Sunday, May 17, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Hyderabad | Fire Accident At Yadadri Thermal Power Plant Bhel Says No Major Damage

Fire accident at Yadadri thermal power plant: BHEL says no major damage

BHEL completed the Commercial Operation Declaration and trial operation of Unit 3 at the TGGENCO Yadadri Thermal Power Project, taking synchronised capacity to 3,200 MW. A localised fire later broke out during stabilisation procedures, but no injuries or major damage were reported

By T.Karnakar Reddy
Published Date - 17 May 2026, 11:24 PM
Fire accident at Yadadri thermal power plant: BHEL says no major damage
whatsapp facebook twitter telegram

Hyderabad: Bharat Heavy Electricals Limited (BHEL) has completed the Commercial Operation Declaration (COD) and trial operation of Unit 3 of the TGGENCO Yadadri Thermal Power Project (5×800 MW). This has taken the total synchronised grid capacity to 3,200 MW.

While Unit 3 was undergoing standard post-COD stabilisation procedures under BHEL’s technical supervision on Sunday, a localised fire broke out in the turbine-driven boiler feed pump (TDBFP-A) area. The unit was hand-tripped as an immediate safety precaution in accordance with operating protocols.


The plant activated its emergency response system. Internal fire safety teams, supported by plant fire services, brought the fire under control. There were no injuries or casualties in the incident. Preliminary assessments indicated no major equipment damage.

The BHEL technical teams at the site were evaluating the area to determine the exact extent of the damage. Remedial and restoration work will commence immediately. BHEL will restore the unit to full service at the earliest possible time.

In a press statement, BHEL said it remains committed to the safe execution of the Yadadri project to strengthen Telangana’s power infrastructure.

  • Follow Us :
  • Tags
  • BHEL
  • TGGenco
  • Unit 3 COD
  • Yadadri Thermal Power Project

Related News

  • Power outages disrupt Manjeera water supply in Hyderabad

    Power outages disrupt Manjeera water supply in Hyderabad

  • Civet cat run over by vehicle in Hyderabad outskirts

    Civet cat run over by vehicle in Hyderabad outskirts

  • Power employees JAC to stage protest over untimely transfers

    Power employees JAC to stage protest over untimely transfers

  • HYDRAA asks BHEL not to obstruct Rayasamudram Cheruvu works

    HYDRAA asks BHEL not to obstruct Rayasamudram Cheruvu works

Latest News

  • Fire accident at Yadadri thermal power plant: BHEL says no major damage

    12 seconds ago
  • Royal Challengers Bengaluru clinch IPL playoffs spot with 23-run win over Punjab Kings

    2 mins ago
  • KTR recalls ‘Karimnagar Simha Garjana’ on 25th anniversary

    8 mins ago
  • Panchayat secretary suspended for misutilisation of public money in Asifabad

    11 mins ago
  • Amaravati Quantum Valley building world-class quantum ecosystem: Chandrababu Naidu

    17 mins ago
  • RPF Central Railway reunites 584 children and adults, saves 25 lives under special operations

    1 hour ago
  • GRSE to launch first next generation offshore patrol vessel for Indian Navy on May 20

    1 hour ago
  • Hyderabad Cricket Association to hold open selection trials from May 21

    2 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam