Monday, Nov 16, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Hyderabad | Malkajgiri Railway Station Redevelopment Underway Set For Completion In Six Months

Malkajgiri railway station redevelopment underway, set for completion in six months

As many as 1,275 stations have been shortlisted across India for renovation and redevelopment by the Indian Railway. Among them, Malkajgiri railway station was selected and a budget of Rs 27 crore was allocated for developing work.

By C. Romeo
Published Date - 13 October 2024, 11:22 PM
Malkajgiri railway station redevelopment underway, set for completion in six months
An artist impression of the proposed Malkajgiri Railway Station.
whatsapp facebook twitter telegram

Hyderabad: The redevelopment of Malkajgiri railway station which was taken up as part of the Amrit Bharat Station Scheme (ABSS) is going on at a brisk pace and is expected to be completed in next six months. As many as 1,275 stations have been shortlisted across India for renovation and redevelopment by the Indian Railway. Among them, Malkajgiri railway station was selected and a budget of Rs 27 crore was allocated for developing work.

According to the South Central Railway (SCR) authorities, the works were under process, including the foundation of a 12-metre wide Foot over Bridge, lifts and centering works on the ground floor for the AC waiting hall and RPF office. The construction of a highlevel water tank is also completed and a shelter on platform number 1 and 2 is in the completion stage. Apart from this, construction of VIP lounge, toilets and bathrooms on platform 1 and 2 side walls is in progress.


The approach road from the old parking shed to LC Gate Road on the east side of Terminal-1 has also been formed and a cement concrete road will be laid, using which passengers can directly reach the station from Anutex Circle. Also, an elevation on both sides with porticos is being planned with arches and a park and water fountains and a ‘I Love Malkajgiri’ selfie point is also on cards.

“As the footfall at Malkajgiri has increased, it will be better if one more platform on the east side adjacent to the booking counter to LC Gate No 255 Gouthamnagar- Malkajgiri-Medchal is provided,” said Praveen Kumar, a local resident. Currently, around 62 trains are passing through the station on a daily basis, with around 600 general ticket holders and 500 reserved ticket holders’ travelling every day. Meanwhile, along with the facelift of the station, the locals requested the SCR authorities to construct a platform and upgrade a few facilities for the benefit of passengers.

“The construction began last year and is expected to take around six months to complete. It will be better if three tracks for stabling and three tracks for pit lines near Lallaguda station get constructed so as to avoid sending trains from Kacheguda to Bolarum,” said Noor Mohammed Ali, member of Suburban Train Travellers Association.

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • Amrit Bharat Station Scheme
  • Indian Railway
  • Malkajgiri
  • Malkajgiri railway station

Related News

  • Hyderabad celebrates Chhath Puja with prayers at major water bodies

    Hyderabad celebrates Chhath Puja with prayers at major water bodies

  • Malkajgiri rail passengers struggle without toilets as station awaits inauguration

    Malkajgiri rail passengers struggle without toilets as station awaits inauguration

  • Local Basketball: South Central Railway thrash Mamata Medical College 71-37

    Local Basketball: South Central Railway thrash Mamata Medical College 71-37

  • Hyderabad: SCR operates nearly 400 special trains to handle festival rush

    Hyderabad: SCR operates nearly 400 special trains to handle festival rush

Latest News

  • Arshdeep recalls crucial last-wicket stand with Siraj in New Zealand decider

    12 minutes ago
  • ACB finds assets worth Rs 6.76 crore in case against Moinabad town planning officer

    13 minutes ago
  • AFI appoints Parveer Singh as chief coach, Raj Mohan to lead junior programme

    17 minutes ago
  • BITS Hyderabad team patents solar-powered desalination, cooling system

    17 minutes ago
  • Virat Kohli has another three to four years at RCB, hopes Faf du Plessis

    28 minutes ago
  • Congress leaders from Devarakonda join BRS in presence of former MLA

    33 minutes ago
  • JEE Main 2027: NTA urges applicants to pay fees before November 22

    38 minutes ago
  • BCCI congratulates Jay Shah on reappointment as ICC Chair

    42 minutes ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App