Sunday, Oct 18, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Telangana | Congress Govt Pushes For Elevated Road In Amrabad Forest

Congress govt pushes for elevated road in Amrabad forest

Now, the R&B department is planning to construct an elevated corridor on the route to facilitate smooth flow of traffic. The elevated corridor is being proposed from Brahmanpally to Domalpenta covering about 42 km.

By S. Sandeep Kumar
Updated On - 23 November 2024, 11:01 PM
Congress govt pushes for elevated road in Amrabad forest
whatsapp facebook twitter telegram

Hyderabad: Despite the State Board for Wildlife rejecting an earlier proposal, the Roads and Buildings department is now proposing a new elevated road project from Mannanur to Domalpenta through the Amrabad Tiger Reserve (ATR) limits. With the tiger population increasing in ATR limits, there are apprehensions that the project could cast an adverse impact on their movement.With vehicular traffic towards Srisailam increasing considerably and also the time being taken to pass through the ghat section going up, the R&B department in the past had proposed to widen the existing road from Mannanur to Domalpenta. However, considering the impact on wildlife and destruction of biodiversity, the State Board for Wildlife had rejected the proposal, said a forest official.

Now, the R&B department is planning to construct an elevated corridor on the route to facilitate smooth flow of traffic. The elevated corridor is being proposed from Brahmanpally to Domalpenta covering about 42 km.


During a press conference at the Secretariat, R&B Minister Komatireddy Venkat Reddy said the elevated corridor project on the Srisailam road was discussed with union Minister of Road Transport and Highways Nitin Gadkari. Accordingly, the NHAI was directed to prepare Detailed Project Report (DPR) with single pillar corridor covering 62 km. The estimated cost of the project was Rs.7,000 crore and as ATR was a reserved forest area, widening the existing road was ruled out, he said.

“The DPR will be prepared in a year. Once it is sanctioned, the journey towards Rayalaseema from Hyderabad will be cut down and it will be convenient for devotees heading to Srisailam as well,” Komatireddy Venkat Reddy said.

Initially, the department had proposed conventional concrete bridge construction as part of the elevated corridor. But the forest department as a means to expedite the project is insisting on installation of precast steel bridge blocks. After the final DPR is prepared, it would be sent for National Board for Wildlife for approval. Post the approval, the NHAI and R&B would be permitted to commence the works, the forest official said.

On the adverse impact of the proposed project on wildlife, especially tiger population, the forest official said initially for about three to four years, there would definitely be disturbance. But once the elevated corridor comes into operation, the wildlife movement would be comfortable and there would not be any accidents, the official defended the government’s move.

The Andhra Pradesh government is also planning to construct a cable bridge in their limits to avoid any disturbance to the wildlife and ensure free flow of traffic.

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • Amrabad forest
  • Amrabad Tiger Reserve
  • ATR
  • Domalpenta

Related News

  • Domestic worker suspected in Jubilee Hills murder detained with three others

    Domestic worker suspected in Jubilee Hills murder detained with three others

  • Two siblings die after car rams Activa scooter in Hayathnagar

    Two siblings die after car rams Activa scooter in Hayathnagar

  • HMWSSB fines Jubilee Hills pub Rs 20,000 for water misuse

    HMWSSB fines Jubilee Hills pub Rs 20,000 for water misuse

  • Hyderabad: Woman allegedly sexually assaulted after offer of domestic work

    Hyderabad: Woman allegedly sexually assaulted after offer of domestic work

Latest News

  • Hyderabad water supply: HMWSSB plans 10 MGD Manjeera cut from December

    6 minutes ago
  • Jagan calls for changes to Election Commissioner appointment law

    8 minutes ago
  • DP World links India Championship and Tour partnerships through 2035

    12 minutes ago
  • BRS Minority Cell demands clearance of pending Kalyana Lakshmi and Shaadi Mubarak applications

    16 minutes ago
  • Nelson Dilipkumar shares picture with Rajinikanth as Jailer 2 wins praise

    24 minutes ago
  • BRS serves legal notices on Velugu over KCR-farmhouse report

    21 minutes ago
  • Brace for alternate-day drinking water supply as Telangana crisis deepens

    28 minutes ago
  • TTD gardens get AI boost in proposed maintenance plan

    23 minutes ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App