Sunday, May 22, 2022
  • Hyderabad
  • Telangana
  • Andhra Pradesh
  • India
  • World
  • Entertainment
  • Science and Tech
  • Sport
  • Business
  • ...
    • NRI
    • View Point
    • cartoon
    • Columns
    • Reviews
    • Education Today
    • Property
    • Videos
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • Columns
  • Reviews
  • Education Today
  • Property
  • Videos
  • Lifestyle
Home | Business | Hyderabad Based Shirdi Sai Electricals Bags 4000 Mw Module Manufacturing Bid From Ireda

Hyderabad’s Shirdi Sai Electricals bags 4,000 MW module manufacturing bid from IREDA

By Telangana Today
Published: Published Date - 12:25 PM, Fri - 12 November 21
In the bids invited by IREDA for setting up Manufacturing facilities for ‘High Efficiency Solar PV Modules’, SSEL has participated and won this bid for a capacity of 4,000 MW to set up Polysilicon

Hyderabad: Indian Renewable Energy Development Agency (IREDA) has issued Letter of Award (LoA) to Hyderabad-based Shirdi Sai Electricals Limited (SSEL), for setting up manufacturing capacities for high efficiency solar PV modules under the Production Linked Incentive scheme (PLI) floated by Ministry of New & Renewable energy (MNRE).

In the bids invited by IREDA for setting up Manufacturing facilities for ‘High Efficiency Solar PV Modules’, SSEL has participated and won this bid for a capacity of 4,000 MW to set up Polysilicon + Ingot-Wafer + Cell + Module alongside other industrial groups like Reliance and Jindal.

Shirdi Sai Electricals said it has been operating in the transmission and distribution sector and has been manufacturing transformers for more than 25 years. As an EPC player, SSEL has installed more than 80,000 kms of LT and HT transmission lines and has worked on many complex turnkey projects in the domestic and international markets.

Based on techno-economic analysis, Central Electricity Authority (CEA) has indicated in their Optimum Energy Mix report that 2,80,000 MW capacity from solar energy will be needed by 2029-30 which needs an installation of 25,000 MW per annum of Solar energy till 2030.

With this vision in mind, the Cabinet has approved Production Linked Incentive (PLI) for enhancing India’s manufacturing capabilities and exports under Atmanirbhar Bharat initiative.

One of the schemes approved by the Cabinet is Manufacturing ‘High Efficiency Solar PV Modules’ with a financial outlay of Rs 4,500 crore over a five-year period and Indian Renewable Energy Development Agency Limited (IREDA), was appointed as an implementing agency for this scheme by MNRE.


Now you can get handpicked stories from Telangana Today on Telegram everyday. Click the link to subscribe.

Click to follow Telangana Today Facebook page and Twitter .

  • Follow Us :
  • Tags
  • Hyderabad

Related News

  • Hyderabad’s Malkam Cheruvu turns idyllic spot

  • Hyderabad: Swanky skywalk to ease pedestrian woes at Mehdipatnam

  • Hyderabad: Woman kills step son at Kachiguda

  • Siddipet: Two youth drown in Kondapochamma Sagar

  • MANUU to organise three-day national conference on Gender and Inclusion

  • YMCA Secunderabad enters semis of Hyderabad Open basketball tournament

Latest News

  • Opinion: Renewables cannot replace coal

    1 hour ago
  • Game On: A return to the basics

    2 hours ago
  • Editorial: Unequal Republic

    2 hours ago
  • AC Milan secure 1st Serie A title in 11 years

    2 hours ago
  • Current Affairs: Who did what and when?

    2 hours ago
  • IPL 2022: PBKS register 5-wicket win over SRH, finish tournament on a high

    3 hours ago
  • Hyderabad: ‘Okati coffee’ will soothe your soul

    3 hours ago
  • Know the Science behind detecting antibodies

    3 hours ago

company

  • Home
  • About Us
  • Contact Us

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

© Copyrights 2022 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam