Thursday, Apr 23, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Business | Reliance Bp Start 2nd New Deepwater Gas Field In Kg D6 Block

Reliance, bp start 2nd new deepwater gas field in KG D6 block

Accordingly, RIL and bp have been developing three deep-water gas developments in block KG D6 - 'R Cluster, Satellite Cluster and MJ' - which together are expected to produce around 30 mmscmd.

By IANS
Published Date - 26 April 2021, 11:50 AM
Reliance, bp start 2nd new deepwater gas field in KG D6 block
whatsapp facebook twitter telegram

Mumbai: Reliance Industries Limited (RIL) and bp on Monday announced the start of production from the ‘Satellite Cluster’ gas field in block KG D6 off the east coast of India.

Accordingly, RIL and bp have been developing three deep-water gas developments in block KG D6 – ‘R Cluster, Satellite Cluster and MJ’ – which together are expected to produce around 30 mmscmd (1 billion cubic feet a day) of natural gas by 2023, meeting up to 15 per cent of India’s gas demand.


“The developments will each utilise the existing hub infrastructure in the KG D6 block. RIL is the operator of the block with a 66.67 per cent participating interest and bp holds a 33.33 per cent participating interest.”

“The ‘Satellite Cluster’ is the second of the three developments to come onstream, following the start-up of ‘R Cluster’ in December 2020. It had originally been scheduled to start production in mid-2021.”

As per the statement, the field is located about 60 km from the existing onshore terminal at Kakinada on the east coast of India in water depths of up to 1,850 meters.

“The field will produce gas from four reservoirs utilising a total of five wells and is expected to reach gas production of up to 6 mmscmd. Together, the ‘R Cluster’ and ‘Satellite Cluster’ are expected to contribute to about 20 per cent of India’s current gas production.”

“The third KG D6 development, ‘MJ’, is expected to come onstream towards the latter half of 2022.”

  • Follow Us :
  • Tags
  • east coast
  • India
  • KG-D6
  • Mumbai

Related News

  • India, South Korea sign pact to boost MSME ties​

    India, South Korea sign pact to boost MSME ties​

  • Adani Power expands into nuclear sector with new subsidiary

    Adani Power expands into nuclear sector with new subsidiary

  • Sharad Pawar hospitalised in Mumbai

    Sharad Pawar hospitalised in Mumbai

  • Rupee falls 25 paise to settle at 93.16 against US dollar 

    Rupee falls 25 paise to settle at 93.16 against US dollar 

Latest News

  • Lucknow suffers embarrasing 40-run loss against Rajasthan Royals

    4 hours ago
  • Opinion: Vishwa Guru vision must begin at home

    4 hours ago
  • DMK-Congress alliance vows to protect Tamil identity, says Rahul Gandhi

    4 hours ago
  • Editorial: Tim Cook leaves an enduring legacy

    4 hours ago
  • Delhi High Court holds YouTuber guilty of criminal contempt

    4 hours ago
  • TMC minister Bratya Basu warns of detention camps if BJP wins Bengal

    4 hours ago
  • Vendor, not SPG officer: Truth behind Modi’s Jhargram Jhalmuri stop

    5 hours ago
  • EC issues show cause notice to Kharge over ‘terrorist’ jibe at PM Modi

    5 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

.