Friday, Nov 27, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Balasore Train Tragedy Level Crossing Repair Work Done At Bahanaga Bazar Station Without Approval Says Cbi

Balasore train tragedy: Level crossing repair work done at Bahanaga Bazar station without approval, says CBI

The CBI had arrested Mahanta and two other railway officials on July 7, 2023 in connection with its probe in the Balasore triple train accident case in which 296 people were killed and over 1,200 injured.

By PTI
Updated On - 24 August 2023, 06:00 PM
Balasore train tragedy: Level crossing repair work done at Bahanaga Bazar station without approval, says CBI
whatsapp facebook twitter telegram

New Delhi: Repair work at a level crossing near Bahanaga Bazar railway station in Odisha’s Balasore where the June 2 train crash took place was allegedly conducted without the approval of senior divisional signal and telecom engineer and without an approved circuit diagram.

The CBI made the submission before a special court in c alleging that one of the reasons behind the accident was the repair work at level crossing (LC) gate number 94 near Bahanaga Bazar station done by Senior Section Engineer (Signal In-charge) Arun Kumar Mahanta using the circuit diagram of another LC gate no. 79, officials said on Thursday.

Also Read

  • Rafael Nadal joins Infosys as brand ambassador
  • Transaction limit for small value payments in offline mode raised to Rs 500

The allegations were refuted by Mahanta claiming that LC gate no. 94 at KM 255/11-13 had not been working properly, but the higher officials did not take “active action” for the same.

He had said that the supervision work in question was entrusted to some other persons, hence he was not responsible for the accident.

The CBI had arrested Mahanta and two other railway officials on July 7, 2023 in connection with its probe in the Balasore triple train accident case in which 296 people were killed and over 1,200 injured.

The tragedy took place when the Coromandel Express crashed into a stationary freight train at Bahanaga Bazar station in Balasore district, and some of its derailed coaches collided with Yeshwantpur-Howrah Express, on June 2.

A special CBI court in Bhubaneswar recently rejected the bail application of Mahanta, noting that material submitted by the CBI prima facie shows his complicity in the case.

“The typical circuit diagram of another LC gate no. 79 was being used at the time of execution of wiring work being done at North Goomty of Bahanaga Bazar railway station, for changing the operation of level crossing gate no. 94 from 110 volt AC to 24 volt DC,” the CBI has submitted before the court.

It said as per the manual the present accused petitioner was to ensure that testing, overhauling and carrying out alterations to the existing signal and interlocking installations were in accordance with the approved plan and instructions.

“Further it reveals since no such steps were taken by the accused, it caused the accident and in the said accident more than 296 passengers were dead and many more passengers were seriously injured,” the court noted citing the CBI submissions.

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • Bahanaga Bazar
  • Balasore Train Accident
  • odisha

Related News

  • Hyderabad end Group D campaign with five-wicket win over Odisha

    Hyderabad end Group D campaign with five-wicket win over Odisha

  • Truck driver among two held for stealing iPhones from sealed vehicle

    Truck driver among two held for stealing iPhones from sealed vehicle

  • Telecom restoration underway in Cyclone Arnab-hit districts

    Telecom restoration underway in Cyclone Arnab-hit districts

  • Andhra, Odisha step up cyclone preparations as Arnab nears coast

    Andhra, Odisha step up cyclone preparations as Arnab nears coast

Latest News

  • Over 200 stakeholders from 13 sectors seek innovation-led growth in pre-Budget consultations

    4 minutes ago
  • Sensex, Nifty open lower after recent rally; IT shares drag

    19 minutes ago
  • Fire breaks out at Khairatabad GHMC Zonal Office

    26 minutes ago
  • Delhi AQI improves after overnight spike, haze persists

    1 hour ago
  • 2nd Test: India fight back with three wickets as New Zealand reach 131/4 at tea

    1 hour ago
  • Hyderabad rains end month-long dry spell, bring down temperatures

    1 hour ago
  • Rashmika Mandanna gives a glimpse of ‘what you’ll find her doing at home after work’

    2 hours ago
  • Trump tells US troops ‘victory at hand’ over Iran

    2 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App