Thursday, Jun 8, 2023
English News
  • Hyderabad
  • Telangana
  • Andhra Pradesh
  • India
  • World
  • Entertainment
  • Science and Tech
  • Sport
  • Business
  • ...
    • NRI
    • View Point
    • cartoon
    • Columns
    • Reviews
    • Education Today
    • Property
    • Videos
    • Lifestyle
    • Rewind
E-Paper
  • NRI
  • View Point
  • cartoon
  • Columns
  • Reviews
  • Education Today
  • Property
  • Videos
  • Lifestyle
  • Rewind
Home | Tech | Countdown For Isro Rocket Launch Progressing Smoothly

Countdown for ISRO rocket launch progressing smoothly

According to Indian Space Research Organisation (ISRO), the filling of fuel and oxidizer for the second stage of the rocket has been completed.

By IANS
Updated On - 03:56 PM, Thu - 17 December 20
Countdown for ISRO rocket launch progressing smoothly
whatsapp facebook twitter telegram

Chennai: The Indian space agency is gearing up for the year’s last space mission, orbiting communication satellite CMS-01 (formerly GSAT-12R) on Thursday at 3.41 p.m. with its rocket PSLV-C50.

According to Indian Space Research Organisation (ISRO), the filling of fuel and oxidizer for the second stage of the rocket has been completed.

The countdown for the launch is progressing smoothly at the Sriharikota rocket port in Andhra Pradesh.

The 44-metre-high four staged/engine PSLV-C50 is the 22nd flight of PSLV in ‘XL’ configuration (with six strap-on motors hugging the first stage).

The PSLV in normal configuration is a four stage/engine expendable rocket powered by solid and liquid fuels alternatively with six booster motors strapped on to the first stage to give higher thrust during the initial flight moments.

The Indian space agency has PSLV variants with two and four strap-on motors, larger PSLV-XL and the Core Alone variant without any strap-on motors.

The choice of the rocket to be used for a mission depends on the weight of the satellite and the orbit where the satellite it is to be orbited.

According to ISRO, the PSLV-C50 rocket carrying CMS-01 is tentatively scheduled to blast off at 3.41 p.m. from the second launch pad at the rocket port in Sriharikota, in Andhra Pradesh.

The launch is subject to weather conditions, the ISRO had earlier said.

CMS-01 is a communication satellite envisaged for providing services in Extended-C Band of the frequency spectrum, which will include the Indian mainland, Andaman and Nicobar and Lakshadweep Islands.

The 42nd communication satellite of India, it will have a mission life of seven years.

About 20 minutes into its flight, PSLV-C50 will eject CMS-01 into geosynchronous transfer orbit (GTO) and from there, the satellite will be taken up and positioned at geosynchronous stationary orbit.

The CMS-01 will be a replacement for GSAT-12 that weighed 1,410 kg and was launched on July 11, 2011 with a mission life of eight years.

ISRO Chairman K. Sivan had earlier said the PSLV-C50 rocket will be followed by the launch of new small rocket Small Satellite Launch Vehicle (SSLV) carrying EOS-02 (Earth Observation Satellite), and Geosynchronous Satellite Launch Vehicle-F10 (GSLV) carrying EOS-3.

The other Indian satellites that are ready for launch are GISAT and Microsat-2A.

The launch of the GISAT-1 satellite slated for March 5 this year was postponed due to technical reasons a day before the launch.

The GISAT-1 satellite will be carried by a GSLV rocket. The GSLV rocket was dismantled after the launch was called off, and is being refurbished. The rocket’s cryogenic engine has been brought down and it is being readied again.

The GSLV carrying GISAT-1 is expected to fly after PSLV C50.

  • Follow Us :
  • Tags
  • Actor
  • british
  • Chennai
  • CMS-01

Related News

  • Rachakonda Police intensify efforts to fight human trafficking

    Rachakonda Police intensify efforts to fight human trafficking

  • Hyderabad: Couple in critical condition after man attempts to kill them

    Hyderabad: Couple in critical condition after man attempts to kill them

  • Telangana: Departmental Test examinations from June 15 to 24

    Telangana: Departmental Test examinations from June 15 to 24

  • Haritha Haram makes Hyderabad an attractive destination

    Haritha Haram makes Hyderabad an attractive destination

  • Two children injured in wall collapse in Hyderabad

    Two children injured in wall collapse in Hyderabad

  • Telangana: CEO assures political parties to resolve all issues related to electoral rolls

    Telangana: CEO assures political parties to resolve all issues related to electoral rolls

Latest News

  • Senators call on TikTok CEO to explain ‘inaccurate’ statements about how company manages US data

    11 mins ago
  • Meta Verified badge arrives in India, starts from Rs 699

    32 mins ago
  • Opinion: Pursue own foreign policy

    7 hours ago
  • Editorial: Indo-US ties on upswing

    7 hours ago
  • Health and Tech: Carbon material vital in medical tech, devices

    8 hours ago
  • Fight Centre’s lopsided policies: KCR

    8 hours ago
  • Cartoon: June 8, 2023

    8 hours ago
  • Straight bat: Franchise cricket is here to dominate

    8 hours ago

company

  • Home
  • About Us
  • Contact Us

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

© Copyrights 2022 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam