Tuesday, Nov 24, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Mahsr Project Indias First Bullet Train Corridor Nears Completion

MAHSR project: India’s first bullet train corridor nears completion

India’s first bullet train corridor, the Mumbai–Ahmedabad High-Speed Rail (MAHSR), is nearing completion and will serve as a standardised model for future projects. Covering 508 km with 12 stations, the train will run at 320 kmph, cutting travel time to under two hours.

By IANS
Published Date - 4 July 2026, 12:20 AM
MAHSR project: India’s first bullet train corridor nears completion
India's 1st bullet train corridor nears completion; sets template for future rails (File Photo/IANS)
whatsapp facebook twitter telegram

New Delhi: India is nearing completion of its first bullet train corridor, the Mumbai–Ahmedabad High‑Speed Rail (MAHSR) project, which will provide a standardised template for upcoming bullet train corridors across the country, a statement said on Friday. 

MAHSR will connect Mumbai to Ahmedabad in about 1 hour 58 minutes and the corridor has a design speed of 350 kmph with an operational speed of 320 kmph supported by advanced rolling stock, signalling and train control systems.

Also Read

  • Capgemini shuts Bengaluru creche after abuse videos surface; Two nannies arrested

The corridor covers approximately 508 kilometres and includes 12 planned stations, and the first service is expected to run in August 2027 with the initial section opening between Surat and Vapi.

The Mumbai–Ahmedabad High-Speed Rail project is creating the knowledge, capabilities and industrial ecosystem needed for future expansion, the government said.

“It is establishing a scalable approach for future high-speed rail expansion. As new corridors are developed, this foundation will help enhance connectivity. It will also help reduce travel times and contribute to long-term economic growth,” the statement said.

Seven high-speed rail corridors, covering nearly 4,000 kilometres, have been identified for future development. The proposed network is expected to attract investments of around Rs 16 lakh crore.

Scaling upon a standardised template based on the MAHSR project, aims to implement proven engineering designs, construction methods, and operational practices. It will improve efficiency and accelerate project execution.

Unified designs, components, and maintenance procedures will simplify spare-part management, training, and procurement across the network. Foundations will be designed according to the exact soil characteristics of the spot and the remaining subsystems will follow common engineering standards.

“These include piers, viaducts, tracks, station structures, overhead electrification, and signalling systems. This approach will support faster construction across future corridors and will improve quality and reduce costs across future high-speed rail corridors,” the statement noted.

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • bullet train
  • MAHSR
  • Mumbai
  • Mumbai-Ahmedabad High Speed Rail

Related News

  • First high-speed rail service will commence in 2027: Vaishnaw on bullet train

    First high-speed rail service will commence in 2027: Vaishnaw on bullet train

  • Air India resumes non-stop New York flights, cuts travel time by five hours

    Air India resumes non-stop New York flights, cuts travel time by five hours

  • Mumbai local train passenger loses hand after alleged assault at Naigaon station

    Mumbai local train passenger loses hand after alleged assault at Naigaon station

  • Firecrackers linked to 137 of 142 Diwali fires in Mumbai

    Firecrackers linked to 137 of 142 Diwali fires in Mumbai

Latest News

  • Jaishankar meets German state leader to discuss India-EU ties

    9 minutes ago
  • Alliance Air to launch Silchar-Imphal flights by month-end

    20 minutes ago
  • Iran says Strait of Hormuz will remain closed until seven conditions are met

    1 hour ago
  • Five securities account for 72pc of G-Sec market liquidity, says RBI official

    1 hour ago
  • Jiiva’s Thagappan gets U/A 13+ certificate ahead of December 24 release

    1 hour ago
  • Cyberabad Moves 2026 to focus on smarter mobility and safer streets

    1 hour ago
  • Boy drowns in Godavari at Kaleshwaram

    1 hour ago
  • BRS, Left parties to lay siege to HMDA office over land auction

    1 hour ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App