The barrage had been constructed by L&T Construction, as per the design provided by authorities to the quality and standards for Telangana and handed over in 2019.
This will be the biggest Tunnel Boring Machine to be deployed in the Himalayan geology and the TBM bored tunnel length of 20.807 km is the maximum in any project in the region.