Sunday, Oct 18, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | News | Zojila Tunnel Achieves Breakthrough Bringing Kashmir Ladakh All Weather Link Closer

Zojila tunnel achieves breakthrough, bringing Kashmir-Ladakh all-weather link closer

The strategically important Zojila Tunnel achieved a major breakthrough after the final 2.5 metres were blasted through, connecting its two ends. The project will provide year-round connectivity between Kashmir and Ladakh, reducing travel time from over an hour to just 15 minutes

By PTI
Published Date - 9 June 2026, 04:49 PM
Zojila tunnel achieves breakthrough, bringing Kashmir-Ladakh all-weather link closer
whatsapp facebook twitter telegram

Minimarg (Ladakh): The Zojila tunnel connecting the Kashmir Valley to Ladakh took a crucial step towards completion on Tuesday with a blast breaking through the last 2.5 metres of the high-altitude infrastructure project that cuts through the Himalayas.

With this, the two ends of the world’s longest single-tube bi-directional bypass, which will cut travel time from 1.5 hours to 15 minutes, have now been connected, officials said.


“Breakthrough in the 2.5 metre distance in the tunnel has been successfully achieved,” an official said. The breakthrough has brought the decades-old dream of all-weather connectivity between the Kashmir Valley and Ladakh closer to reality.

Union Minister for Road Transport and Highways Nitin Gadkari pressed the remote button, blasting the breakthrough site near the East Portal of the tunnel at Minimarg in Ladakh Union Territory, they said.

Jammu and Kashmir Lieutenant Governor Manoj Sinha and Chief Minister Omar Abdullah were also present. Officials of the National Highways & Infrastructure Development Corporation Limited (NHIDCL) said the breakthrough is six months ahead of schedule.

As of now, about 85 per cent of the total work has been completed, Authority Engineer for the project, Yousef Es’haghpour Rahimabadi, told PTI here.

The tunnel is likely to be thrown open to the public in February 2028, the officials said, adding that after the breakthrough, the civil works will take another 7-8 months and then the electrical works will begin.

The tunnel — 9.5 metre wide, 7.57 metre high, 13.153 km long — is a horseshoe-shaped single-tube, a two-lane road tunnel built at the height of around 11,578 feet above sea level.

The geostrategically important tunnel on the Srinagar-Leh National Highway will provide year-round, all-weather connectivity to Ladakh, reducing the travel time from 1-1.5 hours to 15 minutes, officials said.

The tunnel from Baltal in the Ganderbal district of central Kashmir to Minimarg in Drass district of the Union Territory of Ladakh has an 18-km approach road.

Megha Engineering and Infrastructure Limited (MEIL), the agency executing the project, used the New Austrian Tunnelling Method (NATM) to pierce through the Himalayas and navigate the fragile geology. The entire project is 31 km long, including the approach road and bridges, stretching from Sonmarg to Minimarg. Once operational, the tunnel would enhance both civilian and military mobility across the treacherous Zojila Pass that is usually rendered shut for traffic for three winter months due to heavy snowfall.

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • all-weather connectivity
  • Kashmir Valley
  • Ladakh
  • NHIDCL

Related News

  • Hina Khan reveals ‘she bled through nose every day’ during Ladakh trip

    Hina Khan reveals ‘she bled through nose every day’ during Ladakh trip

  • Gandhi Jayanti: Yogi Adityanath, Nitin Gadkari pay tribute to Mahatma Gandhi

    Gandhi Jayanti: Yogi Adityanath, Nitin Gadkari pay tribute to Mahatma Gandhi

  • Shutdown in Ladakh as Wangchuk seeks release of inquiry report

    Shutdown in Ladakh as Wangchuk seeks release of inquiry report

  • Centre notifies appointment of 14 judicial officers as judges in four High Courts

    Centre notifies appointment of 14 judicial officers as judges in four High Courts

Latest News

  • MMC, ASCI sign MoU to strengthen scientific solid waste management

    4 hours ago
  • Osmania University declares PG examination results for four faculties

    4 hours ago
  • Two youths drown in Kinnerasani canal in Kothagudem district

    4 hours ago
  • GHMC cancels Prajavani programme on October 19

    4 hours ago
  • Five arrested for robbing Rs 25 lakh during USDT cryptocurrency deal in Hyderabad

    4 hours ago
  • Rewind: UPI gets a price, and a pause

    4 hours ago
  • MLRIT celebrates Bathukamma with traditional dances, cultural programmes

    5 hours ago
  • 17 dead, 25 others injured in stampede at Kolkata Durga puja pandal

    5 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App