Thursday, Sep 24, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Mahsr Project Indias First Bullet Train Corridor Nears Completion

MAHSR project: India’s first bullet train corridor nears completion

India’s first bullet train corridor, the Mumbai–Ahmedabad High-Speed Rail (MAHSR), is nearing completion and will serve as a standardised model for future projects. Covering 508 km with 12 stations, the train will run at 320 kmph, cutting travel time to under two hours.

By IANS
Published Date - 4 July 2026, 12:20 AM
MAHSR project: India’s first bullet train corridor nears completion
India's 1st bullet train corridor nears completion; sets template for future rails (File Photo/IANS)
whatsapp facebook twitter telegram

New Delhi: India is nearing completion of its first bullet train corridor, the Mumbai–Ahmedabad High‑Speed Rail (MAHSR) project, which will provide a standardised template for upcoming bullet train corridors across the country, a statement said on Friday. 

MAHSR will connect Mumbai to Ahmedabad in about 1 hour 58 minutes and the corridor has a design speed of 350 kmph with an operational speed of 320 kmph supported by advanced rolling stock, signalling and train control systems.

Also Read

  • Capgemini shuts Bengaluru creche after abuse videos surface; Two nannies arrested

The corridor covers approximately 508 kilometres and includes 12 planned stations, and the first service is expected to run in August 2027 with the initial section opening between Surat and Vapi.

The Mumbai–Ahmedabad High-Speed Rail project is creating the knowledge, capabilities and industrial ecosystem needed for future expansion, the government said.

“It is establishing a scalable approach for future high-speed rail expansion. As new corridors are developed, this foundation will help enhance connectivity. It will also help reduce travel times and contribute to long-term economic growth,” the statement said.

Seven high-speed rail corridors, covering nearly 4,000 kilometres, have been identified for future development. The proposed network is expected to attract investments of around Rs 16 lakh crore.

Scaling upon a standardised template based on the MAHSR project, aims to implement proven engineering designs, construction methods, and operational practices. It will improve efficiency and accelerate project execution.

Unified designs, components, and maintenance procedures will simplify spare-part management, training, and procurement across the network. Foundations will be designed according to the exact soil characteristics of the spot and the remaining subsystems will follow common engineering standards.

“These include piers, viaducts, tracks, station structures, overhead electrification, and signalling systems. This approach will support faster construction across future corridors and will improve quality and reduce costs across future high-speed rail corridors,” the statement noted.

  • Follow Us :
  • Tags
  • bullet train
  • MAHSR
  • Mumbai
  • Mumbai-Ahmedabad High Speed Rail

Related News

  • IIT Bombay sets up committee to examine circumstances surrounding student’s death

    IIT Bombay sets up committee to examine circumstances surrounding student’s death

  • Bombay HC calls for restraint, bans firecrackers on public roads

    Bombay HC calls for restraint, bans firecrackers on public roads

  • Kartik Aaryan visits Statue of Unity ahead of National Film Awards

    Kartik Aaryan visits Statue of Unity ahead of National Film Awards

  • Mumbai pandal electrocution: Two killed, four injured in Kalachowki

    Mumbai pandal electrocution: Two killed, four injured in Kalachowki

Latest News

  • Anantjeet, Parinaaz win historic Asian Games skeet mixed-team bronze

    1 minute ago
  • Exercise Yudh Abhyas: US envoy Gor arrives in Rajasthan

    21 minutes ago
  • Maruti Suzuki India commissions green hydrogen plant at Manesar

    24 minutes ago
  • SI, driver injured in a road accident in Khammam’s Tirumalayapalem

    24 minutes ago
  • Akshay Kumar’s son Aarav makes rare appearance at airport

    35 minutes ago
  • Telangana govt forms panel to probe lands owned by BRS leaders, associates

    40 minutes ago
  • AAP alleges Centre misusing agencies ahead of assembly polls amid ED searches in Punjab

    58 minutes ago
  • Supreme Court upholds Danam Nagender’s disqualification as MLA

    1 hour ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App