Desilting of nalas and drains is progressing at a snail’s pace. Huge piles of mud remain accumulated on main roads, along with uncovered manholes, open craters filled with pebbles, and potholes that remain unfilled — all of which are likely to become major problem areas once the rains begin to lash the city