Monday, Apr 20, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | World | Nepal Aims To Develop 30000 Mw Of Electricity By 2035

Nepal aims to develop 30,000 MW of electricity by 2035

Laying the foundation for the construction of a hydropower project here on Tuesday, Basnet said that the government was preparing to develop a comprehensive energy development programme supported by a concrete action plan to generate 30,000 MW of power by 2035.

By PTI
Updated On - 13 September 2023, 09:39 PM
Nepal aims to develop 30,000 MW of electricity by 2035
whatsapp facebook twitter telegram

Kathmandu: Nepal aims to develop 30,000 MW of electricity within the next 12 years as the market for the Himalayan nation’s hydropower is growing in India and Bangladesh, the Minister for Energy, Water Resources and Irrigation, Shakti Bahadur Basnet has said.

Laying the foundation for the construction of a hydropower project here on Tuesday, Basnet said that the government was preparing to develop a comprehensive energy development programme supported by a concrete action plan to generate 30,000 MW of power by 2035.

Also Read

  • Nepal rejects China’s new map; urges countries to respect its latest map

“Our target under this programme is to produce electricity in the range of 25,000 MW-30,000 MW by 2035,” Basnet said while performing the groundbreaking ceremony for the 216 MW Upper Trishuli-1 hydropower project.

Pointing out that Nepal’s domestic demand for electricity is expected to reach 15,000 MW in the next 12 years, the minister said that besides developing hydropower projects, the roadmap will also involve constructing required transmission and distribution facilities and institutional reforms.

According to Basnet, Nepal’s existing hydropower generation capacity has reached around 2,800 MW.

“Several projects with a combined capacity of around 5000 MW are under construction,” he said.

In August, an understanding was reached in principle for the supply of electricity from Nepal to Bangladesh via an Indian transmission line, according to officials at the Nepal Electricity Authority (NEA), and a formal agreement between the three nations will be signed soon.

Basnet praised South Korea for investing in the hydropower project here and called it a significant, high-quality investment for Nepal’s hydropower sector.

Nepal Water and Energy Development Company, a joint venture between Nepal and South Korea, is developing the project located at Dhunche in Rasuwa district, 75 km north of Kathmandu.

In 2022, the company completed its financial closure for the project, where it plans to invest around USD 647.4 million to develop the medium-sized hydroelectric project.

South Korean companies have a 75 per cent stake in the company’s equity, while the International Finance Corporation (IFC) has a 15 per cent stake, and a Nepali local partner has a 10 per cent stake, according to officials.

Speaking at the function, South Korean Ambassador to Nepal Park Tae-Young said that Upper Trishuli-1 is the third hydropower project in Nepal that got financing from South Korea. Chameliya and Modi Khola are the other two projects completed earlier with South Korean funding.

Construction of Upper Trishuli-1 is expected to be completed in the next five years. The run-of-river type project, built under the Build, Own, Operate and Transfer modality, will come under the ownership of the Nepal government after 30 years.

  • Follow Us :
  • Tags
  • Electricity
  • Nepal

Related News

  • Bus carrying Indian pilgrims plunges down slope killing seven

    Bus carrying Indian pilgrims plunges down slope killing seven

  • Indo-Nepal border to remain closed from March 2 midnight ahead of Nepal polls

    Indo-Nepal border to remain closed from March 2 midnight ahead of Nepal polls

  • T20 World Cup: Kalugamage three-for helps Italy bowl out Nepal for 123

    T20 World Cup: Kalugamage three-for helps Italy bowl out Nepal for 123

  • 2 Bihar residents arrested in Nepal with fake Indian currency

    2 Bihar residents arrested in Nepal with fake Indian currency

Latest News

  • SC rejects ‘fishing inquiry’ plea on WB voter additions

    1 min ago
  • Man held for posting derogatory content on actor Anasuya Bharadwaj

    2 mins ago
  • Over 6,000 Afghan refugees return home in a single day

    6 mins ago
  • Defeat ‘slave’ alliance, respond to BJP’s betrayal, Udhayanidhi tells people

    10 mins ago
  • Taekwondo Premier League Season 2 Leg 1 concludes in Hyderabad

    11 mins ago
  • UK calls for ‘toll-free’ Strait of Hormuz 

    15 mins ago
  • Hyderabad-based IICT technologies cut dialysis cost by 70 per cent in India

    15 mins ago
  • NCW calls for lifelong care for acid attack survivors in India

    20 mins ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

.