Friday, Aug 14, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Mahsr Project Indias First Bullet Train Corridor Nears Completion

MAHSR project: India’s first bullet train corridor nears completion

India’s first bullet train corridor, the Mumbai–Ahmedabad High-Speed Rail (MAHSR), is nearing completion and will serve as a standardised model for future projects. Covering 508 km with 12 stations, the train will run at 320 kmph, cutting travel time to under two hours.

By IANS
Published Date - 4 July 2026, 12:20 AM
MAHSR project: India’s first bullet train corridor nears completion
India's 1st bullet train corridor nears completion; sets template for future rails (File Photo/IANS)
whatsapp facebook twitter telegram

New Delhi: India is nearing completion of its first bullet train corridor, the Mumbai–Ahmedabad High‑Speed Rail (MAHSR) project, which will provide a standardised template for upcoming bullet train corridors across the country, a statement said on Friday. 

MAHSR will connect Mumbai to Ahmedabad in about 1 hour 58 minutes and the corridor has a design speed of 350 kmph with an operational speed of 320 kmph supported by advanced rolling stock, signalling and train control systems.

Also Read

  • Capgemini shuts Bengaluru creche after abuse videos surface; Two nannies arrested

The corridor covers approximately 508 kilometres and includes 12 planned stations, and the first service is expected to run in August 2027 with the initial section opening between Surat and Vapi.

The Mumbai–Ahmedabad High-Speed Rail project is creating the knowledge, capabilities and industrial ecosystem needed for future expansion, the government said.

“It is establishing a scalable approach for future high-speed rail expansion. As new corridors are developed, this foundation will help enhance connectivity. It will also help reduce travel times and contribute to long-term economic growth,” the statement said.

Seven high-speed rail corridors, covering nearly 4,000 kilometres, have been identified for future development. The proposed network is expected to attract investments of around Rs 16 lakh crore.

Scaling upon a standardised template based on the MAHSR project, aims to implement proven engineering designs, construction methods, and operational practices. It will improve efficiency and accelerate project execution.

Unified designs, components, and maintenance procedures will simplify spare-part management, training, and procurement across the network. Foundations will be designed according to the exact soil characteristics of the spot and the remaining subsystems will follow common engineering standards.

“These include piers, viaducts, tracks, station structures, overhead electrification, and signalling systems. This approach will support faster construction across future corridors and will improve quality and reduce costs across future high-speed rail corridors,” the statement noted.

  • Follow Us :
  • Tags
  • bullet train
  • MAHSR
  • Mumbai
  • Mumbai-Ahmedabad High Speed Rail

Related News

  • Mumbai landslide: Seven killed, seven injured in Ghatkopar after heavy rain

    Mumbai landslide: Seven killed, seven injured in Ghatkopar after heavy rain

  • We have to come out of it: Shah calls for better RBI-UCB relationship

    We have to come out of it: Shah calls for better RBI-UCB relationship

  • Embrace technology, ensure transparency: Shah’s push to urban cooperative banks

    Embrace technology, ensure transparency: Shah’s push to urban cooperative banks

  • Avika Gor hospitalised with dengue, husband reveals health update

    Avika Gor hospitalised with dengue, husband reveals health update

Latest News

  • Amit Shah warns drug traffickers after Virender Basoya brought back from UAE

    2 minutes ago
  • Centre notifies 40 questions for Census 2027; caste, SC, ST status included

    8 minutes ago
  • Father and son electrocuted while irrigating paddy crop

    14 minutes ago
  • Vizhinjam to begin direct EXIM cargo operations from Aug 18: Shashi Tharoor

    15 minutes ago
  • Mom-to-be Samantha Ruth Prabhu reveals having a ‘mini breakdown’, realises her clothes don’t fit anymore

    20 minutes ago
  • After evicting poor, Congress plans revenue generation from Hyderabad’s vending spaces

    22 minutes ago
  • Sensex, Nifty fall in early trade as crude, FII selling weigh

    27 minutes ago
  • ED conducts raids in homebuyers ‘fraud’ case

    39 minutes ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam