Friday, Jul 10, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Business | Green Hydrogen Policy To Support Renewable Energy Capacity Addition

Green Hydrogen policy to support Renewable Energy capacity addition

New Delhi: ‘Green Hydrogen’ policy is expected to support the Renewable Energy (RE) capacity addition targets of the country. At present, ‘Green Hydrogen’ is produced through using renewable energy. On the other hand, ‘Gray Hydrogen’ which is the most commonly used is derived from fossil fuels. The ‘Green Hydrogen’ segment is becoming popular globally but […]

By IANS
Published Date - 12 March 2022, 01:55 PM
Green Hydrogen policy to support Renewable Energy capacity addition
Representational Image
whatsapp facebook twitter telegram

New Delhi: ‘Green Hydrogen’ policy is expected to support the Renewable Energy (RE) capacity addition targets of the country.

At present, ‘Green Hydrogen’ is produced through using renewable energy.


On the other hand, ‘Gray Hydrogen’ which is the most commonly used is derived from fossil fuels.

The ‘Green Hydrogen’ segment is becoming popular globally but cost of producing this gas remains high.

Currently, fertiliser and oil gas sectors use hydrogen, however, due to flexible uses and low emissions the gas is being touted as the ultimate solution for clean energy needs of long distance transportation and electricity generation.

In February, the Centre notified a “Green Hydrogen Policy” in line with its strong policy focus on renewable energy, a path of net zero energy transition by 2070.

According to ratings agency ICRA, under the base case scenario of delivered renewable cost of procurement at Rs 3.5 per unit, levellised cost of production for a Green Hydrogen’ is estimated to range between $5.5-6 per kg.

“For the co-located projects (Electrolyser and RE capacity at same location), such cost is estimated to decline by $0.5-1.0 per kg due to savings in intra-state open access charges.”

“Further, round-the-clock (RTC) procurement of renewable energy at cost competitive rate remains extremely critical for improvement in utilisation of electrolyser.”

Besides, the ratings agency said that viability of battery storage and availability of energy banking remains important.

“Even in a scenario of 30 per cent of hydrogen demand to be met through aGreen Hydrogen’ by 2030, incremental renewable (RE) capacity requirement is estimated to remain significant at about 60 GW,” said Girishkumar Kadam, Senior Vice President & Co-Group Head – Corporate ratings, ICRA.

“This is over and above the RE addition to meet all India energy requirements. From the industrial off-taker’s perspective, ‘Green Hydrogen’ is currently estimated to remain costlier by about $3.5-4 per kg against ‘Grey Hydrogen’. The cost competitiveness of ‘Green Hydrogen’ would remain contingent upon the reduction in capital cost and an improvement in the energy efficiency level of electrolyser, besides cost of RE procurement.”


Now you can get handpicked stories from Telangana Today on Telegram everyday. Click the link to subscribe.

Click to follow Telangana Today Facebook page and Twitter .


  • Follow Us :
  • Tags
  • Electricity
  • green hydrogen
  • ICRA
  • Renewable Energy (RE)

Related News

  • Gruha Lakshmi, Gruha Jyoti schemes will continue: Shivakumar

    Gruha Lakshmi, Gruha Jyoti schemes will continue: Shivakumar

  • Villagers lay siege to power substation protesting erratic supply of power in Adilabad

    Villagers lay siege to power substation protesting erratic supply of power in Adilabad

  • India should aim to achieve 100 pc ethanol blending: Nitin Gadkari

    India should aim to achieve 100 pc ethanol blending: Nitin Gadkari

  • Nuclear reactor owned by Fukushima plant operator TEPCO suspends hours-old restart

    Nuclear reactor owned by Fukushima plant operator TEPCO suspends hours-old restart

Latest News

  • Abhinandh PB, Bernadette Szocs lead Goa Challengers to winning start in UTT Season 7

    43 mins ago
  • FIFA WC 2026: Seventeen players risk semifinal suspension over yellow cards

    1 hour ago
  • Humpy, Divya and Vaishali to lead India’s challenge at 2026 Cairns Cup in Saint Louis

    1 hour ago
  • Shreyas Iyer’s unbeaten 80 lifts India to 158/7 against England in fourth T20I

    1 hour ago
  • Wimbledon 2026: Linda Noskova sets up all-Czech final against Karolina Muchova

    2 hours ago
  • MAUD sanctions Rs 77.31 crore to upgrade 404 traffic signals in Hyderabad

    2 hours ago
  • Anvita Khammam Aces beat Hyderabad E-Champions by 10 runs

    2 hours ago
  • Iran condemns US strikes on maritime infrastructure at IMO meet

    2 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam