Sunday, Nov 29, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Telangana | Ntpc Accords Investment Approval To Ramagundam Phase Ii Thermal Project

NTPC accords investment approval to Ramagundam Phase-II thermal project

The National Thermal Power Corporation (NTPC) board on Tuesday accorded investment approval for the project at an appraised current estimated cost of Rs.29,344.85 crore

By Telangana Today
Published Date - 6 November 2024, 03:39 PM
NTPC accords investment approval to Ramagundam Phase-II thermal project
whatsapp facebook twitter telegram

Hyderabad: Even as the State government reportedly decided against signing the power purchase agreement (PPA) for Telangana Super Thermal Power Project, Phase-II (3×800 MW), Ramagundam, the National Thermal Power Corporation (NTPC) board on Tuesday accorded investment approval for the project at an appraised current estimated cost of Rs.29,344.85 crore.

The NTPC board of directors have also announced the construction of the Gadarwara Super Thermal Power Project Stage-II (2×800 MW), at an estimated cost of Rs.20,445.69 crore, and the Nabinagar Super Thermal Power Project Stage-II (3×800 MW) at an appraised current estimated cost of Rs.29,947.91 crore, along with the Telangana thermal project.


The State government has reportedly decided against signing the PPA for NTPC-Ramagundam Phase-2, citing projected power costs which could burden the consumers. Instead, the government was planning to develop green energy sources such as solar, hydel and wind, which are expected to offer more cost-effective alternatives to the power from NTPC-Ramagundam.

A few months ago, the NTPC wrote to the State government asking it to sign the PPA for NTPC Phase-2, failure to do so may result in the allocation of NTPC Phase-2 power to other Southern States, it had said. The NTPC had completed installation of 1,600 MW and sought permission for capacity addition of 2,400 MW more in line with the provisions of the Andhra Pradesh Reorganisation Act — for setting up a 4,000 MW plant in Telangana.

The first phase (2X800MW) of the project was dedicated to the nation by Prime Minister Narendra Modi last October. The State is slated to get 85 percent of the total 4,000 MW power capacity. Phase-I of the project was established at an approved cost of Rs.10,998 crore.

Currently, power costs stand at Rs.5.90 per unit, but upon Phase-2 completion, it could soar to Rs.8 to Rs.9 per unit, surpassing open market rates of Rs.2 to Rs.4 per unit, they added. In such a scenario, purchasing power at a higher rate from NTPC would push the Discoms into further losses, the sources opined.

If a PPA is signed with NTPC for 25 years, it could increase the burden on people living in the State, the sources mentioned, adding that it was the reason why the government has decided against signing the PPA. Instead, the government is exploring other options, including sources where power would be available at a lower price, the sources mentioned.eom

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • Hyderabad
  • National Thermal Power Corporation
  • NTPC
  • NTPC-Ramagundam

Related News

  • London-style Christmas theme planned for Hyderabad shopping exhibition

    London-style Christmas theme planned for Hyderabad shopping exhibition

  • 275 grams of gold missing from joint SBI locker in Masab Tank

    275 grams of gold missing from joint SBI locker in Masab Tank

  • Hyderabad traffic police book 458 motorists in drunk driving crackdown

    Hyderabad traffic police book 458 motorists in drunk driving crackdown

  • Loyola Academy to organise two-day international conference in Hyderabad

    Loyola Academy to organise two-day international conference in Hyderabad

Latest News

  • Yashoda Hospitals hosts national oncology conference in Hyderabad

    3 minutes ago
  • YMCA Secunderabad beat Titans 86-72 in GM Sampath Kumar basketball league

    25 minutes ago
  • Hyderabad register emphatic 217-run victory in Cooch Behar Trophy

    4 minutes ago
  • 9,459 students participate in EThames TeenCEO Challenge 2026

    1 minute ago
  • Hyderabad wakes up to chilly morning as temperatures dip across Telangana

    56 minutes ago
  • EV Narasimha Reddy assumes charge as HMDA Metropolitan Commissioner

    1 hour ago
  • Secunderabad residents flag traffic hazards, unsafe footpaths and civic neglect

    1 hour ago
  • Two die of electrocution while erecting tent in Medchal

    1 hour ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App