Saturday, Jun 20, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | World | Power Cuts Return To South Africa After 10 Months

Power cuts return to South Africa after 10 months

During a media briefing Friday afternoon, Ramokgopa explained that several factors, including a number of unit failures at state power utility Eskom's power stations, led to a "perfect storm," triggering the necessity of initiating load-shedding.

By IANS
Published Date - 1 February 2025, 07:13 AM
Power cuts return to South Africa after 10 months
whatsapp facebook twitter telegram

Johannesburg: South Africa will experience load-shedding, or rolling blackouts, over the weekend after more than 10 months of uninterrupted electricity supply, Minister of Electricity and Energy Kgosientsho Ramokgopa said.

During a media briefing Friday afternoon, Ramokgopa explained that several factors, including a number of unit failures at state power utility Eskom’s power stations, led to a “perfect storm,” triggering the necessity of initiating load-shedding.


“We had units out for planned maintenance, and then there were unit failures at Matimba and Lethabo power stations. For most of the week, we had to rely on the open-cycle gas turbines. We had to rely on diesel. We exhausted our reserves,” he said.

This came after Eskom announced that stage 3 load-shedding would be implemented Friday and run for the weekend, Xinhua news agency reported.

“This is a potentially temporary setback. Load-shedding is largely behind us due to the structural improvements in our generation fleet,” said Eskom Group Chief Executive (CEO) Dan Marokane in a statement. “However, over the past seven days, we have experienced several breakdowns that require extended repair times. This has necessitated the use of all our emergency reserves, which now need to be replenished over the weekend.”

As the country prepared for a resumption of load-shedding later Friday, Rethabile Melamu, CEO of the South African Photovoltaic Industry Association, said it is important not to lose focus and not to lose hope, urging all stakeholders to work with the government to address the power cuts.

“This is indeed a sad setback, but our work needs to continue. We are within touching distance of the finish line. I call on all stakeholders and role-players to remain committed to finally ending load-shedding permanently,” she said.

Scheduled power cuts, commonly referred to as load-shedding in South Africa, have hindered the country’s economic growth for over a decade. Since March last year, however, there have been no power cuts due to a significant improvement in Eskom’s electricity supply, resulting in more than 300 consecutive days without outages.

  • Follow Us :
  • Tags
  • Johannesburg
  • Kgosientsho Ramokgopa
  • South Africa
  • South African Photovoltaic Industry Association

Related News

  • 2026 FIFA WC: South Africa holds Czechia 1-1 after Mokoena’s late equaliser

    2026 FIFA WC: South Africa holds Czechia 1-1 after Mokoena’s late equaliser

  • South Africa looks to India’s UPI model to drive cashless economy

    South Africa looks to India’s UPI model to drive cashless economy

  • How scientists cracked a rare hantavirus outbreak linked to a cruise ship far from shore

    How scientists cracked a rare hantavirus outbreak linked to a cruise ship far from shore

  • India drop to sixth in WTC standings after Bangladesh sweep Pakistan

    India drop to sixth in WTC standings after Bangladesh sweep Pakistan

Latest News

  • Dozens feared injured in London-bound train crash

    7 hours ago
  • Hyderabad police announce diversions ahead of Elephant Trial Walk procession on June 20

    7 hours ago
  • Telangana CID arrests Worldline VP in Falcon fraud case

    7 hours ago
  • Congress govt eyes revenue growth through tourism, sand exports

    8 hours ago
  • Editorial: The high cost of Bihar’s dry law

    8 hours ago
  • Jilted lover held for knife attack on woman’s family in Raidurgam

    8 hours ago
  • Raidurg land auction case: Telangana govt weighs future dealings with SBI

    8 hours ago
  • Opinion: Modern Pompeii — questions only

    8 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam