Thursday, Sep 10, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | News | Nasa Not To Go For Artemis I Launch In Early Sep After 2 Failed Attempts

NASA not to go for Artemis I launch in early Sep after 2 failed attempts

To meet the requirement for the certification on the flight termination system, currently set at 25 days, NASA will need to roll the rocket and spacecraft back to the vehicle assembly building (VAB) before the next launch attempt to reset the system's batteries.

By IANS
Updated On - 4 September 2022, 12:51 PM
NASA not to go for Artemis I launch in early Sep after 2 failed attempts
whatsapp facebook twitter telegram

Washington: The US space agency has decided not to attempt the launch of the Artemis I Moon mission in early September as the teams were reviewing options after two failed attempts.

After standing down on Artemis I’s second launch attempt on Saturday, when engineers could not overcome a hydrogen leak in a quick disconnect — an interface between the liquid hydrogen fuel feed line and the Space Launch System (SLS) rocket — mission managers met and decided they will forego additional launch attempts in early September.

Also Read

  • Fuel leak ruins NASA’s 2nd shot at launching moon rocket
  • Here’s why the one-word tweets are trending on Twitter
  • Hackers exploit NASA’s famous deep space image to attack computers

“Over the next several days, teams will establish access to the area of the leak at Launch Pad 39B, and in parallel conduct a schedule assessment to provide additional data that will inform a decision on whether to perform work to replace a seal either at the pad, where it can be tested under cryogenic conditions, or inside the Vehicle Assembly Building,a the US space agency said in a statement.

To meet the requirement for the certification on the flight termination system, currently set at 25 days, NASA will need to roll the rocket and spacecraft back to the vehicle assembly building (VAB) before the next launch attempt to reset the system’s batteries.

The flight termination system is required on all rockets to protect public safety.

During the second launch attempt, engineers saw a leak in a cavity between the ground side and rocket side plates surrounding an 8-inch line used to fill and drain liquid hydrogen from the SLS rocket.

Three attempts at reseating the seal were unsuccessful, said NASA.

“While the rocket remained safe and it is too early to tell whether the bump in pressurisation contributed to the cause of the leaky seal, engineers are examining the issue,” said the space agency.

Because of the complex orbital mechanics involved in launching to the Moon, NASA would have had to launch Artemis I by September 6 as part of the current launch period, which now looks extremely difficult.

The US space agency on August 30 scrubbed the mission launch for the first time owing to technical glitch with one of the SLS rocket’s engines.

  • Follow Us :
  • Tags
  • Moon mission
  • Space Launch System

Related News

  • ISRO chief says India overcame Cryogenic technology denial, eyes moon landing by 2040

    ISRO chief says India overcame Cryogenic technology denial, eyes moon landing by 2040

  • Beyond Chandrayaan-3: ISRO developing long-life moon landers

    Beyond Chandrayaan-3: ISRO developing long-life moon landers

  • G20 satellite expected to be launched in 2027: ISRO chief Narayanan

    G20 satellite expected to be launched in 2027: ISRO chief Narayanan

  • ASA’s Artemis II astronauts return safely to Earth after historic mission around the Moon

    ASA’s Artemis II astronauts return safely to Earth after historic mission around the Moon

Latest News

  • Hyderabad couple deaths: Man dies by suicide, wife dies hours later

    5 minutes ago
  • iPhone 18 prices in India may rise up to 43 pc; foldable Duo to cost Rs 4.5 lakh

    8 minutes ago
  • Khammam man allegedly kills wife, abandons body in car; police launch search

    19 minutes ago
  • Hyderabad: Musi Riverfront project faces protest as residents raise displacement concerns

    36 minutes ago
  • DGP CV Anand urges Telangana police to stay away from online betting, addictions

    52 minutes ago
  • CMC carries out 17 demolitions against unauthorised constructions in Cyberabad

    1 hour ago
  • BGUS raises concerns over Ganesh immersion arrangements in Hyderabad

    1 hour ago
  • Naga Chaitanya’s Vrushakarma set for December 4 release

    2 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App