Friday, Aug 7, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | News | Six Lane Highway To Ease Traffic Congestion From Madeenaguda To Sangareddy

Six-lane highway to ease traffic congestion from Madeenaguda to Sangareddy

Sangareddy: In a major move to ease the traffic congestion on NH-65 from Madeenaguda in Hyderabad to Pothireddypally junction in Sangareddy district where the city is fast expanding, the National Highways Authority of India (NHAI) has decided to build two six-lane roads to serve the highway traffic and local traffic. The road would witness over […]

By Telangana Today
Published Date - 23 May 2022, 04:41 PM
Six-lane highway to ease traffic congestion from Madeenaguda to Sangareddy
whatsapp facebook twitter telegram

Sangareddy: In a major move to ease the traffic congestion on NH-65 from Madeenaguda in Hyderabad to Pothireddypally junction in Sangareddy district where the city is fast expanding, the National Highways Authority of India (NHAI) has decided to build two six-lane roads to serve the highway traffic and local traffic. The road would witness over one lakh passenger carriage vehicles flow in a day in addition to the two-wheelers on the existing road. The traffic is expected to go up in the coming years.

The NHAI had already given the contract of surveying the road work for the 31-KM stretch to Jindal Consultancy which is on the job to prepare a detailed project report within six months. Speaking to Telangana Today, Executive Engineer NHAI Pailla Dharma Reddy has said that there would be a six-lane highway from Madeenaguda to Pothireddypally. The vehicles which will travel to Zaheerabad and Mumbai will have to take this road since there would be no chance to get down until the 31-KM road ends near Sangareddy.


Meanwhile, another six-lane carriageway will be built for the local traffic along the highway. Since the city was fast spreading towards Sangareddy town during the past few years, the NHAI officer said that traffic congestion was witnessed at many places such as in Lingampally, Patancheru, Isnapur, Sangarddy and a few other places. As the NHAI was not having sufficient land at Rudraram, Kandi and other places along the current NH-65, the NHAI would need to acquire a few acres of land for taking up the project. The Jindal Consultancy will prepare a detailed project on the number of acres that need to be acquired, the number of underpasses that need to be built and others along the 31-KM road.

When the SP M Ramana Kumar had examined the Patancheru to Isnapur stretch of the NH-65 following the appeal of the industrialists to examine the traffic congestion a few days ago, the NH officials informed the industrialists and Sangareddy Police that there would be a permanent solution to the issue soon. An industrialist from Pashamylaram Industrial Area P Chandu Kumar has welcomed the decision of the NHAI. Saying that they were finding it difficult to travel on this stretch, particularly during the peak hours, Chandu Kumar has said that the move will certainly ease the traffic congestion. He further said that the proposed 12-lane road will save time and fuel for vehicle users. While the DPR is expected to be completed in six months, the NHAI will initiate the process of finalising the tenders then after.

 

  • Follow Us :
  • Tags
  • Madeenaguda
  • NHAI
  • Sangareddy
  • Six-lane highway

Related News

  • Sangareddy: Govt doctor suspended for sending private doctor as substitute in Health Minister’s constituency

    Sangareddy: Govt doctor suspended for sending private doctor as substitute in Health Minister’s constituency

  • NCST intervention fails to bring bridge for Sangareddy tribal village

    NCST intervention fails to bring bridge for Sangareddy tribal village

  • Nallavagu project turns surplus after heavy rains in Medak

    Nallavagu project turns surplus after heavy rains in Medak

  • Nizam Sagar receives steady inflows after rains in Medak, Sangareddy

    Nizam Sagar receives steady inflows after rains in Medak, Sangareddy

Latest News

  • Central Bank’s MSME drive generates Rs 150 crore

    12 mins ago
  • Kothagudem Congress sarpanch accuses officials of blocking Rudrampur development

    37 mins ago
  • CBI chargesheet details arrests of 13 accused in NEET paper leak case

    52 mins ago
  • Govt holds technical talks with Meta over deepfakes, harmful AI content

    1 hour ago
  • BJP to contest GHMC elections alone, says N Ramchander Rao

    1 hour ago
  • Kendriya Vidyalaya Picket hosts anti-drug awareness drive in Hyderabad

    1 hour ago
  • No reason India cannot emerge as global mediation centre: CJI

    1 hour ago
  • JPSC-JSSC exam row: Student on indefinite fast shifted to ICU as health condition worsens

    1 hour ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam