Thursday, Apr 23, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | India | Tripura Continues Power Supply To Bangladesh Despite Record Durga Puja Demand

Tripura continues power supply to Bangladesh despite record Durga Puja demand

Tripura Power Minister Ratan Lal Nath said the state is supplying 44–45 MW of electricity to Bangladesh during Durga Puja, despite local demand rising to 380 MW. Mizoram is also supplying 40 MW to Tripura to meet festive need

By IANS
Published Date - 29 September 2025, 03:52 PM
Tripura continues power supply to Bangladesh despite record Durga Puja demand
whatsapp facebook twitter telegram

Agartala: Tripura is supplying 44-45 MW of electricity to Bangladesh during the five-day Durga Puja festivities, as per a previous agreement, to help the neighbouring country maintain an uninterrupted power supply, the state’s Power Minister, Ratan Lal Nath, said on Monday.

The Minister said that from the Central and state sources, the State has arranged 380 MW of electricity to meet the huge demand for power during the five-day Durga Puja period.


“Taking huge efforts, we have arranged 380 MW of electricity to meet the rising demand of electricity in the festive season. Mizoram will supply 40 MW of electricity during the Durga Puja in Tripura, and we will return a similar amount of electricity to the neighbouring state during Christmas,” Nath said.

He said that despite the huge demand for electricity in Tripura during Durga Puja and the hectic efforts to manage 380 MW of power, the State “maintained the supply of electricity to Bangladesh to ensure uninterrupted power during the Puja celebrations there.

According to a report by the Bangladesh newspaper ‘Prothom Alo’, Durga Puja will be celebrated in 33,355 mandaps and temples across the country this year, up from 31,461 last year. Tripura started supplying 100 MW of power to Bangladesh from the State-owned ONGC Tripura Power Company (OTPC) power plant in southern Tripura in March 2016.

An official said that Bangladesh owes a huge amount to Tripura State Electricity Corporation Limited (TSECL) in unpaid electricity bills. Power Minister Nath informed that during Durga Puja in 2022, the electricity demand in peak hour was 332 MW, in 2023 it was 311 MW, in 2024 it was 312 MW, and this year the expectation is around 380 MW.

“Last year, around 3,500 pujas were organised across Tripura. This year, 3,500 applications have been received from the Puja organisers. Special control rooms have been set up for Durga Puja at both Division and Sub-Division levels,” he added.

Nath, who also holds the Agriculture portfolio, said that State Load Dispatch Centre, Tripura State Electricity Corporation Limited (TSECL), and Tripura Power Transmission Limited (TPTL) have taken a series of efforts to ensure uninterrupted power supply during the Durga Puja days.

  • Follow Us :
  • Tags
  • Bangladesh
  • cross-border cooperation
  • Durga Puja
  • electricity supply

Related News

  • Former Union minister Dinesh Trivedi expected to be India’s next High Commissioner to Bangladesh

    Former Union minister Dinesh Trivedi expected to be India’s next High Commissioner to Bangladesh

  • Bangladesh adviser warns IMF conditions may hurt growth

    Bangladesh adviser warns IMF conditions may hurt growth

  • ‘Friendship Pipeline’: India sends 5,000 tonnes diesel to Bangladesh​

    ‘Friendship Pipeline’: India sends 5,000 tonnes diesel to Bangladesh​

  • Boat carrying 250 people, including Rohingya and Bangladeshis, sinks in Andaman Sea

    Boat carrying 250 people, including Rohingya and Bangladeshis, sinks in Andaman Sea

Latest News

  • Warangal RTC driver succumbs to burns as TGSRTC strike enters second day

    12 mins ago
  • Mamata Banerjee claims TMC ahead after Phase 1 polling in Bengal

    22 mins ago
  • Opinion: The 2026 IT rules quietly threaten India’s democratic voice

    33 mins ago
  • Telangana govt to press CBI for Kaleshwaram probe; CM, Uttam to meet Director

    50 mins ago
  • Miryalguda driver attempts self-immolation at Nalgonda RTC depot

    59 mins ago
  • RTC driver suffers 80 percent burns in Warangal suicide bid, shifted to Hyderabad

    1 hour ago
  • Rs.10.55 lakh fines imposed for mobile phone and siren misuse in Malkajgiri

    1 hour ago
  • Scooter owner booked for tampering number plate by Abid Road police

    1 hour ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

.