Tuesday, Nov 3, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Hyderabad | Bjp Tweaked Rules To Gift Dharavi To Adani

BJP ‘tweaked’ rules to gift Dharavi to Adani

BJP government allegedly tweaked terms and conditions in the tendering process, and despite a break due to a change in government, managed to get back into power after engineering cracks in the Shiv Sena. Strangely, the Adani Group bagged the multi-crore Dharavi Redevelopment Project

By S. Sandeep Kumar
Published Date - 17 April 2023, 07:40 AM
BJP ‘tweaked’ rules to gift Dharavi to Adani
Dharavi, the biggest slum in Asia, is one of the most densely populated areas in the world.
whatsapp facebook twitter telegram

Hyderabad: When the Bharatiya Janata Party is in power at the Centre, the sky’s the limit for Adani. Even as details of the BJP government planning to hand over several precious public sector units across the country to the Adani Group, with parties including the Bharat Rashtra Samithi citing instances like the Bailadila and the Visakhapatnam Steel Plant, here is more.

According to information available from various sources and reports, the BJP government allegedly tweaked terms and conditions in the tendering process, and despite a break due to a change in government, managed to get back into power after engineering cracks in the Shiv Sena. Strangely, the Adani Group bagged the multi-crore Dharavi Redevelopment Project (DRP), one of the biggest real estate projects in the country that is being projected as slum redevelopment.

Also Read

  • Gujarat purchases power at higher price from Adani
  • Modani Files: Pending CBI case proves shady Chinese links of Adani brothers

Here is the chronology of developments in the last few years which shows how new rules were incorporated into the terms and conditions for the tendering process, which enabled the Adani Group to secure the project.

It all began in 2018, when the then BJP government in Maharashtra led by Chief Minister Devendra Fadnavis mooted the DRP. Within a year, global tenders were floated. However, the UAE-based Seclink Technologies emerged as the highest bidder. According to the DRP, the company which bags the bid has to develop Dharavi, the biggest slum in Asia spread over 2.39 square km and one of the most densely populated areas in the world, and construct multi-stories buildings to house the slum dwellers. During the construction phase, the winning bidder has to provide temporary accommodation to the slum dwellers in a different place identified by the government.

In March 2019, DRP officials wrote to Seclink calling for a meeting to proceed further with the tender awarding process. In the meantime, the State government signed a pact with the Railway Land Development Authority (RLDA) to lease over 45 acres in the neighbouring Matunga and Dadar area for the temporary accommodation of the slum dwellers. And then came a break. The Central Election Commission announced general elections in May. Though the Model Code of Conduct does not apply to projects decided or launched earlier, for reasons better known to officials, the DRP tender award letter was put in cold storage.

And after the elections, there was a change of government with Uddhav Thackeray’s Shiv Sena taking over. The Thackeray government decided to cancel the 2018 Dharavi tender, based on the Attorney General’s recommendation. Challenging this, Seclink approached the court and sought a stay on the new tender.

Here comes the twist

As the entire project came to a standstill, a new game began in Mumbai’s political corridors. A faction of the Shiv Sena broke the SS-NCP-INC coalition and formed a new government with the BJP. Under the political pact, Fadnavis returned to the Cabinet, this time, as Deputy Chief Minister and more importantly, as the Urban Development Minister, under whose Ministry the DRP was. Much happened backstage apparently, and when fresh tenders for the DRP were floated in September 2022, the terms and conditions saw quite a number of tweaks.

For instance, the technical expertise norm in 2022 was that the bidder should have built six million square feet in the last seven years. This was against the 2018 stipulation of 25 million square feet. Similarly, the net worth of the bidder was enhanced from Rs 10,000 crore in cash or equivalents to Rs 20,000 crore. While, a reduction in technical experience paved way for a smaller consortium to bid and qualify, the enhancement of net worth would filter many companies from bidding.

Among the three bids, the Adani Group, which quoted Rs 5,069 crore, emerged as the highest bidder. Adani Properties, which is Adani Group’s key real estate entity, gains a few benefits from this mega project. Of the estimated 70 million square feet of property on which the project is to be implemented, about 50 per cent can be sold in the open market. Only the balance has to be used for the rehabilitation of the original residents of Dharavi.

The current realty rates in Dharavi, which are around Rs 10,000 per sft, are set to definitely escalate as the DRP gains momentum, which means Adani stands to reap much more than what he invests for the entire project from the 50 per cent area that he can sell in the open market. However, post the Hindenburg Research bomb that hit Adani in multiple ways, it remains to be seen how he manages to go ahead with the project. In between, with Seclink Technologies alleging that the norms of the tender were modified with malafide intention, the Maharashtra government told the court that tender conditions were finalised considering the ‘overall circumstances of the DRP’ and claimed that the tendering process was fair and transparent.

Adani

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • Adani Group
  • BJP
  • Dharavi Redevelopment Project
  • Maharashtra

Related News

  • Elderly woman killed in leopard attack in Palghar; villagers threaten protest

    Elderly woman killed in leopard attack in Palghar; villagers threaten protest

  • Nitin Nabin set to lead BJP’s ‘Loktantra Bachao, Arajakta Hatao’ marches in Bihar and West Bengal

    Nitin Nabin set to lead BJP’s ‘Loktantra Bachao, Arajakta Hatao’ marches in Bihar and West Bengal

  • Tiger cub from Umred-Karhandla sighted in Maharashtra’s Pench, hints at corridor link

    Tiger cub from Umred-Karhandla sighted in Maharashtra’s Pench, hints at corridor link

  • BJP releases ‘Thago Ka Mela’ poster ahead of INDIA bloc’s Ramlila Maidan rally

    BJP releases ‘Thago Ka Mela’ poster ahead of INDIA bloc’s Ramlila Maidan rally

Latest News

  • Six injured as TGSRTC bus, mini-truck collide in Khammam

    29 minutes ago
  • BRS asks TGERC to reject 7,800 MW power procurement proposal

    35 minutes ago
  • KNRUHS invites applications for MD Homoeopathy admissions

    36 minutes ago
  • BRS-built pylon dismantled in Godavarikhani, tension prevails

    42 minutes ago
  • Voter enrolment for graduates’ constituencies closes on November 6

    46 minutes ago
  • KTR facilitates return of woman stranded in Muscat

    58 minutes ago
  • GITAM invites student innovators for Innovation Challenge 2026

    1 hour ago
  • Scientists, animal welfare groups demand withdrawal of Draft Animal Testing Rules

    1 hour ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App