Saturday, Jul 11, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Business | Lt Lowest Bidder For Rishikesh Karnaprayag Railway Project

L&T lowest bidder for Rishikesh-Karnaprayag railway project

This will be the biggest Tunnel Boring Machine to be deployed in the Himalayan geology and the TBM bored tunnel length of 20.807 km is the maximum in any project in the region.

By IANS
Published Date - 5 January 2021, 03:02 PM
L&T lowest bidder for Rishikesh-Karnaprayag railway project
whatsapp facebook twitter telegram

Mumbai: The Heavy Civil Infrastructure business of L&T Construction has emerged as the lowest bidder for a Package 4 of new broad-gauge line between Rishikesh and Karnaprayag, sources privy to the development said.

The scope of this engineering and construction project includes completing tunnel work by Tunnel Boring Method (TBM) and New Austrian Tunnel Method (NATM) with formation, construction shaft and ancillary works from Chainage 47+360 to 63+117 Km in the Himalayan State of Uttarakhand.


This will be the biggest Tunnel Boring Machine to be deployed in the Himalayan geology and the TBM bored tunnel length of 20.807 km is the maximum in any project in the region.

The purpose of providing rail link between Rishikesh and Karanprayag is for facilitating easy access to pilgrimage centres situated in Uttarakhand, connecting new trade centre, development of hinterlands to serve the population there.

The railway line traverses “very rugged Himalayan terrain”, with the alignment oriented across and sometimes sub parallel to the major thrust zones of Himalaya with complex geological conditions.

Project involves construction of 14.577 km upline and 13.123 km downline tunnel with embankment of approximately 800 meters at both ends. Out of 14.577 and 13.123 km; 10.49 Km and 10.317 km of tunnel will be excavated using two Brand New Hard Rock Tunnel Boring Machines (TBMs) of diameter 9.1 meters and balance tunnel will be excavated by New Austrian Tunnelling Method (NATM).

The scope also includes construction of an Ellipsoidal construction cum Ventilation shaft of finished cross section of 79 square meters and depth of 32 meters.

The company is already engaged in the construction of Rishikesh – Karanprayag Tunnel 2 package by RVNL comprising tunnels, bridges and formation works. This project, won by the Heavy Civil Infrastructure business of the company in December 2019, consists of the main tunnel with parallel escape tunnel and ballast-less track that runs inside the main tunnel.

  • Follow Us :
  • Tags
  • Heavy Civil Infrastructure
  • Himalayan state
  • Hyderabad
  • Hyderabad Today

Related News

  • Seven teams formed to nab Shabad murder suspect: Future City CP

    Seven teams formed to nab Shabad murder suspect: Future City CP

  • Martha Lillard, last US iron lung polio survivor, dies at 78

    Martha Lillard, last US iron lung polio survivor, dies at 78

  • Man kills six persons including 17-year-old girl and two toddlers in Shabad near Hyderabad

    Man kills six persons including 17-year-old girl and two toddlers in Shabad near Hyderabad

  • Women’s cricket participation doubles in Telangana and Andhra Pradesh

    Women’s cricket participation doubles in Telangana and Andhra Pradesh

Latest News

  • India-New Zealand Free Trade Agreement to boost trade and investment: PM Modi

    28 mins ago
  • India calls for end to embargoes that violate national sovereignty

    50 mins ago
  • PM Modi, Luxon strengthen India-New Zealand relations

    1 hour ago
  • Trump says US-Iran ceasefire over, talks to continue

    9 hours ago
  • Andhra Cabinet clears special NIA court in Visakhapatnam

    9 hours ago
  • India’s forex reserves jump $7.26 bn on gold, FCNR-B inflows

    9 hours ago
  • Lord’s Test: Smriti’s 83, Harmanpreet’s 58 help India reach 285 against England on Day 1

    9 hours ago
  • Jannik Sinner and Alexander Zverev set up Wimbledon final showdown

    9 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam