Saturday, Jul 11, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Toll Rates Slashed By Up To 50 Pc For Highways With Bridges Flyovers Tunnels

Toll rates slashed by up to 50 pc for highways with bridges, flyovers, tunnels

The Centre has slashed toll rates by up to 50% on highway stretches featuring structures like flyovers and tunnels. A new calculation formula under revised rules brings down costs. An annual FASTag pass for private vehicles will also be available from August 15.

By IANS
Published Date - 5 July 2025, 11:50 AM
Toll rates slashed by up to 50 pc for highways with bridges, flyovers, tunnels
whatsapp facebook twitter telegram

New Delhi: In a major relief for motorists, the government has reduced toll rates by up to 50 per cent on certain sections of National Highways that include structures like tunnels, bridges, flyovers, and elevated roads. The move is aimed at lowering travel costs and making road journeys more affordable for the public.

The Ministry of Road Transport and Highways has amended the National Highways Fee Rules, 2008, and notified a new formula for calculating toll charges. According to the new rule, tolls will now be calculated in a way that significantly reduces the fee on highway sections that consist mainly of such costly infrastructure.


As per the notification, if a section of the National Highway includes structures like flyovers or tunnels, the toll will be calculated based on the lesser of two values: Either ten times the length of the structures or five times the total length of the highway section.

To explain this with an example, the ministry said that if a 40-kilometre stretch of a highway is entirely made up of structures like bridges or flyovers, then toll will be calculated on the lower of the two options — either 10 times the structure length (400 km) or 5 times the total length (200 km). In this case, toll will be charged based on 200 km, effectively reducing the rate by half.

Earlier, users had to pay ten times the regular toll rate for every kilometre of such structures, as these types of infrastructure are more expensive to build and maintain.

Meanwhile, in another step towards hassle-free highway travel, Union Road Transport and Highways Minister Nitin Gadkari announced a new FASTag-based annual pass for private vehicles last month. The pass, priced at Rs 3,000, will be available from August 15 this year.

Designed specifically for non-commercial private vehicles such as cars, jeeps, and vans, the annual pass will remain valid for one year from the date of activation or up to 200 trips — whichever comes first.

  • Follow Us :
  • Tags
  • Ministry of Road Transport and Highways
  • National Highways Fee Rules
  • toll payments

Related News

  • NH-15 expansion: Assam CM hails Rs 15431 crore highway four-laning project for Guwahati-Tezpur route

    NH-15 expansion: Assam CM hails Rs 15431 crore highway four-laning project for Guwahati-Tezpur route

  • Telangana’s vehicle scrapping scheme falters as old vehicles stay on roads

    Telangana’s vehicle scrapping scheme falters as old vehicles stay on roads

  • Editorial: India’s move to make roads safer must go beyond identification

    Editorial: India’s move to make roads safer must go beyond identification

  • Congress govt’s plan to allow toll-free travel to Andhra Pradesh during Sankranti draws criticism

    Congress govt’s plan to allow toll-free travel to Andhra Pradesh during Sankranti draws criticism

Latest News

  • Meta discontinues AI image tool days after privacy concerns emerge

    2 mins ago
  • SIA secures Interpol Red Corner Notice against Hizbul terrorist

    4 mins ago
  • Opinion: Completing India’s Indo-Pacific arc

    5 mins ago
  • TG EAPCET 2026: CSE, AI courses dominate first-phase engineering seat allotment

    7 mins ago
  • Tourists from Telangana and Andhra among 15 killed in Vietnam boat capsize

    33 seconds ago
  • Modi, Luxon elevate India-NZ ties, set Rs 35,000 Crore trade goal

    16 mins ago
  • Kerala won’t tolerate drug use at DJ parties or in caravans: Ramesh Chennithala

    30 mins ago
  • MEA hails PM Modi’s New Zealand visit for strengthening bilateral ties

    45 mins ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam