevel water tank is also completed and a shelter on platform number 1 and 2 is in the completion stage. Apart from this, construction of VIP lounge, toilets and bathrooms on platform 1 and 2 side walls is in progress.


The approach road from the old parking shed to LC Gate Road on the east side of Terminal-1 has also been formed and a cement concrete road will be laid, using which passengers can directly reach the station from Anutex Circle. Also, an elevation on both sides with porticos is being planned with arches and a park and water fountains and a ‘I Love Malkajgiri’ selfie point is also on cards.

“As the footfall at Malkajgiri has increased, it will be better if one more platform on the east side adjacent to the booking counter to LC Gate No 255 Gouthamnagar- Malkajgiri-Medchal is provided,” said Praveen Kumar, a local resident. Currently, around 62 trains are passing through the station on a daily basis, with around 600 general ticket holders and 500 reserved ticket holders’ travelling every day. Meanwhile, along with the facelift of the station, the locals requested the SCR authorities to construct a platform and upgrade a few facilities for the benefit of passengers.

“The construction began last year and is expected to take around six months to complete. It will be better if three tracks for stabling and three tracks for pit lines near Lallaguda station get constructed so as to avoid sending trains from Kacheguda to Bolarum,” said Noor Mohammed Ali, member of Suburban Train Travellers Association.

  • Follow Us :
  • Tags
  • Amrit Bharat Station Scheme
  • Indian Railway
  • Malkajgiri
  • Malkajgiri railway station

Related News

  • SCR announces temporary stoppage of 10 trains at Hi-Tech City station

    SCR announces temporary stoppage of 10 trains at Hi-Tech City station

  • Train mows down flock of sheep near Ghatkesar railway station

    Train mows down flock of sheep near Ghatkesar railway station

  • Malkajgiri teams raid two food units, seize paneer and skimmed milk powder

    Malkajgiri teams raid two food units, seize paneer and skimmed milk powder

  • KAVACH 4.0 commissioned on 108-km stretch in Hyderabad Division

    KAVACH 4.0 commissioned on 108-km stretch in Hyderabad Division

Latest News

  • Israeli leaders hail Indian pilot as ‘true hero’ for foiling flydubai crash attempt

    8 minutes ago
  • Telangana’s Sandhya Reddy elected Mayor of Strathfield; Revanth extends wishes

    13 minutes ago
  • Flood crisis deepens in Bihar as embankments breached by Gandak River across multiple districts

    17 minutes ago
  • 2008 Ahmedabad bomb blasts: SC stays execution of death penalty of IM operative

    17 minutes ago
  • Ancy Sojan blames fatigue, fate for missing Asian Games gold by 2cm

    24 minutes ago
  • US questions Most-Favoured-Nation cornerstone of global trade

    30 minutes ago
  • Asian Games: Nitesh Siwach ends 64-year wait, enters Greco-Roman wrestling final

    40 minutes ago
  • India highly important trading partner: Brazilian Minister Rosa

    46 minutes ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App