Monday, May 11, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Telangana | Telangana Flood Flows Into Jurala And Sunkesula On The Rise

Telangana: Flood flows into Jurala and Sunkesula on the rise

With the flood flow on the rise from the upper reaches of Krishna and Tungabhadra rivers, under the influence of torrential rains in Karnataka and Maharashtra, the Jurala project in the State has been receiving heavy inflows

By Telangana Today
Updated On - 30 May 2025, 11:30 AM
Telangana: Flood flows into Jurala and Sunkesula on the rise
whatsapp facebook twitter telegram

Hyderabad: Torrential rains in the upstream States have triggered significant flooding in Mahabubnagar district, with the Priyadarshini Jurala Project and Sunkesula Barrage grappling with rising water levels.

With the flood flow on the rise from the upper reaches of Krishna and Tungabhadra rivers, under the influence of torrential rains in Karnataka and Maharashtra, the Jurala project in the State has been receiving heavy inflows. The project is currently receiving close to one lakh cusecs, a flood volume that could help add by nine TMCs of water a day.


As many as 12 gates of Jurala have been lifted letting off the flood flows. The outflow stands at 88,835 cusecs as against an inflow of 97,000 cusecs.

The reservoir’s water level is at 317.550 metres, just below its full reservoir level (FRL) of 318.516 metres. With a total storage capacity of 9.657 TMC, the project currently holds 7.740 TMC of water. Amid the flood management efforts, four units of the Jurala Hydroelectric Project are generating 156 megawatts of electricity.

Further downstream, in Jogulamba Gadwal district, the Sunkesula barrage on the Tungabhadra is also the first flood inflow for the season. The barrage is receiving 8,983 cusecs of water from upstream sources, with an equal outflow of 8,983 cusecs as project authorities have lifted two gates to release floodwater into the Tungabhadra River. The current water level at Sunkesula is 291.80 metres (957.35 feet), with a storage capacity of 1.235 TMC.

The heavy rainfall in upstream States, particularly Karnataka, has led to a rare flood event for May, with the Jurala Project witnessing such high inflows for the first time in 18 years during this month. Authorities are closely monitoring the situation, and flood alerts have been issued for villages along the Krishna and Tungabhadra rivers in Mahbubnagar and Kurnool districts.

  • Follow Us :
  • Tags
  • Flood inflows
  • Mahabubnagar
  • Priyadarshini Jurala Project
  • Sunkesula barrage

Related News

  • Laxma Reddy slams Congress over maize transport delays, farmers protest in Mahabubnagar

    Laxma Reddy slams Congress over maize transport delays, farmers protest in Mahabubnagar

  • ASHA workers protest on highway in Mahabubnagar

    ASHA workers protest on highway in Mahabubnagar

  • TG EAPCET 2026: JNTU-Hyderabad freezes test zones in five districts

    TG EAPCET 2026: JNTU-Hyderabad freezes test zones in five districts

  • Change in ballot serial numbers triggers tension in Mahabubnagar division 45

    Change in ballot serial numbers triggers tension in Mahabubnagar division 45

Latest News

  • GHMC organises walkathon to promote public participation in Census 2027

    1 min ago
  • India successfully tests Agni-5 missile with MIRV technology

    10 mins ago
  • IPL 2026: When and where to watch GT vs SRH, know all details

    11 mins ago
  • Hyderabad murder case exposes organised domestic help gangs with Nepal links

    21 mins ago
  • NTA says NEET UG 2026 held under full security protocol

    22 mins ago
  • Hong Kong-based Crown Worldwide Group launches new facility in Coimbatore

    23 mins ago
  • FSSAI sets new standards for Hyderabadi Haleem

    26 mins ago
  • Bank of Baroda targets 10 per cent corporate loan growth in FY27

    31 mins ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam