Monday, Jun 22, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | News | Pm Modi To Dedicate Ntpcs Floating Solar Plant On Saturday

PM Modi to dedicate NTPC’s floating solar plant on Saturday

Peddapalli: Stage is all set to dedicate to the nation the 100 MW Floating Solar PV Project of NTPC-Ramagundam at Ramagundam on Saturday. Prime Minister Narendra Modi will dedicate the project to the nation through virtual mode from New Delhi at 12 noon. The country’s biggest floating solar PV project was declared commercially operational from […]

By Telangana Today
Published Date - 29 July 2022, 12:34 PM
PM Modi to dedicate NTPC’s floating solar plant on Saturday
whatsapp facebook twitter telegram

Peddapalli: Stage is all set to dedicate to the nation the 100 MW Floating Solar PV Project of NTPC-Ramagundam at Ramagundam on Saturday.

Prime Minister Narendra Modi will dedicate the project to the nation through virtual mode from New Delhi at 12 noon.


The country’s biggest floating solar PV project was declared commercially operational from midnight on July 1, this year by completing 20 MW of final part capacity.

Largest in the segment in the country, the 100-MW Floating Solar project at Ramagundam is endowed with advanced technology as well as environment friendly features. Constructed with financial implication of Rs 423 crores through BHEL as EPC (Engineering, Procurement and Construction) contract, the project spreads over 500 acres of its reservoir.

Divided into 40 blocks, each having 2.5 MW. Each block consists of one floating platform and an array of 11,200 solar modules. The floating platform consists of one Inverter, Transformer, and a HT breaker. The solar modules are placed on floaters manufactured with HDPE (High Density Polyethylene) material.

The entire floating system is being anchored through special HMPE (High Modulus Polyethylene) rope to the dead weights placed in the balancing reservoir bed. The power is being evacuated up to the existing switch yard through 33KV underground cables. This project is unique in the sense that all the electrical equipment including inverter, transformer, HT panel and SCADA (Supervisory Control and Data Acquisition) are also on floating ferro cement platforms. The anchoring of this system is bottom anchoring through dead weight concrete blocks.

From an environmental point of view, the most obvious advantage is minimum land requirement mostly for associated evacuation arrangements. Further, with the presence of floating solar panels, the evaporation rate from water bodies is reduced, thus helping in water conservation.

Approximately 32.5 lakh cubic meters per year of water evaporation can be avoided. The water body underneath the solar modules helps in maintaining their ambient temperature, thereby improving their efficiency and generation. Similarly, while coal consumption can be avoided of 1,65,000 tons per year, Co2 of 2,10,000 tons per year can be avoided.

  • Follow Us :
  • Tags
  • BHEL
  • Prime Minister Narendra Modi
  • Solar PV project

Related News

  • Editorial: Deepening French friendship

    Editorial: Deepening French friendship

  • BHEL shares rise after securing Rs 21,000 crore Meja power project order

    BHEL shares rise after securing Rs 21,000 crore Meja power project order

  • Fire accident at Yadadri thermal power plant: BHEL says no major damage

    Fire accident at Yadadri thermal power plant: BHEL says no major damage

  • Power outages disrupt Manjeera water supply in Hyderabad

    Power outages disrupt Manjeera water supply in Hyderabad

Latest News

  • Harish Rao seeks probe into Bhupalpally DTO’s death

    19 mins ago
  • Rare Buddha Parinirvana sculpture unearthed in Adilabad village

    42 mins ago
  • Kiran Abbavaram’s ‘Chennai Love Story’ set for worldwide release on July 24

    55 mins ago
  • Allu Arjun skips Sandhya Theatre stampede case hearing

    56 mins ago
  • FIFA WC 2026: Neymar returns to full training as Brazil eye knockout berth

    1 hour ago
  • CarCall offers QR code solution to parking hassles and roadside emergencies

    2 hours ago
  • Coal tipper mows down Bhupalpally DTO Venkanna in front of his office

    2 hours ago
  • RGUKT-Basar prohibits mobile phones in classrooms, libraries, messes

    2 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam